Proposal:H.015025.6
Parish:St. Helena
Description:MCLIN ROAD OVER DUTCHMAN CREEK
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, PRECAST CONCRETE PILES (16"), CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,438,223.50
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $1,569,692.90 |
| 2 | 56994 | Matt L. Guinn Construction, LLC | $1,976,775.27 |
| 3 | 00044 | Guinn Construction, LLC | $2,388,463.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Matt L. Guinn Construction, LLC | - 3 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.1 | LUMP | 180,000.00 | 180,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,200.00 | 3,200.00 | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,181 | SQYD | 11.00 | 12,991.00 | 15.00 | 17,715.00 | 10.00 | 11,810.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 105+21.52; 15' W x 50' L; TIMBER) | 750 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 481 | CUYD | 24.00 | 11,544.00 | 35.00 | 16,835.00 | 50.00 | 24,050.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 73,000.00 | 73,000.00 | 70,000.00 | 70,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 225.00 | 2,025.00 | 300.00 | 2,700.00 | 500.00 | 4,500.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,152 | LNFT | 3.00 | 3,456.00 | 4.00 | 4,608.00 | 5.00 | 5,760.00 | | 0009 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 1,495.4 | SQYD | 70.00 | 104,678.00 | 85.00 | 127,109.00 | 115.00 | 171,971.00 | | 0010 | 304-01-00100 | Lime | 21.2 | TON | 270.00 | 5,724.00 | 0.10 | 2.12 | 750.00 | 15,900.00 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 1,495 | SQYD | 5.00 | 7,475.00 | 0.10 | 149.50 | 15.00 | 22,425.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 283.7 | TON | 170.00 | 48,229.00 | 260.00 | 73,762.00 | 300.00 | 85,110.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 200.00 | 8,000.00 | 300.00 | 12,000.00 | 350.00 | 14,000.00 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 29.00 | 1,812.50 | 60.00 | 3,750.00 | 35.00 | 2,187.50 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | 170.00 | 17,000.00 | 125.00 | 12,500.00 | | 0016 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 2,950.00 | 11,800.00 | 4,950.00 | 19,800.00 | 3,500.00 | 14,000.00 | | 0017 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 581 | SQYD | 110.00 | 63,910.00 | 130.00 | 75,530.00 | 200.00 | 116,200.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 581 | SQYD | 2.80 | 1,626.80 | 6.00 | 3,486.00 | 10.00 | 5,810.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0020 | 725-02-00100 | Low Profile Runaround | 1 | EACH | 150,000.00 | 150,000.00 | 400,000.00 | 400,000.00 | 275,000.00 | 275,000.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 155,000.00 | 155,000.00 | 165,000.00 | 165,000.00 | 250,000.00 | 250,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 300.00 | 1,200.00 | 200.00 | 800.00 | | 0023 | 739-01-00100 | Hydro-Seeding | 0.79 | ACRE | 5,200.00 | 4,108.00 | 4,500.00 | 3,555.00 | 12,000.00 | 9,480.00 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,800.00 | 2,800.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0025 | 804-01-00300 | Precast Concrete Piles (16") | 1,600 | LNFT | 125.00 | 200,000.00 | 158.00 | 252,800.00 | 200.00 | 320,000.00 | | 0026 | 805-01-00100 | Class A1 Concrete (Slab Span) | 97.04 | CUYD | 1,400.00 | 135,856.00 | 3,000.00 | 291,120.00 | 3,850.00 | 373,604.00 | | 0027 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 23.82 | CUYD | 3,200.00 | 76,224.00 | 3,800.00 | 90,516.00 | 5,000.00 | 119,100.00 | | 0028 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,072 | SQFT | 2.00 | 2,144.00 | 2.00 | 2,144.00 | 4.00 | 4,288.00 | | 0029 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,072 | SQFT | 3.00 | 3,216.00 | 2.00 | 2,144.00 | 4.00 | 4,288.00 | | 0030 | 806-01-00100 | Deformed Reinforcing Steel | 26,451 | LB | 1.60 | 42,321.60 | 2.15 | 56,869.65 | 2.25 | 59,514.75 | | 0031 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 260.00 | 20,800.00 | 365.00 | 29,200.00 | 375.00 | 30,000.00 | | 0032 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 260.00 | 20,800.00 | 400.00 | 32,000.00 | 400.00 | 32,000.00 | | 0033 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 515 | SQFT | 160.00 | 82,400.00 | 118.00 | 60,770.00 | 175.00 | 90,125.00 | | 0034 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 74 | SFIN | 170.00 | 12,580.00 | 195.00 | 14,430.00 | 200.00 | 14,800.00 | | 0035 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 22.00 | 2,640.00 | 25.00 | 3,000.00 | 50.00 | 6,000.00 | | 0036 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 108 | INLF | 9.00 | 972.00 | 10.00 | 1,080.00 | 30.00 | 3,240.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,569,692.90 | | 1,976,775.27 | | 2,388,463.25 |
|