Proposal:H.014088.6
Parish:Ascension
Routes:LA 427, US 61
Description:US 61: INT. IMPROVEMENTS AT LA 427
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, SIGNALIZATION, INTELLIGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$3,174,393.88
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $4,544,679.53 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,614,644.10 |
| 3 | 34263 | La Contracting Enterprise LLC | $4,801,344.00 |
| 4 | 06276 | Barriere Construction Co., LLC | $5,089,226.98 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - La Contracting Enterprise LLC | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 210 | SQYD | 25.00 | 5,250.00 | 30.00 | 6,300.00 | 34.00 | 7,140.00 | 80.00 | 16,800.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 1,677 | SQYD | 25.00 | 41,925.00 | 25.00 | 41,925.00 | 34.00 | 57,018.00 | 40.00 | 67,080.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 11 | EACH | 500.00 | 5,500.00 | 800.00 | 8,800.00 | 1,800.00 | 19,800.00 | 1,660.00 | 18,260.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 310 | SQYD | 25.00 | 7,750.00 | 30.00 | 9,300.00 | 40.00 | 12,400.00 | 27.00 | 8,370.00 | | 0005 | 202-02-26000 | Removal of Manholes | 1 | EACH | 500.00 | 500.00 | 800.00 | 800.00 | 2,500.00 | 2,500.00 | 2,013.00 | 2,013.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 24" RCPA | 80 | LNFT | 25.00 | 2,000.00 | 17.00 | 1,360.00 | 45.00 | 3,600.00 | 45.00 | 3,600.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP, 30" RCPA, 36" RCPA | 1,151 | LNFT | 25.00 | 28,775.00 | 22.00 | 25,322.00 | 50.00 | 57,550.00 | 45.00 | 51,795.00 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 10,640.00 | 10,640.00 | 3,500.00 | 3,500.00 | | 0009 | 202-03-38000 | Relocation of Sign | 19 | EACH | 500.00 | 9,500.00 | 60.00 | 1,140.00 | 23.00 | 437.00 | 260.00 | 4,940.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 125,000.00 | 125,000.00 | 350,000.00 | 350,000.00 | 240,000.00 | 240,000.00 | 405,000.00 | 405,000.00 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 628 | LNFT | 25.00 | 15,700.00 | 13.00 | 8,164.00 | 35.00 | 21,980.00 | 40.00 | 25,120.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 250 | EACH | 10.00 | 2,500.00 | 25.00 | 6,250.00 | 17.00 | 4,250.00 | 56.00 | 14,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 150.00 | 3,000.00 | 150.00 | 3,000.00 | 200.00 | 4,000.00 | 180.00 | 3,600.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 3,914 | LNFT | 5.00 | 19,570.00 | 2.50 | 9,785.00 | 2.50 | 9,785.00 | 2.10 | 8,219.40 | | 0016 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 3,665 | SQYD | 50.00 | 183,250.00 | 60.00 | 219,900.00 | 51.50 | 188,747.50 | 42.00 | 153,930.00 | | 0017 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 1,795 | SQYD | 75.00 | 134,625.00 | 120.00 | 215,400.00 | 75.00 | 134,625.00 | 84.00 | 150,780.00 | | 0018 | 304-01-00100 | Lime | 13.75 | TON | 450.00 | 6,187.50 | 350.00 | 4,812.50 | 440.00 | 6,050.00 | 511.00 | 7,026.25 | | 0019 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 521 | SQYD | 45.00 | 23,445.00 | 20.00 | 10,420.00 | 17.00 | 8,857.00 | 30.00 | 15,630.00 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 449 | SQYD | 35.00 | 15,715.00 | 20.00 | 8,980.00 | 18.00 | 8,082.00 | 35.00 | 15,715.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 600 | CUYD | 100.00 | 60,000.00 | 100.00 | 60,000.00 | 156.00 | 93,600.00 | 110.00 | 66,000.00 | | 0022 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 500 | SQYD | 150.00 | 75,000.00 | 90.00 | 45,000.00 | 200.00 | 100,000.00 | 52.00 | 26,000.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 3,782.6 | TON | 225.00 | 851,085.00 | 180.00 | 680,868.00 | 240.00 | 907,824.00 | 200.00 | 756,520.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 41.7 | TON | 575.00 | 23,977.50 | 380.00 | 15,846.00 | 740.00 | 30,858.00 | 600.00 | 25,020.00 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 8,260 | SQYD | 10.00 | 82,600.00 | 10.00 | 82,600.00 | 9.50 | 78,470.00 | 7.50 | 61,950.00 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -567 | CUYD | 0.01 | -5.67 | 0.00 | 0.00 | 0.01 | -5.67 | 0.01 | -5.67 | | 0027 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 427.5 | SQYD | 250.00 | 106,875.00 | 175.00 | 74,812.50 | 190.00 | 81,225.00 | 150.00 | 64,125.00 | | 0028 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 50 | SQYD | 175.00 | 8,750.00 | 340.00 | 17,000.00 | 145.00 | 7,250.00 | 520.00 | 26,000.00 | | 0029 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 56 | LNFT | 175.00 | 9,800.00 | 245.00 | 13,720.00 | 300.00 | 16,800.00 | 315.00 | 17,640.00 | | 0030 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 16 | LNFT | 150.00 | 2,400.00 | 265.00 | 4,240.00 | 135.00 | 2,160.00 | 250.00 | 4,000.00 | | 0031 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 704 | LNFT | 225.00 | 158,400.00 | 300.00 | 211,200.00 | 127.00 | 89,408.00 | 250.00 | 176,000.00 | | 0032 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 592 | LNFT | 250.00 | 148,000.00 | 365.00 | 216,080.00 | 203.00 | 120,176.00 | 300.00 | 177,600.00 | | 0033 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 184 | LNFT | 300.00 | 55,200.00 | 475.00 | 87,400.00 | 285.00 | 52,440.00 | 315.00 | 57,960.00 | | 0034 | 701-14-00100 | Cleaning Existing Pipes | 389 | LNFT | 25.00 | 9,725.00 | 45.00 | 17,505.00 | 48.00 | 18,672.00 | 100.00 | 38,900.00 | | 0035 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 12,500.00 | 12,500.00 | 7,000.00 | 7,000.00 | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 17 | EACH | 7,500.00 | 127,500.00 | 7,000.00 | 119,000.00 | 7,800.00 | 132,600.00 | 6,900.00 | 117,300.00 | | 0037 | 702-04-00210 | Convert Catch Basins to Manholes | 3 | EACH | 5,000.00 | 15,000.00 | 2,250.00 | 6,750.00 | 3,800.00 | 11,400.00 | 2,100.00 | 6,300.00 | | 0038 | 702-07-00100 | Cross Drain Safety End (Type 1) | 1 | EACH | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 4,600.00 | 4,600.00 | 4,900.00 | 4,900.00 | | 0039 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 4,700.00 | 4,700.00 | 4,900.00 | 4,900.00 | | 0040 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 13,000.00 | 13,000.00 | 9,800.00 | 9,800.00 | | 0041 | 703-01-00100 | Shoulder Underdrain Systems | 1,894 | LNFT | 50.00 | 94,700.00 | 6.00 | 11,364.00 | 44.00 | 83,336.00 | 39.00 | 73,866.00 | | 0042 | 706-02-00400 | Concrete Drive (10" Thick) | 261 | SQYD | 150.00 | 39,150.00 | 175.00 | 45,675.00 | 135.00 | 35,235.00 | 150.00 | 39,150.00 | | 0043 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 2,787 | SQYD | 75.00 | 209,025.00 | 30.00 | 83,610.00 | 73.00 | 203,451.00 | 100.00 | 278,700.00 | | 0044 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 151 | SQYD | 100.00 | 15,100.00 | 125.00 | 18,875.00 | 152.00 | 22,952.00 | 130.00 | 19,630.00 | | 0045 | 707-01-00100 | Concrete Curb | 243 | LNFT | 25.00 | 6,075.00 | 125.00 | 30,375.00 | 42.00 | 10,206.00 | 100.00 | 24,300.00 | | 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 495,000.00 | 495,000.00 | 530,000.00 | 530,000.00 | 475,000.00 | 475,000.00 | | 0047 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,757 | LNFT | 1.00 | 3,757.00 | 0.25 | 939.25 | 1.20 | 4,508.40 | 1.25 | 4,696.25 | | 0048 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,419 | LNFT | 1.00 | 1,419.00 | 0.50 | 709.50 | 1.75 | 2,483.25 | 1.25 | 1,773.75 | | 0049 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.17 | MILE | 1,000.00 | 170.00 | 1,200.00 | 204.00 | 1,200.00 | 204.00 | 1,150.00 | 195.50 | | 0050 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.9 | MILE | 1,250.00 | 3,625.00 | 1,200.00 | 3,480.00 | 1,500.00 | 4,350.00 | 1,150.00 | 3,335.00 | | 0051 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 4 | EACH | 100.00 | 400.00 | 25.00 | 100.00 | 60.00 | 240.00 | 75.00 | 300.00 | | 0052 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 18 | EACH | 100.00 | 1,800.00 | 25.00 | 450.00 | 60.00 | 1,080.00 | 75.00 | 1,350.00 | | 0053 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 100.00 | 800.00 | 25.00 | 200.00 | 60.00 | 480.00 | 75.00 | 600.00 | | 0054 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 4 | EACH | 100.00 | 400.00 | 25.00 | 100.00 | 60.00 | 240.00 | 75.00 | 300.00 | | 0055 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | 3,500.00 | 3,500.00 | 2,527.76 | 2,527.76 | 35,000.00 | 35,000.00 | | 0056 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.35 | MILE | 50,000.00 | 17,500.00 | 400.00 | 140.00 | 360.00 | 126.00 | 30,000.00 | 10,500.00 | | 0057 | 726-01-00100 | Bedding Material | 427.6 | CUYD | 100.00 | 42,760.00 | 155.00 | 66,278.00 | 185.00 | 79,106.00 | 135.00 | 57,726.00 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 460,000.00 | 460,000.00 | 450,000.00 | 450,000.00 | 475,000.00 | 475,000.00 | | 0059 | 729-01-00100 | Sign (Type A) | 127.5 | SQFT | 25.00 | 3,187.50 | 78.00 | 9,945.00 | 33.50 | 4,271.25 | 32.00 | 4,080.00 | | 0060 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 18 | SQFT | 50.00 | 900.00 | 120.00 | 2,160.00 | 28.00 | 504.00 | 38.00 | 684.00 | | 0061 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 50.00 | 900.00 | 60.00 | 1,080.00 | 175.00 | 3,150.00 | 200.00 | 3,600.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,640 | EACH | 10.00 | 16,400.00 | 6.00 | 9,840.00 | 12.00 | 19,680.00 | 12.00 | 19,680.00 | | 0063 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,944.9 | LNFT | 4.00 | 7,779.60 | 4.50 | 8,752.05 | 4.40 | 8,557.56 | 5.00 | 9,724.50 | | 0064 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,640 | LNFT | 15.00 | 24,600.00 | 16.50 | 27,060.00 | 18.00 | 29,520.00 | 16.00 | 26,240.00 | | 0065 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 28 | LNFT | 4.00 | 112.00 | 11.00 | 308.00 | 4.40 | 123.20 | 5.00 | 140.00 | | 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.9 | MILE | 5,000.00 | 14,500.00 | 6,100.00 | 17,690.00 | 5,400.00 | 15,660.00 | 4,600.00 | 13,340.00 | | 0067 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.17 | MILE | 2,250.00 | 382.50 | 2,800.00 | 476.00 | 2,400.00 | 408.00 | 2,100.00 | 357.00 | | 0068 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.45 | MILE | 11,000.00 | 4,950.00 | 6,700.00 | 3,015.00 | 12,000.00 | 5,400.00 | 11,000.00 | 4,950.00 | | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 500.00 | 1,000.00 | 425.00 | 850.00 | 440.00 | 880.00 | 500.00 | 1,000.00 | | 0070 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 17 | EACH | 500.00 | 8,500.00 | 375.00 | 6,375.00 | 440.00 | 7,480.00 | 500.00 | 8,500.00 | | 0071 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 500.00 | 3,500.00 | 375.00 | 2,625.00 | 440.00 | 3,080.00 | 500.00 | 3,500.00 | | 0072 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 500.00 | 2,000.00 | 830.00 | 3,320.00 | 440.00 | 1,760.00 | 500.00 | 2,000.00 | | 0073 | 736-01-00100 | Trenching and Backfilling | 1,960 | LNFT | 10.00 | 19,600.00 | 13.00 | 25,480.00 | 10.20 | 19,992.00 | 13.00 | 25,480.00 | | 0074 | 736-03-00100 | Jacking or Boring | 350 | LNFT | 50.00 | 17,500.00 | 46.00 | 16,100.00 | 36.00 | 12,600.00 | 25.00 | 8,750.00 | | 0075 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 30,000.00 | 30,000.00 | 23,000.00 | 23,000.00 | 24,000.00 | 24,000.00 | 26,000.00 | 26,000.00 | | 0076 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 3 | EACH | 35,000.00 | 105,000.00 | 27,000.00 | 81,000.00 | 29,000.00 | 87,000.00 | 29,000.00 | 87,000.00 | | 0077 | 736-04-10700 | Signal Pole (Single Mast Arm, 70ft) | 2 | EACH | 40,000.00 | 80,000.00 | 34,000.00 | 68,000.00 | 37,500.00 | 75,000.00 | 36,000.00 | 72,000.00 | | 0078 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 8 | EACH | 1,250.00 | 10,000.00 | 1,250.00 | 10,000.00 | 1,280.00 | 10,240.00 | 1,425.00 | 11,400.00 | | 0079 | 736-05-30002 | Signal Heads (3 Section, 12 inch Optically Programmed Lens, R, Y, G) | 4 | EACH | 4,000.00 | 16,000.00 | 4,400.00 | 17,600.00 | 4,140.00 | 16,560.00 | 4,750.00 | 19,000.00 | | 0080 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 3 | EACH | 1,250.00 | 3,750.00 | 1,350.00 | 4,050.00 | 1,265.00 | 3,795.00 | 1,250.00 | 3,750.00 | | 0081 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | 1,620.00 | 3,240.00 | 1,550.00 | 3,100.00 | | 0082 | 736-05-41201 | Signal Heads (4 Section, 12" Optically Programmed Lens, LT. R, SLT. Y, FLT. Y, LT. G) | 2 | EACH | 5,000.00 | 10,000.00 | 5,100.00 | 10,200.00 | 4,900.00 | 9,800.00 | 5,500.00 | 11,000.00 | | 0083 | 736-06-00100 | Signal Service | 1 | EACH | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 2,565.00 | 2,565.00 | 1,750.00 | 1,750.00 | | 0084 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 4,100.00 | 4,100.00 | 4,000.00 | 4,000.00 | | 0085 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 15,000.00 | 15,000.00 | 8,400.00 | 8,400.00 | 8,350.00 | 8,350.00 | 8,400.00 | 8,400.00 | | 0086 | 736-10-00200 | Underground Junction Box (Type E) | 7 | EACH | 2,000.00 | 14,000.00 | 1,100.00 | 7,700.00 | 1,530.00 | 10,710.00 | 1,500.00 | 10,500.00 | | 0087 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 2,250.00 | 15,750.00 | 1,300.00 | 9,100.00 | 1,760.00 | 12,320.00 | 1,500.00 | 10,500.00 | | 0088 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 3,000.00 | 3,000.00 | 2,300.00 | 2,300.00 | 2,650.00 | 2,650.00 | 2,900.00 | 2,900.00 | | 0089 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 130 | LNFT | 10.00 | 1,300.00 | 7.00 | 910.00 | 7.00 | 910.00 | 8.00 | 1,040.00 | | 0090 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 1,430 | LNFT | 15.00 | 21,450.00 | 9.00 | 12,870.00 | 12.00 | 17,160.00 | 11.00 | 15,730.00 | | 0091 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,080 | LNFT | 20.00 | 21,600.00 | 12.00 | 12,960.00 | 20.50 | 22,140.00 | 13.00 | 14,040.00 | | 0092 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 6,585 | LNFT | 2.00 | 13,170.00 | 1.70 | 11,194.50 | 1.40 | 9,219.00 | 4.00 | 26,340.00 | | 0093 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 70 | LNFT | 10.00 | 700.00 | 7.00 | 490.00 | 8.50 | 595.00 | 12.00 | 840.00 | | 0094 | 736-12-06014 | Conductor (6c, #14 awg) | 715 | LNFT | 5.00 | 3,575.00 | 2.50 | 1,787.50 | 3.50 | 2,502.50 | 5.00 | 3,575.00 | | 0095 | 736-12-10014 | Conductor (10c, #14 awg) | 4,255 | LNFT | 7.00 | 29,785.00 | 3.60 | 15,318.00 | 5.75 | 24,466.25 | 6.00 | 25,530.00 | | 0096 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 10,000.00 | 40,000.00 | 6,200.00 | 24,800.00 | 8,200.00 | 32,800.00 | 7,500.00 | 30,000.00 | | 0097 | 736-15-04800 | Signal Support (Foundation, 48 inch Minimum Diameter) | 2 | EACH | 20,000.00 | 40,000.00 | 29,000.00 | 58,000.00 | 16,100.00 | 32,200.00 | 23,000.00 | 46,000.00 | | 0098 | 737-05-00002 | Painted Curbs | 3,071 | LNFT | 5.00 | 15,355.00 | 1.70 | 5,220.70 | 2.50 | 7,677.50 | 5.00 | 15,355.00 | | 0099 | 739-01-00100 | Hydro-Seeding | 0.97 | ACRE | 5,000.00 | 4,850.00 | 5,000.00 | 4,850.00 | 4,800.00 | 4,656.00 | 4,000.00 | 3,880.00 | | 0100 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 33,000.00 | 33,000.00 | 117,550.00 | 117,550.00 | | 0101 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | | 0102 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | 30,000.00 | 30,000.00 | | 0103 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 37,492 | INLF | 0.50 | 18,746.00 | 0.80 | 29,993.60 | 1.25 | 46,865.00 | 0.50 | 18,746.00 | | 0104 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,038 | INLF | 5.00 | 5,190.00 | 1.00 | 1,038.00 | 1.25 | 1,297.50 | 1.00 | 1,038.00 | | 0105 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 12,500.00 | 50,000.00 | 15,000.00 | 60,000.00 | 15,000.00 | 60,000.00 | 25,000.00 | 100,000.00 | | 0106 | NS-736-00001 | GPS | 1 | EACH | 1,000.00 | 1,000.00 | 450.00 | 450.00 | 600.00 | 600.00 | 550.00 | 550.00 | | 0107 | NS-736-00003 | Managed Ethernet Switch | 1 | EACH | 5,000.00 | 5,000.00 | 3,800.00 | 3,800.00 | 3,500.00 | 3,500.00 | 4,100.00 | 4,100.00 | | 0108 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | | 0109 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 1 | EACH | 15,000.00 | 15,000.00 | 8,500.00 | 8,500.00 | 13,000.00 | 13,000.00 | 12,000.00 | 12,000.00 | | 0110 | NS-ITS-03255 | Bluetooth Data Collection Unit Ethernet POE, Furnish & Install | 1 | EACH | 15,000.00 | 15,000.00 | 5,500.00 | 5,500.00 | 14,000.00 | 14,000.00 | 6,250.00 | 6,250.00 | | 0111 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 1 | EACH | 150.00 | 150.00 | 210.00 | 210.00 | 135.00 | 135.00 | 300.00 | 300.00 | | 0112 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 12 | EACH | 50.00 | 600.00 | 57.00 | 684.00 | 55.00 | 660.00 | 42.00 | 504.00 | | 0113 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 12 | EACH | 100.00 | 1,200.00 | 86.00 | 1,032.00 | 75.00 | 900.00 | 35.00 | 420.00 | | 0114 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 200 | LNFT | 5.00 | 1,000.00 | 7.40 | 1,480.00 | 4.75 | 950.00 | 4.50 | 900.00 | | 0115 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 1 | EACH | 1,000.00 | 1,000.00 | 1,290.00 | 1,290.00 | 625.00 | 625.00 | 68.00 | 68.00 | | 0116 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 1 | EACH | 5,000.00 | 5,000.00 | 7,400.00 | 7,400.00 | 3,750.00 | 3,750.00 | 3,700.00 | 3,700.00 | | 0117 | NS-ITS-10401 | Power Surge Protector, Furnish & Install | 1 | EACH | 1,000.00 | 1,000.00 | 370.00 | 370.00 | 575.00 | 575.00 | 420.00 | 420.00 | | 0118 | NS-ITS-10407 | Data Surge Protector, Furnish & Install | 1 | EACH | 500.00 | 500.00 | 410.00 | 410.00 | 300.00 | 300.00 | 215.00 | 215.00 | | 0119 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,660 | LNFT | 0.01 | 16.60 | 3.00 | 4,980.00 | 5.00 | 8,300.00 | 10.00 | 16,600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,544,679.53 | | 4,614,644.10 | | 4,801,344.00 | | 5,089,226.98 |
|