Proposal:H.012061.6
Parish:Pointe Coupee
Routes:LA 1
Description:LA 1: BYU MOREAU AND LATERAL W15#7A BRS
Type Construction:CLEARING AND GRUBBING, TEMPORARY DETOUR ROADS, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES
Estimated Construction Cost:$5,893,383.90
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,843,553.90 |
| 2 | 55950 | Brown Industrial Construction, LLC | $5,135,161.68 |
| 3 | 55505 | MERRICK, LLC | $5,276,954.30 |
| 4 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $5,838,369.44 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $6,820,783.40 |
| 6 | 00044 | Guinn Construction, LLC | $7,381,385.50 |
| 7 | 56994 | Matt L. Guinn Construction, LLC | $8,213,776.50 |
| 8 | 00009 | Coastal Contractors, LLC | $10,181,076.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Brown Industrial Construction, LLC | - 3 - MERRICK, LLC | - 4 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 75,000.00 | 75,000.00 | 500,000.00 | 500,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-02-00020 | Removal of Aggregate Shoulder | 1,208 | SQYD | 6.00 | 7,248.00 | 8.50 | 10,268.00 | 5.00 | 6,040.00 | 9.00 | 10,872.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 122.8 | SQYD | 50.00 | 6,140.00 | 16.00 | 1,964.80 | 18.00 | 2,210.40 | 45.00 | 5,526.00 | | 0004 | 202-02-04501 | Removal of Bridge Str. No. 61390520403531, 96' X 40' Conc Span Bridge | 3,840 | LUMP | 15,000.00 | 15,000.00 | 200,000.00 | 200,000.00 | 35,000.00 | 35,000.00 | 45,000.00 | 45,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 61390520404171, 58' X 40' CONC. SLAB SPAN BRIDGE | 2,320 | LUMP | 15,000.00 | 15,000.00 | 150,000.00 | 150,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0006 | 202-02-05000 | Removal of Building (STA 111+75, RT.) | 1 | EACH | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 690 | LNFT | 7.00 | 4,830.00 | 9.00 | 6,210.00 | 10.00 | 6,900.00 | 9.00 | 6,210.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (24" - RCP) | 34 | LNFT | 55.00 | 1,870.00 | 25.00 | 850.00 | 30.00 | 1,020.00 | 25.00 | 850.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (27" - METAL) | 28 | LNFT | 65.00 | 1,820.00 | 25.00 | 700.00 | 30.00 | 840.00 | 25.00 | 700.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (27" - RCP) | 34 | LNFT | 55.00 | 1,870.00 | 25.00 | 850.00 | 30.00 | 1,020.00 | 25.00 | 850.00 | | 0011 | 203-01-00100 | General Excavation | 494 | CUYD | 24.00 | 11,856.00 | 20.00 | 9,880.00 | 20.00 | 9,880.00 | 23.00 | 11,362.00 | | 0012 | 203-02-00100 | Drainage Excavation | 779 | CUYD | 44.00 | 34,276.00 | 20.00 | 15,580.00 | 30.00 | 23,370.00 | 30.00 | 23,370.00 | | 0013 | 203-03-00100 | Embankment | 85 | CUYD | 60.00 | 5,100.00 | 200.00 | 17,000.00 | 60.00 | 5,100.00 | 82.00 | 6,970.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 175.00 | 2,450.00 | 180.00 | 2,520.00 | 185.00 | 2,590.00 | 200.00 | 2,800.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 1,357 | LNFT | 2.00 | 2,714.00 | 2.50 | 3,392.50 | 3.00 | 4,071.00 | 2.50 | 3,392.50 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 1,045.5 | SQYD | 84.00 | 87,822.00 | 95.00 | 99,322.50 | 110.00 | 115,005.00 | 50.00 | 52,275.00 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 44.4 | CUYD | 138.00 | 6,127.20 | 200.00 | 8,880.00 | 130.00 | 5,772.00 | 72.00 | 3,196.80 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 44.4 | CUYD | 68.00 | 3,019.20 | 190.00 | 8,436.00 | 90.00 | 3,996.00 | 140.00 | 6,216.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 409.1 | TON | 225.00 | 92,047.50 | 170.00 | 69,547.00 | 200.00 | 81,820.00 | 240.00 | 98,184.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 116.6 | TON | 250.00 | 29,150.00 | 200.00 | 23,320.00 | 240.00 | 27,984.00 | 290.00 | 33,814.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 1,273 | SQYD | 15.00 | 19,095.00 | 11.00 | 14,003.00 | 11.00 | 14,003.00 | 20.00 | 25,460.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -70 | CUYD | 1.00 | -70.00 | 0.01 | -0.70 | 0.01 | -0.70 | 0.01 | -0.70 | | 0023 | 510-01-00001 | Pavement Patching (16.5 inch minimum thickness) | 208 | SQYD | 150.00 | 31,200.00 | 195.00 | 40,560.00 | 240.00 | 49,920.00 | 200.00 | 41,600.00 | | 0024 | 701-05-01085 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 34 | LNFT | 220.00 | 7,480.00 | 160.00 | 5,440.00 | 180.00 | 6,120.00 | 370.76 | 12,605.84 | | 0025 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 30 | LNFT | 220.00 | 6,600.00 | 140.00 | 4,200.00 | 190.00 | 5,700.00 | 350.00 | 10,500.00 | | 0026 | 701-06-00060 | Side Drain Pipe Arch (30" Equiv. RCPA) | 38 | LNFT | 280.00 | 10,640.00 | 160.00 | 6,080.00 | 200.00 | 7,600.00 | 375.00 | 14,250.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 225 | LNFT | 37.00 | 8,325.00 | 31.00 | 6,975.00 | 35.00 | 7,875.00 | 32.00 | 7,200.00 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 130.00 | 26,000.00 | 115.00 | 23,000.00 | 140.00 | 28,000.00 | 120.00 | 24,000.00 | | 0029 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 2 | EACH | 3,900.00 | 7,800.00 | 3,100.00 | 6,200.00 | 3,700.00 | 7,400.00 | 3,200.00 | 6,400.00 | | 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 4,100.00 | 24,600.00 | 3,500.00 | 21,000.00 | 4,200.00 | 25,200.00 | 3,500.00 | 21,000.00 | | 0031 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 947 | SQYD | 90.00 | 85,230.00 | 90.00 | 85,230.00 | 95.00 | 89,965.00 | 115.00 | 108,905.00 | | 0032 | 711-04-00100 | Geotextile Fabric | 947 | SQYD | 10.00 | 9,470.00 | 3.50 | 3,314.50 | 4.00 | 3,788.00 | 4.00 | 3,788.00 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 86,500.00 | 86,500.00 | 65,000.00 | 65,000.00 | 140,000.00 | 140,000.00 | 125,000.00 | 125,000.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.224 | MILE | 1,400.00 | 3,113.60 | 2,000.00 | 4,448.00 | 1,800.00 | 4,003.20 | 1,500.00 | 3,336.00 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 147 | EACH | 8.00 | 1,176.00 | 10.00 | 1,470.00 | 10.00 | 1,470.00 | 8.00 | 1,176.00 | | 0036 | 717-01-00100 | Seeding | 31 | LB | 50.00 | 1,550.00 | 33.00 | 1,023.00 | 42.00 | 1,302.00 | 55.00 | 1,705.00 | | 0037 | 718-01-00100 | Fertilizer | 950 | LB | 2.75 | 2,612.50 | 1.65 | 1,567.50 | 2.00 | 1,900.00 | 3.00 | 2,850.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 70,000.00 | 70,000.00 | | 0039 | 725-01-00100 | Temporary Detour Roads | 10,441 | SQYD | 112.00 | 1,169,392.00 | 100.00 | 1,044,100.00 | 145.00 | 1,513,945.00 | 175.00 | 1,827,175.00 | | 0040 | 726-01-00100 | Bedding Material | 11.6 | CUYD | 135.00 | 1,566.00 | 200.00 | 2,320.00 | 185.00 | 2,146.00 | 200.00 | 2,320.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 484,000.00 | 484,000.00 | 500,000.00 | 500,000.00 | 525,000.00 | 525,000.00 | 583,000.00 | 583,000.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 90.00 | 720.00 | 110.00 | 880.00 | 91.00 | 728.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 146 | EACH | 8.50 | 1,241.00 | 8.00 | 1,168.00 | 10.00 | 1,460.00 | 11.00 | 1,606.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.108 | MILE | 9,800.00 | 10,858.40 | 5,510.00 | 6,105.08 | 6,500.00 | 7,202.00 | 7,500.00 | 8,310.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.823 | MILE | 5,500.00 | 4,526.50 | 1,500.00 | 1,234.50 | 1,800.00 | 1,481.40 | 2,000.00 | 1,646.00 | | 0046 | 735-01-00100 | Mailboxes | 2 | EACH | 35.00 | 70.00 | 10.00 | 20.00 | 300.00 | 600.00 | 40.00 | 80.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 250.00 | 500.00 | 75.00 | 150.00 | 265.00 | 530.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 80,000.00 | 80,000.00 | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | | 0049 | 804-01-00400 | Precast Concrete Piles (18") | 5,900 | LNFT | 155.00 | 914,500.00 | 110.00 | 649,000.00 | 140.00 | 826,000.00 | 150.00 | 885,000.00 | | 0050 | 805-01-00100 | Class A1 Concrete (Slab Span) | 396.4 | CUYD | 1,145.00 | 453,878.00 | 1,115.00 | 441,986.00 | 1,400.00 | 554,960.00 | 1,400.00 | 554,960.00 | | 0051 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 119 | CUYD | 2,100.00 | 249,900.00 | 2,100.00 | 249,900.00 | 2,100.00 | 249,900.00 | 2,200.00 | 261,800.00 | | 0052 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,696 | SQFT | 5.00 | 13,480.00 | 2.00 | 5,392.00 | 3.00 | 8,088.00 | 2.50 | 6,740.00 | | 0053 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,696 | SQFT | 5.00 | 13,480.00 | 2.50 | 6,740.00 | 4.00 | 10,784.00 | 3.50 | 9,436.00 | | 0054 | 806-01-00100 | Deformed Reinforcing Steel | 94,150 | LB | 2.00 | 188,300.00 | 1.50 | 141,225.00 | 2.00 | 188,300.00 | 1.30 | 122,395.00 | | 0055 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 175.00 | 70,000.00 | 260.00 | 104,000.00 | 200.00 | 80,000.00 | 300.00 | 120,000.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 100.00 | 320,000.00 | 120.00 | 384,000.00 | 110.00 | 352,000.00 | 120.00 | 384,000.00 | | 0057 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 310 | SFIN | 240.00 | 74,400.00 | 140.00 | 43,400.00 | 175.00 | 54,250.00 | 100.00 | 31,000.00 | | 0058 | 815-03-00300 | Joint Seal (Poured) | 480 | LNFT | 22.00 | 10,560.00 | 18.00 | 8,640.00 | 30.00 | 14,400.00 | 40.00 | 19,200.00 | | 0059 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 480 | LNFT | 20.00 | 9,600.00 | 6.50 | 3,120.00 | 13.00 | 6,240.00 | 15.00 | 7,200.00 | | 0060 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 640 | LNFT | 3.00 | 1,920.00 | 3.00 | 1,920.00 | 3.10 | 1,984.00 | 12.00 | 7,680.00 | | 0061 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,440 | INLF | 0.50 | 720.00 | 1.00 | 1,440.00 | 3.00 | 4,320.00 | 5.00 | 7,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,843,553.90 | | 5,135,161.68 | | 5,276,954.30 | | 5,838,369.44 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Guinn Construction, LLC | - 7 - Matt L. Guinn Construction, LLC | - 8 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 300,000.00 | 300,000.00 | 175,000.00 | 175,000.00 | 220,000.00 | 220,000.00 | 175,000.00 | 175,000.00 | | 0002 | 202-02-00020 | Removal of Aggregate Shoulder | 1,208 | SQYD | 5.00 | 6,040.00 | 10.00 | 12,080.00 | 15.00 | 18,120.00 | 54.00 | 65,232.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 122.8 | SQYD | 10.00 | 1,228.00 | 25.00 | 3,070.00 | 55.00 | 6,754.00 | 98.00 | 12,034.40 | | 0004 | 202-02-04501 | Removal of Bridge Str. No. 61390520403531, 96' X 40' Conc Span Bridge | 3,840 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 160,000.00 | 160,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 61390520404171, 58' X 40' CONC. SLAB SPAN BRIDGE | 2,320 | LUMP | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | 120,000.00 | 120,000.00 | | 0006 | 202-02-05000 | Removal of Building (STA 111+75, RT.) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 38,000.00 | 38,000.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 690 | LNFT | 8.00 | 5,520.00 | 5.00 | 3,450.00 | 7.50 | 5,175.00 | 11.00 | 7,590.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (24" - RCP) | 34 | LNFT | 20.00 | 680.00 | 15.00 | 510.00 | 45.00 | 1,530.00 | 145.00 | 4,930.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (27" - METAL) | 28 | LNFT | 20.00 | 560.00 | 15.00 | 420.00 | 45.00 | 1,260.00 | 175.00 | 4,900.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (27" - RCP) | 34 | LNFT | 20.00 | 680.00 | 15.00 | 510.00 | 45.00 | 1,530.00 | 145.00 | 4,930.00 | | 0011 | 203-01-00100 | General Excavation | 494 | CUYD | 30.00 | 14,820.00 | 30.00 | 14,820.00 | 50.00 | 24,700.00 | 95.00 | 46,930.00 | | 0012 | 203-02-00100 | Drainage Excavation | 779 | CUYD | 20.00 | 15,580.00 | 35.00 | 27,265.00 | 50.00 | 38,950.00 | 77.00 | 59,983.00 | | 0013 | 203-03-00100 | Embankment | 85 | CUYD | 250.00 | 21,250.00 | 100.00 | 8,500.00 | 350.00 | 29,750.00 | 166.00 | 14,110.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 14 | EACH | 180.00 | 2,520.00 | 500.00 | 7,000.00 | 250.00 | 3,500.00 | 235.00 | 3,290.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 1,357 | LNFT | 5.00 | 6,785.00 | 4.00 | 5,428.00 | 4.50 | 6,106.50 | 2.50 | 3,392.50 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 1,045.5 | SQYD | 92.00 | 96,186.00 | 135.00 | 141,142.50 | 155.00 | 162,052.50 | 137.00 | 143,233.50 | | 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 44.4 | CUYD | 22.00 | 976.80 | 250.00 | 11,100.00 | 165.00 | 7,326.00 | 296.00 | 13,142.40 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 44.4 | CUYD | 250.00 | 11,100.00 | 150.00 | 6,660.00 | 165.00 | 7,326.00 | 296.00 | 13,142.40 | | 0019 | 502-01-00100 | Asphalt Concrete | 409.1 | TON | 168.00 | 68,728.80 | 295.00 | 120,684.50 | 290.00 | 118,639.00 | 294.00 | 120,275.40 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 116.6 | TON | 196.00 | 22,853.60 | 350.00 | 40,810.00 | 315.00 | 36,729.00 | 359.00 | 41,859.40 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 1,273 | SQYD | 10.50 | 13,366.50 | 30.00 | 38,190.00 | 32.00 | 40,736.00 | 16.00 | 20,368.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -70 | CUYD | 0.01 | -0.70 | 0.00 | 0.00 | 1.00 | -70.00 | 0.01 | -0.70 | | 0023 | 510-01-00001 | Pavement Patching (16.5 inch minimum thickness) | 208 | SQYD | 193.00 | 40,144.00 | 195.00 | 40,560.00 | 300.00 | 62,400.00 | 241.00 | 50,128.00 | | 0024 | 701-05-01085 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 34 | LNFT | 280.00 | 9,520.00 | 305.00 | 10,370.00 | 165.00 | 5,610.00 | 348.00 | 11,832.00 | | 0025 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 30 | LNFT | 240.00 | 7,200.00 | 345.00 | 10,350.00 | 155.00 | 4,650.00 | 297.00 | 8,910.00 | | 0026 | 701-06-00060 | Side Drain Pipe Arch (30" Equiv. RCPA) | 38 | LNFT | 240.00 | 9,120.00 | 450.00 | 17,100.00 | 165.00 | 6,270.00 | 345.00 | 13,110.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 225 | LNFT | 30.00 | 6,750.00 | 38.00 | 8,550.00 | 48.00 | 10,800.00 | 31.00 | 6,975.00 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 115.00 | 23,000.00 | 140.00 | 28,000.00 | 152.00 | 30,400.00 | 115.00 | 23,000.00 | | 0029 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 2 | EACH | 3,000.00 | 6,000.00 | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 | 3,050.00 | 6,100.00 | | 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 3,500.00 | 21,000.00 | 5,000.00 | 30,000.00 | 4,500.00 | 27,000.00 | 3,500.00 | 21,000.00 | | 0031 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 947 | SQYD | 120.00 | 113,640.00 | 145.00 | 137,315.00 | 110.00 | 104,170.00 | 112.00 | 106,064.00 | | 0032 | 711-04-00100 | Geotextile Fabric | 947 | SQYD | 3.00 | 2,841.00 | 5.00 | 4,735.00 | 5.50 | 5,208.50 | 4.50 | 4,261.50 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 350,000.00 | 350,000.00 | 45,000.00 | 45,000.00 | 110,000.00 | 110,000.00 | 104,000.00 | 104,000.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.224 | MILE | 1,500.00 | 3,336.00 | 2,500.00 | 5,560.00 | 19,000.00 | 42,256.00 | 1,505.00 | 3,347.12 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 147 | EACH | 8.00 | 1,176.00 | 25.00 | 3,675.00 | 35.00 | 5,145.00 | 26.00 | 3,822.00 | | 0036 | 717-01-00100 | Seeding | 31 | LB | 33.00 | 1,023.00 | 50.00 | 1,550.00 | 30.00 | 930.00 | 33.00 | 1,023.00 | | 0037 | 718-01-00100 | Fertilizer | 950 | LB | 2.00 | 1,900.00 | 2.00 | 1,900.00 | 2.00 | 1,900.00 | 1.70 | 1,615.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 98,000.00 | 98,000.00 | | 0039 | 725-01-00100 | Temporary Detour Roads | 10,441 | SQYD | 115.00 | 1,200,715.00 | 175.00 | 1,827,175.00 | 245.00 | 2,558,045.00 | 343.00 | 3,581,263.00 | | 0040 | 726-01-00100 | Bedding Material | 11.6 | CUYD | 400.00 | 4,640.00 | 300.00 | 3,480.00 | 200.00 | 2,320.00 | 213.00 | 2,470.80 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 660,000.00 | 660,000.00 | 700,000.00 | 700,000.00 | 750,000.00 | 750,000.00 | 561,000.00 | 561,000.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 95.00 | 760.00 | 150.00 | 1,200.00 | 350.00 | 2,800.00 | 90.00 | 720.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 146 | EACH | 8.00 | 1,168.00 | 25.00 | 3,650.00 | 35.00 | 5,110.00 | 20.00 | 2,920.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.108 | MILE | 5,500.00 | 6,094.00 | 8,500.00 | 9,418.00 | 19,000.00 | 21,052.00 | 7,500.00 | 8,310.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.823 | MILE | 1,800.00 | 1,481.40 | 5,500.00 | 4,526.50 | 19,000.00 | 15,637.00 | 3,500.00 | 2,880.50 | | 0046 | 735-01-00100 | Mailboxes | 2 | EACH | 250.00 | 500.00 | 150.00 | 300.00 | 250.00 | 500.00 | 40.00 | 80.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 20.00 | 40.00 | 150.00 | 300.00 | 50.00 | 100.00 | 250.00 | 500.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 350,000.00 | 350,000.00 | 50,000.00 | 50,000.00 | 125,000.00 | 125,000.00 | 65,000.00 | 65,000.00 | | 0049 | 804-01-00400 | Precast Concrete Piles (18") | 5,900 | LNFT | 200.00 | 1,180,000.00 | 200.00 | 1,180,000.00 | 200.00 | 1,180,000.00 | 224.00 | 1,321,600.00 | | 0050 | 805-01-00100 | Class A1 Concrete (Slab Span) | 396.4 | CUYD | 1,975.00 | 782,890.00 | 3,250.00 | 1,288,300.00 | 2,700.00 | 1,070,280.00 | 3,500.00 | 1,387,400.00 | | 0051 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 119 | CUYD | 3,500.00 | 416,500.00 | 3,750.00 | 446,250.00 | 3,200.00 | 380,800.00 | 4,500.00 | 535,500.00 | | 0052 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,696 | SQFT | 1.50 | 4,044.00 | 3.00 | 8,088.00 | 2.00 | 5,392.00 | 3.00 | 8,088.00 | | 0053 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,696 | SQFT | 2.00 | 5,392.00 | 3.00 | 8,088.00 | 2.00 | 5,392.00 | 4.00 | 10,784.00 | | 0054 | 806-01-00100 | Deformed Reinforcing Steel | 94,150 | LB | 2.50 | 235,375.00 | 1.50 | 141,225.00 | 1.50 | 141,225.00 | 3.00 | 282,450.00 | | 0055 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 260.00 | 104,000.00 | 300.00 | 120,000.00 | 290.00 | 116,000.00 | 394.00 | 157,600.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 160.00 | 512,000.00 | 115.00 | 368,000.00 | 125.00 | 400,000.00 | 195.00 | 624,000.00 | | 0057 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 310 | SFIN | 150.00 | 46,500.00 | 300.00 | 93,000.00 | 165.00 | 51,150.00 | 126.00 | 39,060.00 | | 0058 | 815-03-00300 | Joint Seal (Poured) | 480 | LNFT | 20.00 | 9,600.00 | 30.00 | 14,400.00 | 18.00 | 8,640.00 | 64.00 | 30,720.00 | | 0059 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 480 | LNFT | 45.00 | 21,600.00 | 3.00 | 1,440.00 | 5.00 | 2,400.00 | 20.00 | 9,600.00 | | 0060 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 640 | LNFT | 5.75 | 3,680.00 | 3.00 | 1,920.00 | 5.00 | 3,200.00 | 10.00 | 6,400.00 | | 0061 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,440 | INLF | 5.75 | 8,280.00 | 3.00 | 4,320.00 | 2.00 | 2,880.00 | 5.00 | 7,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,820,783.40 | | 7,381,385.50 | | 8,213,776.50 | | 10,181,076.22 |
|