Search


Bid Tabulations for the Letting of 6/12/2024 LA DOTD Headquarters

Proposal:H.015441.6
Parish:Pointe Coupee
Routes:LA 1
Description:LA 1: S JCT LA 1 - N JCT LA 1
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,235,321.58
Rank License BidderConstruction Bid
157931KCR CONTRACTORS, LLC$246,164.81
206276Barriere Construction Co., LLC$1,432,551.23
300046Barber Bros. Contracting Co., L.L.C$1,555,855.22
473475Madden Gulf Coast, LLC$1,575,133.63


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
KCR CONTRACTORS, LLC
- 2 -
Barriere Construction Co., LLC
- 3 -
Barber Bros. Contracting Co., L.L.C
- 4 -
Madden Gulf Coast, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-06060Removal of Concrete Catch Basin 3     EACH1.003.001,034.003,102.001,100.003,300.001,035.003,105.00
0002202-02-06100Removal of Concrete Walks and Drives 319     SQYD1.00319.0018.255,821.7519.006,061.0019.006,061.00
0003202-02-14500Removal of Guard Rail 416.5   LNFT1.00416.508.753,644.3810.004,165.008.753,644.38
0004202-02-32120Removal of Pipe (Side Drain) 18" CMP360     LNFT1.00360.0019.507,020.0021.007,560.0019.507,020.00
0005202-02-32120Removal of Pipe (Side Drain) 24" CMP21     LNFT1.0021.0020.25425.2521.00441.0020.25425.25
0006202-02-32120Removal of Pipe (Side Drain) 24" RCP29     LNFT1.0029.0020.75601.7521.00609.0020.76602.04
0007202-02-32120Removal of Pipe (Side Drain) 30" RCP48     LNFT1.0048.0021.001,008.0022.001,056.0021.001,008.00
0008202-02-32140Removal of Pipe (Storm Drain) 24" CMP63     LNFT1.0063.0020.251,275.7521.001,323.0020.251,275.75
0009202-02-32140Removal of Pipe (Storm Drain) 24" RPVCP111     LNFT1.00111.0019.752,192.2521.002,331.0019.752,192.25
0010202-02-32140Removal of Pipe (Storm Drain) 30" RPVCP140     LNFT1.00140.0021.002,940.0011.001,540.0021.002,940.00
0011202-02-32140Removal of Pipe (Storm Drain) 36" CMP110     LNFT1.00110.0021.252,337.5022.002,420.0021.252,337.50
0012203-07-00100Borrow (Vehicular Measurement) 405     CUYD1.00405.0057.0023,085.0059.0023,895.0056.7522,983.75
0013203-10-00100Cleaning Existing Ditches 875     LNFT1.00875.0010.509,187.5011.009,625.0010.509,187.50
0014204-02-00100Temporary Hay Bales 20     EACH1.0020.0041.00820.0035.00700.0041.00820.00
0015402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 134.7   CUYD1.00134.7090.2512,156.6892.0012,392.4090.2512,156.68
0016502-01-00100Asphalt Concrete 3,872     TON1.003,872.00140.00542,080.00132.00511,104.00140.00542,080.00
0017502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 64.1   TON1.0064.10800.0051,280.00265.0016,986.50460.0029,486.00
0018509-01-00100Milling Asphalt Pavement 34,951     SQYD1.0034,951.003.00104,853.003.50122,328.502.0069,902.00
0019509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,457     CUYD1.00-1,457.000.01-14.570.000.000.01-14.57
0020510-01-00200Pavement Patching (12" Minimum Thickness) 430     SQYD1.00430.00125.0053,750.00135.0058,050.00140.0060,200.00
0021701-03-02102Storm Drain Pipe (Outfall) (42" RPVCP or 48" CMP) 110     LNFT1.00110.00314.0034,540.00330.0036,300.00314.0034,540.00
0022701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 8     LNFT1.008.00171.001,368.00180.001,440.00172.001,376.00
0023701-04-01080Storm Drain Pipe Arch (36" Equiv. RCPA) 544     LNFT1.00544.00233.00126,752.00245.00133,280.00233.00126,752.00
0024701-06-01060Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) 208     LNFT1.00208.00202.2542,068.00212.0044,096.00202.5042,120.00
0025701-06-01080Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) 256     LNFT1.00256.00212.0054,272.00223.0057,088.00212.0054,272.00
0026701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 1,118     LNFT1.001,118.007.007,826.007.007,826.007.007,826.00
0027702-03-00200Catch Basins (CB-02) 5     EACH1.005.007,150.0035,750.007,600.0038,000.007,150.0035,750.00
0028704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 87.5   LNFT1.0087.5030.002,625.0032.002,800.0030.002,625.00
0029704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT1.00100.00116.0011,600.00122.0012,200.00116.0011,600.00
0030704-10-00204Guard Rail End Treatment, MASH, (TL-2 Tangent) 1     EACH1.001.002,900.002,900.003,050.003,050.002,900.002,900.00
0031704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 2     EACH1.002.003,500.007,000.003,700.007,400.003,500.007,000.00
0032704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 1     EACH1.001.003,100.003,100.003,300.003,300.003,100.003,100.00
0033706-02-00200Concrete Drive (6" Thick) 251     SQYD1.00251.0098.5024,723.50104.0026,104.0098.5024,723.50
0034706-02-00400Concrete Drive (10" Thick) 68     SQYD1.0068.00140.259,537.00148.0010,064.00140.259,537.00
0035711-01-04000Riprap (55 lb, 18" Thick) 150     SQYD1.00150.0095.0014,250.00100.0015,000.0095.0014,250.00
0036711-04-00100Geotextile Fabric 150     SQYD1.00150.008.751,312.509.001,350.009.001,350.00
0037713-01-00100Temporary Signs and Barricades 1     LUMP1.001.0037,500.0037,500.0086,000.0086,000.00120,000.00120,000.00
0038713-02-00300Temporary Pavement Markings (8" Width) 175     LNFT1.00175.000.2543.750.2543.750.2543.75
0039713-02-00500Temporary Pavement Markings (24" Width) 160     LNFT1.00160.000.5080.000.5080.000.5080.00
0040713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.787 MILE1.001.79705.001,259.84300.00536.10350.00625.45
0041713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 3.462 MILE1.003.46700.002,423.40700.002,423.40700.002,423.40
0042713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 7.12  MILE1.007.121,000.007,120.001,000.007,120.001,000.007,120.00
0043713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) 2     EACH1.002.0050.00100.0050.00100.0050.00100.00
0044726-01-00100Bedding Material 308.8   CUYD1.00308.80118.5036,592.80124.0038,291.20118.5036,592.80
0045727-01-00100Mobilization 1     LUMP200,000.00200,000.0060,000.0060,000.00150,000.00150,000.00148,000.00148,000.00
0046729-16-00200Object Marker Assembly (Type 2) 4     EACH1.004.0050.00200.0052.00208.0050.00200.00
0047729-16-00300Object Marker Assembly (Type 3) 4     EACH1.004.0090.00360.0095.00380.0090.00360.00
0048731-02-00100Reflectorized Raised Pavement Markers 472     EACH1.00472.006.002,832.006.252,950.006.002,832.00
0049732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 175     LNFT1.00175.004.00700.004.25743.754.00700.00
0050732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 160     LNFT1.00160.0018.002,880.0019.003,040.0018.002,880.00
0051732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 7.148 MILE1.007.154,900.0035,025.205,150.0036,812.204,900.0035,025.20
0052732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.462 MILE1.003.461,200.004,154.401,260.004,362.121,200.004,154.40
0053732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.033 MILE1.000.038,500.00280.508,100.00267.308,500.00280.50
0054732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 31     EACH1.0031.00350.0010,850.00370.0011,470.00350.0010,850.00
0055732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 3     EACH1.003.00350.001,050.00370.001,110.00350.001,050.00
0056732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 2     EACH1.002.00900.001,800.00950.001,900.00900.001,800.00
0057739-01-00100Hydro-Seeding 0.2   ACRE1.000.2012,218.002,443.607,500.001,500.0012,250.002,450.00
0058740-01-00100Construction Layout 1     LUMP1.001.007,500.007,500.0014,000.0014,000.0033,000.0033,000.00
0059NS-600-00220Saw Cutting Portland Cement Concrete Pavement 666     INLF1.00666.001.751,165.502.001,332.001.851,232.10
0060NS-713-00009Portable Changeable Message Sign (with communications) 2     EACH1.002.004,500.009,000.003,000.006,000.003,100.006,200.00
             
  CONTRACTOR TOTAL   246,164.81 1,432,551.23 1,555,855.22 1,575,133.63