Proposal:H.015057.6
Parish:St. Landry
Routes:LA 3116
Description:LA 3116: EUNICE REPAIRS
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$911,587.93
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $1,012,024.06 |
| 2 | 34356 | Prairie Contractors LLC | $1,017,528.76 |
| 3 | 33663 | Glenn Lege Construction LLC | $1,039,227.65 |
| 4 | 35849 | T.L. CONSTRUCTION LLC | $1,132,932.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | - 3 - Glenn Lege Construction LLC | - 4 - T.L. CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 23 | SQYD | 80.00 | 1,840.00 | 300.00 | 6,900.00 | 56.50 | 1,299.50 | 54.00 | 1,242.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 67 | SQYD | 85.00 | 5,695.00 | 350.00 | 23,450.00 | 45.00 | 3,015.00 | 48.00 | 3,216.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 15" - 18" RCPA, RCP, & PP | 149 | LNFT | 50.00 | 7,450.00 | 80.00 | 11,920.00 | 36.00 | 5,364.00 | 29.00 | 4,321.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 133 | CUYD | 90.00 | 11,970.00 | 143.00 | 19,019.00 | 84.00 | 11,172.00 | 65.00 | 8,645.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 200.00 | 2,000.00 | 550.00 | 5,500.00 | 175.00 | 1,750.00 | 550.00 | 5,500.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 199 | CUYD | 100.00 | 19,900.00 | 70.00 | 13,930.00 | 79.00 | 15,721.00 | 163.00 | 32,437.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 1,867 | TON | 175.00 | 326,725.00 | 165.00 | 308,055.00 | 142.00 | 265,114.00 | 192.00 | 358,464.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,066.6 | TON | 200.00 | 213,320.00 | 180.00 | 191,988.00 | 150.50 | 160,523.30 | 225.00 | 239,985.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 5,528 | SQYD | 7.00 | 38,696.00 | 7.00 | 38,696.00 | 3.25 | 17,966.00 | 7.00 | 38,696.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -404 | CUYD | 0.01 | -4.04 | 0.01 | -4.04 | 0.10 | -40.40 | 1.00 | -404.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 453 | SQYD | 225.00 | 101,925.00 | 210.00 | 95,130.00 | 167.00 | 75,651.00 | 165.00 | 74,745.00 | | 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 2,692 | LNFT | 4.00 | 10,768.00 | 4.75 | 12,787.00 | 3.75 | 10,095.00 | 8.75 | 23,555.00 | | 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 4,860 | LNFT | 4.00 | 19,440.00 | 4.75 | 23,085.00 | 3.75 | 18,225.00 | 8.85 | 43,011.00 | | 0014 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 48 | LNFT | 250.00 | 12,000.00 | 500.00 | 24,000.00 | 144.00 | 6,912.00 | 275.00 | 13,200.00 | | 0015 | 706-02-00200 | Concrete Drive (6" Thick) | 67 | SQYD | 135.00 | 9,045.00 | 375.00 | 25,125.00 | 93.00 | 6,231.00 | 200.00 | 13,400.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | 162,400.00 | 162,400.00 | 30,000.00 | 30,000.00 | | 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 54 | LNFT | 1.10 | 59.40 | 1.00 | 54.00 | 1.20 | 64.80 | 5.50 | 297.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.004 | MILE | 1,050.00 | 2,104.20 | 600.00 | 1,202.40 | 600.00 | 1,202.40 | 1,200.00 | 2,404.80 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.004 | MILE | 900.00 | 1,803.60 | 1.00 | 2.00 | 930.00 | 1,863.72 | 1,200.00 | 2,404.80 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.896 | MILE | 1,275.00 | 6,242.40 | 1.00 | 4.90 | 1,336.00 | 6,541.06 | 1,500.00 | 7,344.00 | | 0021 | 726-01-00100 | Bedding Material | 4.9 | CUYD | 200.00 | 980.00 | 175.00 | 857.50 | 132.00 | 646.80 | 300.00 | 1,470.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 85,000.00 | 85,000.00 | 167,050.00 | 167,050.00 | 100,000.00 | 100,000.00 | | 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 85.00 | 170.00 | 125.00 | 250.00 | 200.00 | 400.00 | 150.00 | 300.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 68 | EACH | 11.00 | 748.00 | 15.00 | 1,020.00 | 12.00 | 816.00 | 17.00 | 1,156.00 | | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 27 | LNFT | 20.00 | 540.00 | 25.00 | 675.00 | 21.50 | 580.50 | 31.00 | 837.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.3 | MILE | 8,250.00 | 10,725.00 | 10,000.00 | 13,000.00 | 8,715.00 | 11,329.50 | 9,500.00 | 12,350.00 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.51 | MILE | 4,950.00 | 2,524.50 | 6,000.00 | 3,060.00 | 5,227.00 | 2,665.77 | 6,000.00 | 3,060.00 | | 0028 | 735-01-00100 | Mailboxes | 38 | EACH | 25.00 | 950.00 | 5.00 | 190.00 | 29.00 | 1,102.00 | 26.00 | 988.00 | | 0029 | 735-02-00100 | Mailbox Supports (Single) | 38 | EACH | 275.00 | 10,450.00 | 450.00 | 17,100.00 | 290.50 | 11,039.00 | 420.00 | 15,960.00 | | 0030 | 739-01-00100 | Hydro-Seeding | 1.74 | ACRE | 3,850.00 | 6,699.00 | 5,000.00 | 8,700.00 | 3,255.00 | 5,663.70 | 5,000.00 | 8,700.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 | 5,800.00 | 5,800.00 | 10,000.00 | 10,000.00 | | 0032 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 5,384 | SQYD | 10.75 | 57,878.00 | 8.00 | 43,072.00 | 11.00 | 59,224.00 | 12.00 | 64,608.00 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 920 | INLF | 1.50 | 1,380.00 | 3.00 | 2,760.00 | 2.00 | 1,840.00 | 12.00 | 11,040.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,012,024.06 | | 1,017,528.76 | | 1,039,227.65 | | 1,132,932.60 |
|