Proposal:H.000382.6
Parish:Natchitoches, Winn
Routes:US 71
Description:US 71: BRIDGES NEAR ST. MAURICE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, DRAINAGE, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$21,599,923.61
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $27,818,703.88 |
| 2 | 55950 | Brown Industrial Construction, LLC | $28,840,008.15 |
| 3 | 55505 | MERRICK, LLC | $29,249,919.97 |
| 4 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $29,725,429.60 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $31,940,908.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - Brown Industrial Construction, LLC | - 3 - MERRICK, LLC | - 4 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 20 | LUMP | 100,000.00 | 100,000.00 | 850,000.00 | 850,000.00 | 250,000.00 | 250,000.00 | 1,160,000.00 | 1,160,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 330 | SQYD | 8.00 | 2,640.00 | 8.00 | 2,640.00 | 6.00 | 1,980.00 | 13.00 | 4,290.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 20,741.9 | SQYD | 10.00 | 207,419.00 | 10.00 | 207,419.00 | 11.51 | 238,739.27 | 20.00 | 414,838.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 108+35.7 33.5FT X 201FT CONCRETE DECK STEEL GIRDER BRIDGE) | 6,734 | LUMP | 178,200.00 | 178,200.00 | 100,000.00 | 100,000.00 | 350,000.00 | 350,000.00 | 250,000.00 | 250,000.00 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 122+47.4 OFFSET LT 66.6 FT 30.8 FT X 281 FT CONCRETE DECK GIRDER BRIDGE | 8,655 | LUMP | 250,000.00 | 250,000.00 | 180,000.00 | 180,000.00 | 450,000.00 | 450,000.00 | 150,000.00 | 150,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (STA. 177+25.1 33.5 FT X 80 FT CONCRETE SLAB BRIDGE | 2,680 | LUMP | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | 175,000.00 | 175,000.00 | 250,000.00 | 250,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 2,528.3 | LNFT | 8.00 | 20,226.40 | 6.00 | 15,169.80 | 9.00 | 22,754.70 | 7.00 | 17,698.10 | | 0008 | 203-01-00100 | General Excavation | 16,013 | CUYD | 8.00 | 128,104.00 | 8.00 | 128,104.00 | 10.50 | 168,136.50 | 20.00 | 320,260.00 | | 0009 | 203-01-00100 | General Excavation (LEVEE SECTION) | 388 | CUYD | 8.00 | 3,104.00 | 8.00 | 3,104.00 | 18.50 | 7,178.00 | 50.00 | 19,400.00 | | 0010 | 203-02-00100 | Drainage Excavation | 2,979 | CUYD | 12.00 | 35,748.00 | 10.00 | 29,790.00 | 17.00 | 50,643.00 | 25.00 | 74,475.00 | | 0011 | 203-03-00100 | Embankment | 46,446 | CUYD | 15.00 | 696,690.00 | 18.00 | 836,028.00 | 22.00 | 1,021,812.00 | 30.00 | 1,393,380.00 | | 0012 | 203-03-00100 | Embankment (LEVEE SECTION) | 5,847 | CUYD | 18.00 | 105,246.00 | 20.00 | 116,940.00 | 24.00 | 140,328.00 | 40.00 | 233,880.00 | | 0013 | 203-11-00100 | Settlement Plate Installation and Monitoring | 7 | EACH | 2,000.00 | 14,000.00 | 2,500.00 | 17,500.00 | 2,500.00 | 17,500.00 | 4,000.00 | 28,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 117 | EACH | 150.00 | 17,550.00 | 150.00 | 17,550.00 | 25.00 | 2,925.00 | 200.00 | 23,400.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 6,055 | LNFT | 3.00 | 18,165.00 | 2.30 | 13,926.50 | 2.40 | 14,532.00 | 2.50 | 15,137.50 | | 0016 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 19,605.9 | SQYD | 40.00 | 784,236.00 | 44.00 | 862,659.60 | 39.00 | 764,630.10 | 45.00 | 882,265.50 | | 0017 | 304-01-00100 | Lime | 179.41 | TON | 375.00 | 67,278.75 | 275.00 | 49,337.75 | 280.00 | 50,234.80 | 400.00 | 71,764.00 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 12,656.6 | SQYD | 7.00 | 88,596.20 | 4.00 | 50,626.40 | 1.00 | 12,656.60 | 6.00 | 75,939.60 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 91 | CUYD | 100.00 | 9,100.00 | 100.00 | 9,100.00 | 90.00 | 8,190.00 | 200.00 | 18,200.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 650 | CUYD | 155.00 | 100,750.00 | 86.00 | 55,900.00 | 92.00 | 59,800.00 | 80.00 | 52,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 4,946.2 | TON | 200.00 | 989,240.00 | 190.00 | 939,778.00 | 230.00 | 1,137,626.00 | 190.00 | 939,778.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 587.9 | TON | 240.00 | 141,096.00 | 220.00 | 129,338.00 | 265.00 | 155,793.50 | 190.00 | 111,701.00 | | 0023 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,030 | SQYD | 220.00 | 226,600.00 | 170.00 | 175,100.00 | 175.00 | 180,250.00 | 190.00 | 195,700.00 | | 0024 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 96 | LNFT | 250.00 | 24,000.00 | 250.00 | 24,000.00 | 300.00 | 28,800.00 | 350.00 | 33,600.00 | | 0025 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 184 | LNFT | 300.00 | 55,200.00 | 300.00 | 55,200.00 | 310.00 | 57,040.00 | 400.00 | 73,600.00 | | 0026 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 320 | LNFT | 155.00 | 49,600.00 | 155.00 | 49,600.00 | 120.00 | 38,400.00 | 235.00 | 75,200.00 | | 0027 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 136 | LNFT | 250.00 | 34,000.00 | 250.00 | 34,000.00 | 140.00 | 19,040.00 | 260.00 | 35,360.00 | | 0028 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 144 | LNFT | 275.00 | 39,600.00 | 275.00 | 39,600.00 | 175.00 | 25,200.00 | 300.00 | 43,200.00 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 831.3 | LNFT | 27.00 | 22,445.10 | 27.00 | 22,445.10 | 32.00 | 26,601.60 | 30.00 | 24,939.00 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 108.00 | 32,400.00 | 110.00 | 33,000.00 | 125.00 | 37,500.00 | 110.00 | 33,000.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 2,975.00 | 35,700.00 | 3,000.00 | 36,000.00 | 3,400.00 | 40,800.00 | 3,050.00 | 36,600.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 4,580 | LNFT | 14.00 | 64,120.00 | 14.00 | 64,120.00 | 15.50 | 70,990.00 | 13.00 | 59,540.00 | | 0033 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 595 | LNFT | 14.00 | 8,330.00 | 14.00 | 8,330.00 | 15.50 | 9,222.50 | 19.00 | 11,305.00 | | 0034 | 705-05-00100 | Double Swinging Driveway Gates | 5 | DBGT | 800.00 | 4,000.00 | 900.00 | 4,500.00 | 900.00 | 4,500.00 | 2,100.00 | 10,500.00 | | 0035 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 500.00 | 10,500.00 | 400.00 | 8,400.00 | 725.00 | 15,225.00 | 600.00 | 12,600.00 | | 0036 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 150.00 | 3,150.00 | 400.00 | 8,400.00 | 250.00 | 5,250.00 | 200.00 | 4,200.00 | | 0037 | 712-04-00100 | Flexible Revetment | 7,218 | SQYD | 100.00 | 721,800.00 | 110.00 | 793,980.00 | 90.00 | 649,620.00 | 97.00 | 700,146.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 713,000.00 | 713,000.00 | 250,000.00 | 250,000.00 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.15 | MILE | 1,100.00 | 3,465.00 | 1,100.00 | 3,465.00 | 1,100.00 | 3,465.00 | 300.00 | 945.00 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.558 | MILE | 1,100.00 | 2,813.80 | 1,600.00 | 4,092.80 | 1,400.00 | 3,581.20 | 1,100.00 | 2,813.80 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.836 | MILE | 1,550.00 | 15,245.80 | 3,600.00 | 35,409.60 | 1,900.00 | 18,688.40 | 1,600.00 | 15,737.60 | | 0042 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 211 | EACH | 800.00 | 168,800.00 | 700.00 | 147,700.00 | 1,700.00 | 358,700.00 | 700.00 | 147,700.00 | | 0043 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 194 | EACH | 249.00 | 48,306.00 | 80.00 | 15,520.00 | 75.00 | 14,550.00 | 130.00 | 25,220.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 30 | TON | 700.00 | 21,000.00 | 700.00 | 21,000.00 | 800.00 | 24,000.00 | 900.00 | 27,000.00 | | 0045 | 717-01-00100 | Seeding | 1,600 | LB | 12.00 | 19,200.00 | 12.00 | 19,200.00 | 14.80 | 23,680.00 | 27.00 | 43,200.00 | | 0046 | 718-01-00100 | Fertilizer | 20,000 | LB | 0.55 | 11,000.00 | 0.55 | 11,000.00 | 0.65 | 13,000.00 | 0.70 | 14,000.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,884 | SQYD | 3.00 | 11,652.00 | 2.00 | 7,768.00 | 2.00 | 7,768.00 | 2.10 | 8,156.40 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 292 | SQYD | 3.00 | 876.00 | 2.00 | 584.00 | 2.00 | 584.00 | 2.60 | 759.20 | | 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,735 | SQYD | 3.00 | 5,205.00 | 2.00 | 3,470.00 | 2.00 | 3,470.00 | 3.50 | 6,072.50 | | 0050 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 542 | SQYD | 3.00 | 1,626.00 | 2.00 | 1,084.00 | 2.00 | 1,084.00 | 6.00 | 3,252.00 | | 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 | | 0052 | 724-01-00100 | Rumble Strips (Centerline) | 0.35 | MILE | 0.50 | 0.18 | 4,000.00 | 1,400.00 | 1,300.00 | 455.00 | 1,200.00 | 420.00 | | 0053 | 724-01-00100 | Rumble Strips (Centerline) | 0.965 | MILE | 1.00 | 0.97 | 4,000.00 | 3,860.00 | 1,300.00 | 1,254.50 | 1,200.00 | 1,158.00 | | 0054 | 725-01-00100 | Temporary Detour Roads | 14,289.3 | SQYD | 177.67 | 2,538,779.93 | 160.00 | 2,286,288.00 | 144.00 | 2,057,659.20 | 150.00 | 2,143,395.00 | | 0055 | 726-01-00100 | Bedding Material | 66.4 | CUYD | 100.00 | 6,640.00 | 100.00 | 6,640.00 | 190.00 | 12,616.00 | 160.00 | 10,624.00 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 2,781,800.00 | 2,781,800.00 | 2,950,000.00 | 2,950,000.00 | 2,900,000.00 | 2,900,000.00 | 2,900,000.00 | 2,900,000.00 | | 0057 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 75.00 | 450.00 | 50.00 | 300.00 | 65.00 | 390.00 | 55.00 | 330.00 | | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 85.00 | 1,020.00 | 90.00 | 1,080.00 | 115.00 | 1,380.00 | 95.00 | 1,140.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 213 | EACH | 9.00 | 1,917.00 | 9.00 | 1,917.00 | 11.00 | 2,343.00 | 10.00 | 2,130.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.354 | MILE | 6,500.00 | 21,801.00 | 6,500.00 | 21,801.00 | 7,500.00 | 25,155.00 | 6,500.00 | 21,801.00 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.387 | MILE | 3,250.00 | 1,257.75 | 3,300.00 | 1,277.10 | 3,800.00 | 1,470.60 | 3,200.00 | 1,238.40 | | 0062 | 735-01-00100 | Mailboxes | 2 | EACH | 1.00 | 2.00 | 10.00 | 20.00 | 20.00 | 40.00 | 32.00 | 64.00 | | 0063 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 750.00 | 1,500.00 | 250.00 | 500.00 | 950.00 | 1,900.00 | 250.00 | 500.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 750,000.00 | 750,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | 1,000,000.00 | 1,000,000.00 | | 0065 | 803-01-00200 | Drilled Shaft (24" Diameter) | 136 | LNFT | 600.00 | 81,600.00 | 700.00 | 95,200.00 | 725.00 | 98,600.00 | 700.00 | 95,200.00 | | 0066 | 803-01-00500 | Drilled Shaft (42" Diameter) | 600 | LNFT | 700.00 | 420,000.00 | 950.00 | 570,000.00 | 950.00 | 570,000.00 | 750.00 | 450,000.00 | | 0067 | 803-01-00800 | Drilled Shaft (60" Diameter) | 1,023 | LNFT | 1,600.00 | 1,636,800.00 | 2,000.00 | 2,046,000.00 | 2,200.00 | 2,250,600.00 | 1,700.00 | 1,739,100.00 | | 0068 | 803-02-00800 | Test Shaft (60" Diameter) | 94 | LNFT | 2,500.00 | 235,000.00 | 4,000.00 | 376,000.00 | 3,500.00 | 329,000.00 | 6,000.00 | 564,000.00 | | 0069 | 803-07-00800 | Bi-Directional Load Cell Test (60" Diameter) | 1 | EACH | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | 190,000.00 | 190,000.00 | 275,000.00 | 275,000.00 | | 0070 | 803-08-00500 | Crosshole Sonic Log Test (42" Diameter) | 6 | EACH | 15,000.00 | 90,000.00 | 7,000.00 | 42,000.00 | 4,500.00 | 27,000.00 | 9,500.00 | 57,000.00 | | 0071 | 803-08-00800 | Crosshole Sonic Log Test (60" Diameter) | 13 | EACH | 15,000.00 | 195,000.00 | 7,000.00 | 91,000.00 | 4,500.00 | 58,500.00 | 11,000.00 | 143,000.00 | | 0072 | 803-10-00800 | Permanent Casing (60" Diameter) | 545 | LNFT | 550.00 | 299,750.00 | 500.00 | 272,500.00 | 600.00 | 327,000.00 | 500.00 | 272,500.00 | | 0073 | 803-11-00510 | Thermal Integrity Profiling (42” Diameter) | 6 | EACH | 2,500.00 | 15,000.00 | 2,800.00 | 16,800.00 | 3,000.00 | 18,000.00 | 2,500.00 | 15,000.00 | | 0074 | 803-11-00810 | Thermal Integrity Profiling (60” Diameter) | 13 | EACH | 4,000.00 | 52,000.00 | 3,800.00 | 49,400.00 | 4,000.00 | 52,000.00 | 3,500.00 | 45,500.00 | | 0075 | 804-01-00600 | Precast Concrete Piles (24") | 5,060 | LNFT | 300.00 | 1,518,000.00 | 275.00 | 1,391,500.00 | 305.00 | 1,543,300.00 | 220.00 | 1,113,200.00 | | 0076 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 1 | EACH | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | | 0077 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 1,500.00 | 10,500.00 | 4,500.00 | 31,500.00 | 6,000.00 | 42,000.00 | 7,000.00 | 49,000.00 | | 0078 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 20,000.00 | 20,000.00 | 14,000.00 | 14,000.00 | 15,000.00 | 15,000.00 | 200,000.00 | 200,000.00 | | 0079 | 804-18-00100 | Vibration Monitoring | 8 | DAY | 1,200.00 | 9,600.00 | 2,000.00 | 16,000.00 | 1,200.00 | 9,600.00 | 1,000.00 | 8,000.00 | | 0080 | 805-01-00100 | Class A1 Concrete (Slab Span) | 277.48 | CUYD | 350.00 | 97,118.00 | 1,600.00 | 443,968.00 | 1,600.00 | 443,968.00 | 1,700.00 | 471,716.00 | | 0081 | 805-01-00200 | Class A1 Concrete (Deck) (With Transparent Stay-In-Place Forms) | 936.93 | CUYD | 350.00 | 327,925.50 | 2,200.00 | 2,061,246.00 | 2,450.00 | 2,295,478.50 | 2,200.00 | 2,061,246.00 | | 0082 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 357.9 | CUYD | 350.00 | 125,265.00 | 2,400.00 | 858,960.00 | 2,400.00 | 858,960.00 | 2,700.00 | 966,330.00 | | 0083 | 805-01-00400 | Class A1 Concrete (Column) | 61.21 | CUYD | 350.00 | 21,423.50 | 3,500.00 | 214,235.00 | 2,800.00 | 171,388.00 | 2,600.00 | 159,146.00 | | 0084 | 805-01-01000 | Class A1 Concrete (Headwalls) (6.08 cu yds per headwall) | 12.16 | CUYD | 350.00 | 4,256.00 | 2,900.00 | 35,264.00 | 4,000.00 | 48,640.00 | 4,500.00 | 54,720.00 | | 0085 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 106.92 | CUYD | 350.00 | 37,422.00 | 1,700.00 | 181,764.00 | 2,800.00 | 299,376.00 | 2,500.00 | 267,300.00 | | 0086 | 805-08-01100 | Precast-Prestressed Concrete Girders (Type LG-25) | 1,422 | LNFT | 1,133.00 | 1,611,126.00 | 540.00 | 767,880.00 | 605.00 | 860,310.00 | 500.00 | 711,000.00 | | 0087 | 805-08-01400 | Precast-Prestressed Concrete Girders (Type LG-54) | 2,488 | LNFT | 1,503.00 | 3,739,464.00 | 480.00 | 1,194,240.00 | 500.00 | 1,244,000.00 | 450.00 | 1,119,600.00 | | 0088 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 12,910 | SQFT | 3.00 | 38,730.00 | 2.00 | 25,820.00 | 3.00 | 38,730.00 | 2.50 | 32,275.00 | | 0089 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 12,910 | SQFT | 4.00 | 51,640.00 | 3.00 | 38,730.00 | 3.50 | 45,185.00 | 3.00 | 38,730.00 | | 0090 | 806-01-00100 | Deformed Reinforcing Steel | 381,350 | LB | 3.00 | 1,144,050.00 | 1.65 | 629,227.50 | 2.00 | 762,700.00 | 1.50 | 572,025.00 | | 0091 | 807-01-00100 | Structural Metalwork (Grade 36) | 1,003 | LUMP | 28,000.00 | 28,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0092 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 1,904 | LNFT | 190.00 | 361,760.00 | 230.00 | 437,920.00 | 175.00 | 333,200.00 | 200.00 | 380,800.00 | | 0093 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 9,600 | SQFT | 139.00 | 1,334,400.00 | 140.00 | 1,344,000.00 | 108.00 | 1,036,800.00 | 140.00 | 1,344,000.00 | | 0094 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 217 | SFIN | 140.00 | 30,380.00 | 170.00 | 36,890.00 | 305.00 | 66,185.00 | 100.00 | 21,700.00 | | 0095 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 694 | SFIN | 160.00 | 111,040.00 | 120.00 | 83,280.00 | 165.00 | 114,510.00 | 110.00 | 76,340.00 | | 0096 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 240 | LNFT | 420.00 | 100,800.00 | 400.00 | 96,000.00 | 625.00 | 150,000.00 | 500.00 | 120,000.00 | | 0097 | 815-03-00300 | Joint Seal (Poured) | 320 | LNFT | 15.00 | 4,800.00 | 18.00 | 5,760.00 | 30.00 | 9,600.00 | 40.00 | 12,800.00 | | 0098 | 816-02-00100 | Bridge End Drain System (Open Drain) | 5 | EACH | 15,000.00 | 75,000.00 | 7,000.00 | 35,000.00 | 8,000.00 | 40,000.00 | 1,800.00 | 9,000.00 | | 0099 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 6,400 | SQFT | 170.00 | 1,088,000.00 | 390.00 | 2,496,000.00 | 225.00 | 1,440,000.00 | 160.00 | 1,024,000.00 | | 0100 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 720 | LNFT | 13.00 | 9,360.00 | 3.00 | 2,160.00 | 13.00 | 9,360.00 | 16.00 | 11,520.00 | | 0101 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,200 | LNFT | 1.00 | 1,200.00 | 3.00 | 3,600.00 | 3.00 | 3,600.00 | 13.00 | 15,600.00 | | 0102 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,418 | INLF | 1.00 | 2,418.00 | 2.00 | 4,836.00 | 2.50 | 6,045.00 | 6.00 | 14,508.00 | | 0103 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 600 | INLF | 1.00 | 600.00 | 3.00 | 1,800.00 | 3.00 | 1,800.00 | 7.00 | 4,200.00 | | 0104 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 24 | EACH | 8,000.00 | 192,000.00 | 4,000.00 | 96,000.00 | 11,500.00 | 276,000.00 | 12,000.00 | 288,000.00 | | 0105 | 202-02-12000 | Removal of Fence | 5,058 | LNFT | 2.00 | 10,116.00 | 5.00 | 25,290.00 | 1.50 | 7,587.00 | 5.00 | 25,290.00 | | 0106 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 92 | LNFT | 30.00 | 2,760.00 | 25.00 | 2,300.00 | 15.00 | 1,380.00 | 30.00 | 2,760.00 | | 0107 | 202-02-32120 | Removal of Pipe (Side Drain) (15" RCP AT STA. 129+00, Rt.) | 175 | LNFT | 33.00 | 5,775.00 | 25.00 | 4,375.00 | 15.00 | 2,625.00 | 30.00 | 5,250.00 | | 0108 | 202-02-32120 | Removal of Pipe (Side Drain) (12" CMP) | 28 | LNFT | 37.00 | 1,036.00 | 25.00 | 700.00 | 15.00 | 420.00 | 30.00 | 840.00 | | 0109 | 202-02-32120 | Removal of Pipe (Side Drain) (12" SP) | 28 | LNFT | 30.00 | 840.00 | 25.00 | 700.00 | 15.00 | 420.00 | 30.00 | 840.00 | | 0110 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | 20 | LNFT | 50.00 | 1,000.00 | 25.00 | 500.00 | 15.00 | 300.00 | 30.00 | 600.00 | | 0111 | 202-02-32120 | Removal of Pipe (Side Drain) (24" EQUIV. CMPA) | 24 | LNFT | 30.00 | 720.00 | 25.00 | 600.00 | 15.00 | 360.00 | 30.00 | 720.00 | | 0112 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 20 | LNFT | 47.00 | 940.00 | 25.00 | 500.00 | 15.00 | 300.00 | 30.00 | 600.00 | | 0113 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP) | 64 | LNFT | 14.00 | 896.00 | 25.00 | 1,600.00 | 15.00 | 960.00 | 30.00 | 1,920.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 27,818,703.88 | | 28,840,008.15 | | 29,249,919.97 | | 29,725,429.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 20 | LUMP | 1,000,000.00 | 1,000,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 330 | SQYD | 8.00 | 2,640.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 20,741.9 | SQYD | 10.00 | 207,419.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 108+35.7 33.5FT X 201FT CONCRETE DECK STEEL GIRDER BRIDGE) | 6,734 | LUMP | 300,000.00 | 300,000.00 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 122+47.4 OFFSET LT 66.6 FT 30.8 FT X 281 FT CONCRETE DECK GIRDER BRIDGE | 8,655 | LUMP | 400,000.00 | 400,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (STA. 177+25.1 33.5 FT X 80 FT CONCRETE SLAB BRIDGE | 2,680 | LUMP | 300,000.00 | 300,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 2,528.3 | LNFT | 8.00 | 20,226.40 | | 0008 | 203-01-00100 | General Excavation | 16,013 | CUYD | 8.00 | 128,104.00 | | 0009 | 203-01-00100 | General Excavation (LEVEE SECTION) | 388 | CUYD | 8.00 | 3,104.00 | | 0010 | 203-02-00100 | Drainage Excavation | 2,979 | CUYD | 10.00 | 29,790.00 | | 0011 | 203-03-00100 | Embankment | 46,446 | CUYD | 17.50 | 812,805.00 | | 0012 | 203-03-00100 | Embankment (LEVEE SECTION) | 5,847 | CUYD | 18.50 | 108,169.50 | | 0013 | 203-11-00100 | Settlement Plate Installation and Monitoring | 7 | EACH | 1,200.00 | 8,400.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 117 | EACH | 175.00 | 20,475.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 6,055 | LNFT | 7.00 | 42,385.00 | | 0016 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 19,605.9 | SQYD | 43.00 | 843,053.70 | | 0017 | 304-01-00100 | Lime | 179.41 | TON | 512.00 | 91,857.92 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 12,656.6 | SQYD | 9.00 | 113,909.40 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 91 | CUYD | 100.00 | 9,100.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 650 | CUYD | 185.00 | 120,250.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 4,946.2 | TON | 200.00 | 989,240.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 587.9 | TON | 238.00 | 139,920.20 | | 0023 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,030 | SQYD | 164.00 | 168,920.00 | | 0024 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 96 | LNFT | 250.00 | 24,000.00 | | 0025 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 184 | LNFT | 300.00 | 55,200.00 | | 0026 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 320 | LNFT | 155.00 | 49,600.00 | | 0027 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 136 | LNFT | 250.00 | 34,000.00 | | 0028 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 144 | LNFT | 275.00 | 39,600.00 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 831.3 | LNFT | 36.00 | 29,926.80 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 140.00 | 42,000.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 4,100.00 | 49,200.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 4,580 | LNFT | 13.00 | 59,540.00 | | 0033 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 595 | LNFT | 25.00 | 14,875.00 | | 0034 | 705-05-00100 | Double Swinging Driveway Gates | 5 | DBGT | 1,350.00 | 6,750.00 | | 0035 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 600.00 | 12,600.00 | | 0036 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 200.00 | 4,200.00 | | 0037 | 712-04-00100 | Flexible Revetment | 7,218 | SQYD | 85.00 | 613,530.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 750,000.00 | 750,000.00 | | 0039 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.15 | MILE | 1,100.00 | 3,465.00 | | 0040 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.558 | MILE | 1,100.00 | 2,813.80 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.836 | MILE | 1,550.00 | 15,245.80 | | 0042 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 211 | EACH | 1,000.00 | 211,000.00 | | 0043 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 194 | EACH | 100.00 | 19,400.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 30 | TON | 850.00 | 25,500.00 | | 0045 | 717-01-00100 | Seeding | 1,600 | LB | 15.00 | 24,000.00 | | 0046 | 718-01-00100 | Fertilizer | 20,000 | LB | 0.65 | 13,000.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,884 | SQYD | 2.00 | 7,768.00 | | 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 292 | SQYD | 2.50 | 730.00 | | 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,735 | SQYD | 3.50 | 6,072.50 | | 0050 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 542 | SQYD | 5.00 | 2,710.00 | | 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | | 0052 | 724-01-00100 | Rumble Strips (Centerline) | 0.35 | MILE | 300.00 | 105.00 | | 0053 | 724-01-00100 | Rumble Strips (Centerline) | 0.965 | MILE | 300.00 | 289.50 | | 0054 | 725-01-00100 | Temporary Detour Roads | 14,289.3 | SQYD | 145.00 | 2,071,948.50 | | 0055 | 726-01-00100 | Bedding Material | 66.4 | CUYD | 100.00 | 6,640.00 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 3,100,000.00 | 3,100,000.00 | | 0057 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 110.00 | 660.00 | | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 125.00 | 1,500.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 213 | EACH | 9.00 | 1,917.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.354 | MILE | 6,500.00 | 21,801.00 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.387 | MILE | 3,200.00 | 1,238.40 | | 0062 | 735-01-00100 | Mailboxes | 2 | EACH | 1.00 | 2.00 | | 0063 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 650,000.00 | 650,000.00 | | 0065 | 803-01-00200 | Drilled Shaft (24" Diameter) | 136 | LNFT | 690.00 | 93,840.00 | | 0066 | 803-01-00500 | Drilled Shaft (42" Diameter) | 600 | LNFT | 895.00 | 537,000.00 | | 0067 | 803-01-00800 | Drilled Shaft (60" Diameter) | 1,023 | LNFT | 2,100.00 | 2,148,300.00 | | 0068 | 803-02-00800 | Test Shaft (60" Diameter) | 94 | LNFT | 2,750.00 | 258,500.00 | | 0069 | 803-07-00800 | Bi-Directional Load Cell Test (60" Diameter) | 1 | EACH | 154,000.00 | 154,000.00 | | 0070 | 803-08-00500 | Crosshole Sonic Log Test (42" Diameter) | 6 | EACH | 7,855.00 | 47,130.00 | | 0071 | 803-08-00800 | Crosshole Sonic Log Test (60" Diameter) | 13 | EACH | 9,630.00 | 125,190.00 | | 0072 | 803-10-00800 | Permanent Casing (60" Diameter) | 545 | LNFT | 550.00 | 299,750.00 | | 0073 | 803-11-00510 | Thermal Integrity Profiling (42” Diameter) | 6 | EACH | 2,375.00 | 14,250.00 | | 0074 | 803-11-00810 | Thermal Integrity Profiling (60” Diameter) | 13 | EACH | 3,265.00 | 42,445.00 | | 0075 | 804-01-00600 | Precast Concrete Piles (24") | 5,060 | LNFT | 295.00 | 1,492,700.00 | | 0076 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 1 | EACH | 150,000.00 | 150,000.00 | | 0077 | 804-14-00100 | Dynamic Monitoring Assistance | 7 | EACH | 1,030.00 | 7,210.00 | | 0078 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 11,500.00 | 11,500.00 | | 0079 | 804-18-00100 | Vibration Monitoring | 8 | DAY | 1,500.00 | 12,000.00 | | 0080 | 805-01-00100 | Class A1 Concrete (Slab Span) | 277.48 | CUYD | 3,000.00 | 832,440.00 | | 0081 | 805-01-00200 | Class A1 Concrete (Deck) (With Transparent Stay-In-Place Forms) | 936.93 | CUYD | 3,100.00 | 2,904,483.00 | | 0082 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 357.9 | CUYD | 3,500.00 | 1,252,650.00 | | 0083 | 805-01-00400 | Class A1 Concrete (Column) | 61.21 | CUYD | 3,500.00 | 214,235.00 | | 0084 | 805-01-01000 | Class A1 Concrete (Headwalls) (6.08 cu yds per headwall) | 12.16 | CUYD | 6,000.00 | 72,960.00 | | 0085 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 106.92 | CUYD | 3,500.00 | 374,220.00 | | 0086 | 805-08-01100 | Precast-Prestressed Concrete Girders (Type LG-25) | 1,422 | LNFT | 650.00 | 924,300.00 | | 0087 | 805-08-01400 | Precast-Prestressed Concrete Girders (Type LG-54) | 2,488 | LNFT | 550.00 | 1,368,400.00 | | 0088 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 12,910 | SQFT | 1.00 | 12,910.00 | | 0089 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 12,910 | SQFT | 2.00 | 25,820.00 | | 0090 | 806-01-00100 | Deformed Reinforcing Steel | 381,350 | LB | 2.00 | 762,700.00 | | 0091 | 807-01-00100 | Structural Metalwork (Grade 36) | 1,003 | LUMP | 20,000.00 | 20,000.00 | | 0092 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 1,904 | LNFT | 215.00 | 409,360.00 | | 0093 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 9,600 | SQFT | 135.00 | 1,296,000.00 | | 0094 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 217 | SFIN | 200.00 | 43,400.00 | | 0095 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 694 | SFIN | 200.00 | 138,800.00 | | 0096 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 240 | LNFT | 500.00 | 120,000.00 | | 0097 | 815-03-00300 | Joint Seal (Poured) | 320 | LNFT | 30.00 | 9,600.00 | | 0098 | 816-02-00100 | Bridge End Drain System (Open Drain) | 5 | EACH | 12,750.00 | 63,750.00 | | 0099 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 6,400 | SQFT | 240.00 | 1,536,000.00 | | 0100 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 720 | LNFT | 4.00 | 2,880.00 | | 0101 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,200 | LNFT | 2.00 | 2,400.00 | | 0102 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,418 | INLF | 1.00 | 2,418.00 | | 0103 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 600 | INLF | 2.00 | 1,200.00 | | 0104 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 24 | EACH | 9,764.17 | 234,340.08 | | 0105 | 202-02-12000 | Removal of Fence | 5,058 | LNFT | 5.00 | 25,290.00 | | 0106 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 92 | LNFT | 100.00 | 9,200.00 | | 0107 | 202-02-32120 | Removal of Pipe (Side Drain) (15" RCP AT STA. 129+00, Rt.) | 175 | LNFT | 60.00 | 10,500.00 | | 0108 | 202-02-32120 | Removal of Pipe (Side Drain) (12" CMP) | 28 | LNFT | 120.00 | 3,360.00 | | 0109 | 202-02-32120 | Removal of Pipe (Side Drain) (12" SP) | 28 | LNFT | 120.00 | 3,360.00 | | 0110 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | 20 | LNFT | 80.00 | 1,600.00 | | 0111 | 202-02-32120 | Removal of Pipe (Side Drain) (24" EQUIV. CMPA) | 24 | LNFT | 70.00 | 1,680.00 | | 0112 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 20 | LNFT | 85.00 | 1,700.00 | | 0113 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP) | 64 | LNFT | 110.00 | 7,040.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 31,940,908.50 |
|