Bid Tabulations for the Letting of 6/12/2024 LA DOTD Headquarters

Proposal:H.015944.6
Parish:St. James
Routes:LA 3125 & LA 641
Description:LA 3125: LA 70 - LA 3213
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, CULVERT GEOPOLYMER LINING, AND RELATED WORK.
Estimated Construction Cost:$13,289,922.11
Rank License BidderConstruction Bid
112031R.J. Daigle & Sons Contractors, Inc$11,595,876.67
273475Madden Gulf Coast, LLC$13,424,205.52
300046Barber Bros. Contracting Co., L.L.C$13,526,134.00
406276Barriere Construction Co., LLC$13,876,018.42


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
R.J. Daigle & Sons Contractors, Inc
- 2 -
Madden Gulf Coast, LLC
- 3 -
Barber Bros. Contracting Co., L.L.C
- 4 -
Barriere Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP30,000.0030,000.0012,000.0012,000.0025,000.0025,000.006,500.006,500.00
0002202-02-02020Removal of Asphalt Pavement 1,443.3   SQYD17.5325,301.0512.0017,319.6020.0028,866.0011.5016,597.95
0003202-02-14500Removal of Guard Rail 819     LNFT7.005,733.007.005,733.008.006,552.0013.0010,647.00
0004203-01-00100General Excavation 49     CUYD23.471,150.03250.0012,250.0070.003,430.00170.008,330.00
0005203-07-00100Borrow (Vehicular Measurement) 500     CUYD100.9850,490.00140.0070,000.0075.0037,500.0054.0027,000.00
0006204-06-00100Temporary Silt Fencing 1,796     LNFT2.594,651.642.254,041.002.504,490.002.504,490.00
0007302-02-06030Class II Base Course (6" Thick) (Asphalt Concrete Base) 291.5   SQYD81.9623,891.34150.0043,725.0085.0024,777.5085.0024,777.50
0008402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 48.6   CUYD86.374,197.5875.003,645.0060.002,916.0020.00972.00
0009502-01-00100Asphalt Concrete 46,028.4   TON109.005,017,095.60119.005,477,379.60116.005,339,294.40117.505,408,337.00
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,041.9   TON212.00220,882.80225.00234,427.50205.00213,589.50275.00286,522.50
0011509-01-00100Milling Asphalt Pavement 327,466     SQYD2.08681,129.281.70556,692.203.501,146,131.004.921,611,132.72
0012509-02-00100Contractor Retained Reclaimed Asphalt Pavement -13,762     CUYD0.01-137.620.01-137.620.000.001.00-13,762.00
0013510-01-00100Pavement Patching (6" Minimum Thickness) 14,425     SQYD48.01692,544.2540.00577,000.0045.00649,125.0058.00836,650.00
0014510-01-00200Pavement Patching (12" Minimum Thickness) 18,165     SQYD89.821,631,580.3074.001,344,210.00112.002,034,480.0092.001,671,180.00
0015704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 275     LNFT29.758,181.2529.758,181.2530.008,250.0030.008,250.00
0016704-07-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT115.5023,100.00115.5023,100.00120.0024,000.00115.5023,100.00
0017704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 7     EACH3,500.0024,500.003,500.0024,500.003,700.0025,900.003,500.0024,500.00
0018704-10-00204Guard Rail End Treatment, MASH, (TL-2 Tangent) 1     EACH2,900.002,900.002,900.002,900.003,000.003,000.002,900.002,900.00
0019713-01-00100Temporary Signs and Barricades 1     LUMP410,000.00410,000.001,000,000.001,000,000.00585,000.00585,000.00900,000.00900,000.00
0020713-02-00300Temporary Pavement Markings (8" Width) 3,132     LNFT1.003,132.001.003,132.000.25783.001.003,132.00
0021713-02-00500Temporary Pavement Markings (24" Width) 2,449     LNFT1.002,449.001.002,449.000.501,224.501.002,449.00
0022713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 24.734 MILE850.2121,029.09350.008,656.90300.007,420.201,285.0031,783.19
0023713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 24.734 MILE850.2121,029.09850.0021,023.90700.0017,313.80850.0021,023.90
0024713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 68.215 MILE1,750.13119,385.121,750.00119,376.251,000.0068,215.001,750.00119,376.25
0025713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) 17     EACH50.00850.0050.00850.0025.00425.0050.00850.00
0026713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) 17     EACH50.00850.0050.00850.0025.00425.0050.00850.00
0027713-05-00240Temporary Pavement Legends & Symbols (Arrow - Merge) 4     EACH50.00200.0050.00200.0025.00100.0050.00200.00
0028713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) 6     EACH100.00600.00100.00600.0050.00300.00100.00600.00
0029724-01-00100Rumble Strips (Centerline) 10.38  MILE270.002,802.60270.002,802.60300.003,114.00270.002,802.60
0030724-02-00100Rumble Strips (Shoulder/Edge) 22.492 MILE269.986,072.39270.006,072.84300.006,747.60270.006,072.84
0031727-01-00100Mobilization 1     LUMP600,000.00600,000.001,310,000.001,310,000.001,350,000.001,350,000.001,035,000.001,035,000.00
0032729-16-00300Object Marker Assembly (Type 3) 8     EACH90.00720.0090.00720.0095.00760.0090.00720.00
0033731-02-00100Reflectorized Raised Pavement Markers 3,285     EACH10.0032,850.0010.0032,850.005.5018,067.5010.0032,850.00
0034732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 2,017     LNFT15.0030,255.0015.0030,255.0017.0034,289.0015.0030,255.00
0035732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 144     LNFT20.002,880.0020.002,880.0019.002,736.0021.003,024.00
0036732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 30.359 MILE6,500.21197,339.886,500.00197,333.505,000.00151,795.006,500.00197,333.50
0037732-02-02040Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.243 MILE25,720.166,250.0025,000.006,075.0016,000.003,888.0026,000.006,318.00
0038732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 11.02  MILE2,000.0022,040.002,000.0022,040.001,200.0013,224.002,050.0022,591.00
0039732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.156 MILE10,256.411,600.0010,000.001,560.008,500.001,326.0011,000.001,716.00
0040732-03-02040Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.126 MILE10,317.461,300.0010,000.001,260.008,500.001,071.0011,000.001,386.00
0041732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 6     EACH400.002,400.00400.002,400.00375.002,250.00425.002,550.00
0042732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 6     EACH400.002,400.00400.002,400.00375.002,250.00425.002,550.00
0043732-04-01120Plastic Pavement Legends and Symbols (Arrow - Merge) 2     EACH750.001,500.00750.001,500.00800.001,600.00751.001,502.00
0044732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 2     EACH1,000.002,000.001,000.002,000.001,000.002,000.001,050.002,100.00
0045739-01-00100Hydro-Seeding 1.89  ACRE2,800.005,292.002,800.005,292.003,200.006,048.003,181.206,012.47
0046740-01-00100Construction Layout 1     LUMP20,000.0020,000.0050,000.0050,000.0035,000.0035,000.0031,000.0031,000.00
0047NS-500-00340Saw Cutting Asphalt Concrete Pavement 7,860     INLF1.007,860.001.007,860.001.007,860.001.108,646.00
0048NS-701-00020Culvert Rehabilitation by Geopolymer Lining 3,608     LNFT450.001,623,600.00600.002,164,800.00450.001,623,600.00400.001,443,200.00
             
  CONTRACTOR TOTAL   11,595,876.67 13,424,205.52 13,526,134.00 13,876,018.42