Proposal:H.014233.6
Parish:Bossier
Routes:LA 160
Description:LA 160: CYPRESS BAYOU & RELIEF BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$4,199,395.25
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $4,024,182.00 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $4,620,542.30 |
| 3 | 49239 | WL Bass Construction Inc. | $4,949,244.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 140,000.00 | 140,000.00 | 100,000.00 | 100,000.00 | 222,000.00 | 222,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 9,600.00 | 9,600.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,136.2 | SQYD | 8.00 | 17,089.60 | 11.00 | 23,498.20 | 5.00 | 10,681.00 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 04080850303141 (STA 112+38.83; 28' x 56' COPCSS) | 1,568 | LUMP | 110,000.00 | 110,000.00 | 46,000.00 | 46,000.00 | 122,000.00 | 122,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Removal of Bridge Str. No. 04080850303171 (STA 114+42.12; 28' x 133' COPCSS) | 3,724 | LUMP | 110,000.00 | 110,000.00 | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 144 | LNFT | 16.50 | 2,376.00 | 10.00 | 1,440.00 | 1.00 | 144.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 953.1 | LNFT | 50.00 | 47,655.00 | 15.00 | 14,296.50 | 15.00 | 14,296.50 | | 0008 | 203-02-00100 | Drainage Excavation | 1,753 | CUYD | 17.50 | 30,677.50 | 30.00 | 52,590.00 | 18.00 | 31,554.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 145,000.00 | 145,000.00 | 200,000.00 | 200,000.00 | 470,000.00 | 470,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 275.00 | 825.00 | 200.00 | 600.00 | 200.00 | 600.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,670 | LNFT | 4.50 | 7,515.00 | 4.50 | 7,515.00 | 4.00 | 6,680.00 | | 0012 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 1,856.4 | SQYD | 49.00 | 90,963.60 | 65.00 | 120,666.00 | 82.00 | 152,224.80 | | 0013 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 1,000.00 | 4,000.00 | 1,200.00 | 4,800.00 | 600.00 | 2,400.00 | | 0014 | 304-01-00100 | Lime | 26.31 | TON | 400.00 | 10,524.00 | 580.00 | 15,259.80 | 250.00 | 6,577.50 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 1,855 | SQYD | 5.00 | 9,275.00 | 13.00 | 24,115.00 | 7.00 | 12,985.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 436.4 | TON | 225.00 | 98,190.00 | 250.00 | 109,100.00 | 250.00 | 109,100.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 88.8 | TON | 250.00 | 22,200.00 | 300.00 | 26,640.00 | 310.00 | 27,528.00 | | 0018 | 510-01-00001 | Pavement Patching 14.5" MINIMUM THICKNESS | 236 | SQYD | 165.00 | 38,940.00 | 400.00 | 94,400.00 | 125.00 | 29,500.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 237.8 | LNFT | 38.00 | 9,036.40 | 36.00 | 8,560.80 | 36.00 | 8,560.80 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 140.00 | 28,000.00 | 136.00 | 27,200.00 | 136.00 | 27,200.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 4,000.00 | 8,000.00 | 3,700.00 | 7,400.00 | 3,700.00 | 7,400.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,200.00 | 8,400.00 | 4,050.00 | 8,100.00 | 4,050.00 | 8,100.00 | | 0023 | 705-01-00100 | Barbed Wire Fence | 144 | LNFT | 25.00 | 3,600.00 | 15.00 | 2,160.00 | 15.00 | 2,160.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 600.00 | 4,800.00 | 600.00 | 4,800.00 | 400.00 | 3,200.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 200.00 | 1,600.00 | 200.00 | 1,600.00 | 100.00 | 800.00 | | 0026 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,424 | SQYD | 110.00 | 266,640.00 | 130.00 | 315,120.00 | 110.00 | 266,640.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 2,424 | SQYD | 3.00 | 7,272.00 | 3.00 | 7,272.00 | 4.00 | 9,696.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 2.5 | TON | 2,200.00 | 5,500.00 | 950.00 | 2,375.00 | 950.00 | 2,375.00 | | 0030 | 717-01-00100 | Seeding | 47 | LB | 30.00 | 1,410.00 | 25.00 | 1,175.00 | 25.00 | 1,175.00 | | 0031 | 718-01-00100 | Fertilizer | 1,446 | LB | 1.15 | 1,662.90 | 0.75 | 1,084.50 | 1.00 | 1,446.00 | | 0032 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 605 | SQYD | 4.50 | 2,722.50 | 2.50 | 1,512.50 | 3.00 | 1,815.00 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 7,500.00 | 7,500.00 | 30,000.00 | 30,000.00 | 11,500.00 | 11,500.00 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.342 | MILE | 20,000.00 | 6,840.00 | 20,000.00 | 6,840.00 | 300.00 | 102.60 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 390,000.00 | 390,000.00 | 400,000.00 | 400,000.00 | 494,900.00 | 494,900.00 | | 0036 | 729-01-00100 | Sign (Type A) | 24.3 | SQFT | 55.00 | 1,336.50 | 50.00 | 1,215.00 | 50.00 | 1,215.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 150.00 | 1,200.00 | 125.00 | 1,000.00 | 125.00 | 1,000.00 | | 0038 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 250.00 | 750.00 | 200.00 | 600.00 | 150.00 | 450.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 45 | EACH | 20.00 | 900.00 | 50.00 | 2,250.00 | 50.00 | 2,250.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.684 | MILE | 15,000.00 | 10,260.00 | 15,000.00 | 10,260.00 | 15,000.00 | 10,260.00 | | 0041 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 250,000.00 | 250,000.00 | 260,000.00 | 260,000.00 | | 0043 | 804-01-00400 | Precast Concrete Piles (18") | 4,200 | LNFT | 155.00 | 651,000.00 | 195.00 | 819,000.00 | 225.00 | 945,000.00 | | 0044 | 805-01-00100 | Class A1 Concrete (Slab Span) | 383.88 | CUYD | 1,550.00 | 595,014.00 | 1,500.00 | 575,820.00 | 350.00 | 134,358.00 | | 0045 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 111.98 | CUYD | 2,000.00 | 223,960.00 | 2,500.00 | 279,950.00 | 350.00 | 39,193.00 | | 0046 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,225 | SQFT | 3.00 | 9,675.00 | 1.00 | 3,225.00 | 5.00 | 16,125.00 | | 0047 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,225 | SQFT | 3.00 | 9,675.00 | 2.00 | 6,450.00 | 4.00 | 12,900.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 90,012 | LB | 1.75 | 157,521.00 | 2.00 | 180,024.00 | 4.00 | 360,048.00 | | 0049 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 480 | LNFT | 275.00 | 132,000.00 | 205.00 | 98,400.00 | 287.00 | 137,760.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 140.00 | 358,400.00 | 110.00 | 281,600.00 | 190.00 | 486,400.00 | | 0051 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 336 | SFIN | 117.00 | 39,312.00 | 140.00 | 47,040.00 | 155.00 | 52,080.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 448 | LNFT | 18.00 | 8,064.00 | 30.00 | 13,440.00 | 15.00 | 6,720.00 | | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 320 | LNFT | 20.00 | 6,400.00 | 15.00 | 4,800.00 | 16.00 | 5,120.00 | | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 384 | LNFT | 5.00 | 1,920.00 | 2.00 | 768.00 | 1.00 | 384.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 540 | INLF | 2.00 | 1,080.00 | 2.00 | 1,080.00 | 1.00 | 540.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,024,182.00 | | 4,620,542.30 | | 4,949,244.20 |
|