Proposal:H.014116.6
Parish:Ascension
Routes:LA 943
Description:LA 943: LA 308 - LA 1 N INTERSECTION
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,874,717.41
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $5,037,352.19 |
| 2 | 06276 | Barriere Construction Co., LLC | $5,393,511.40 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,467,742.55 |
| 4 | 73475 | Madden Gulf Coast, LLC | $5,626,611.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 664 | LNFT | 10.50 | 6,972.00 | 7.50 | 4,980.00 | 8.00 | 5,312.00 | 7.50 | 4,980.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 2 - 60" CMP
3 - 72" CMP
112" CMP | 384 | LNFT | 40.00 | 15,360.00 | 38.25 | 14,688.00 | 40.00 | 15,360.00 | 40.00 | 15,360.00 | | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 2 - 24" RCP | 24 | LNFT | 32.00 | 768.00 | 31.50 | 756.00 | 32.00 | 768.00 | 40.00 | 960.00 | | 0004 | 203-02-00100 | Drainage Excavation | 512 | CUYD | 18.00 | 9,216.00 | 17.50 | 8,960.00 | 18.00 | 9,216.00 | 18.00 | 9,216.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 324 | CUYD | 95.00 | 30,780.00 | 210.00 | 68,040.00 | 88.00 | 28,512.00 | 125.00 | 40,500.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 800 | LNFT | 10.50 | 8,400.00 | 10.00 | 8,000.00 | 11.00 | 8,800.00 | 10.00 | 8,000.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 400 | LNFT | 2.10 | 840.00 | 6.25 | 2,500.00 | 1.75 | 700.00 | 2.00 | 800.00 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 26,987 | SQYD | 10.00 | 269,870.00 | 11.25 | 303,603.75 | 11.50 | 310,350.50 | 15.00 | 404,805.00 | | 0009 | 304-01-00100 | Lime | 191.28 | TON | 300.00 | 57,384.00 | 326.00 | 62,357.28 | 245.00 | 46,863.60 | 400.00 | 76,512.00 | | 0010 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 13,494 | SQYD | 6.60 | 89,060.40 | 3.25 | 43,855.50 | 2.00 | 26,988.00 | 5.00 | 67,470.00 | | 0011 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 6,747 | SQYD | 21.40 | 144,385.80 | 16.25 | 109,638.75 | 17.00 | 114,699.00 | 25.00 | 168,675.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 650 | CUYD | 190.00 | 123,500.00 | 80.00 | 52,000.00 | 72.00 | 46,800.00 | 145.00 | 94,250.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 28 | CUYD | 68.00 | 1,904.00 | 1.00 | 28.00 | 250.00 | 7,000.00 | 100.00 | 2,800.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 23,882.3 | TON | 102.00 | 2,435,994.60 | 125.00 | 2,985,287.50 | 114.00 | 2,722,582.20 | 102.00 | 2,435,994.60 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 530.6 | TON | 180.00 | 95,508.00 | 295.00 | 156,527.00 | 210.00 | 111,426.00 | 275.00 | 145,915.00 | | 0016 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 46,897 | GAL | 4.55 | 213,381.35 | 1.75 | 82,069.75 | 2.75 | 128,966.75 | 4.53 | 212,443.41 | | 0017 | 507-02-00200 | Aggregate (S2) | 68,966 | SQYD | 2.40 | 165,518.40 | 1.00 | 68,966.00 | 1.75 | 120,690.50 | 2.39 | 164,828.74 | | 0018 | 507-02-00300 | Aggregate (S3) | 68,966 | SQYD | 1.95 | 134,483.70 | 1.00 | 68,966.00 | 1.50 | 103,449.00 | 1.95 | 134,483.70 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 100,127 | SQYD | 2.46 | 246,312.42 | 2.75 | 275,349.25 | 4.00 | 400,508.00 | 1.85 | 185,234.95 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,488 | CUYD | 0.01 | -54.88 | 0.01 | -54.88 | 0.00 | 0.00 | 0.01 | -54.88 | | 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 166.2 | SQYD | 154.00 | 25,594.80 | 135.00 | 22,437.00 | 140.00 | 23,268.00 | 145.00 | 24,099.00 | | 0022 | 701-01-01081 | Cross Drain Pipe (48" RCP) | 168 | LNFT | 320.00 | 53,760.00 | 304.00 | 51,072.00 | 320.00 | 53,760.00 | 305.00 | 51,240.00 | | 0023 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 272 | LNFT | 522.00 | 141,984.00 | 498.00 | 135,456.00 | 525.00 | 142,800.00 | 500.00 | 136,000.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 125 | LNFT | 74.00 | 9,250.00 | 130.00 | 16,250.00 | 135.00 | 16,875.00 | 185.00 | 23,125.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 37.00 | 5,550.00 | 20.00 | 3,000.00 | 21.00 | 3,150.00 | 29.00 | 4,350.00 | | 0026 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 84.00 | 2,100.00 | 100.00 | 2,500.00 | 105.00 | 2,625.00 | 40.00 | 1,000.00 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 132.00 | 19,800.00 | 100.00 | 15,000.00 | 105.00 | 15,750.00 | 115.00 | 17,250.00 | | 0028 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,700.00 | 14,800.00 | 4,000.00 | 16,000.00 | 4,200.00 | 16,800.00 | 3,375.00 | 13,500.00 | | 0029 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,450.00 | 6,900.00 | 4,000.00 | 8,000.00 | 4,200.00 | 8,400.00 | 3,000.00 | 6,000.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 167,000.00 | 167,000.00 | 150,000.00 | 150,000.00 | 175,000.00 | 175,000.00 | | 0031 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 52.00 | 104.00 | 50.00 | 100.00 | 70.00 | 140.00 | 50.00 | 100.00 | | 0032 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,750.00 | 5,750.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | 15,000.00 | 15,000.00 | | 0033 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.76 | MILE | 310.00 | 2,405.60 | 2,000.00 | 15,520.00 | 325.00 | 2,522.00 | 270.00 | 2,095.20 | | 0034 | 726-01-00100 | Bedding Material | 346.3 | CUYD | 105.00 | 36,361.50 | 95.00 | 32,898.50 | 250.00 | 86,575.00 | 95.00 | 32,898.50 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 235,000.00 | 235,000.00 | 208,000.00 | 208,000.00 | 310,000.00 | 310,000.00 | 550,000.00 | 550,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 108.00 | 2,160.00 | 100.00 | 2,000.00 | 105.00 | 2,100.00 | 55.00 | 1,100.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 108.00 | 864.00 | 100.00 | 800.00 | 105.00 | 840.00 | 90.00 | 720.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,376 | EACH | 5.50 | 7,568.00 | 5.00 | 6,880.00 | 8.50 | 11,696.00 | 5.00 | 6,880.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 80 | LNFT | 21.00 | 1,680.00 | 20.00 | 1,600.00 | 21.00 | 1,680.00 | 20.00 | 1,600.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.9 | MILE | 5,200.00 | 82,680.00 | 4,800.00 | 76,320.00 | 5,200.00 | 82,680.00 | 4,800.00 | 76,320.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.7 | MILE | 925.00 | 7,122.50 | 900.00 | 6,930.00 | 1,600.00 | 12,320.00 | 900.00 | 6,930.00 | | 0042 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 950.00 | 1,900.00 | 950.00 | 1,900.00 | 850.00 | 1,700.00 | 950.00 | 1,900.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.057 | MILE | 12,000.00 | 684.00 | 10,000.00 | 570.00 | 10,000.00 | 570.00 | 10,000.00 | 570.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 23,000.00 | 23,000.00 | 35,000.00 | 35,000.00 | 42,000.00 | 42,000.00 | | 0045 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 144 | LNFT | 1,600.00 | 230,400.00 | 1,415.00 | 203,760.00 | 1,500.00 | 216,000.00 | 1,415.00 | 203,760.00 | | 0046 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) | 2 | EACH | 24,675.00 | 49,350.00 | 27,500.00 | 55,000.00 | 29,000.00 | 58,000.00 | 30,000.00 | 60,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,037,352.19 | | 5,393,511.40 | | 5,467,742.55 | | 5,626,611.22 |
|