Proposal:H.007531.6
Parish:Ouachita
Routes:LA 15
Description:LA 15 (WINNSBORO ROAD) STREETSCAPING
Type Construction:CLEARING AND GRUBBING, SIDEWALKS, LIGHTING, AND RELATED WORK.
Estimated Construction Cost:$2,090,533.40
| Rank | License | Bidder | Construction Bid |
| 1 | 39001 | JD's Rebar & Construction, Inc. | $1,970,546.67 |
| 2 | 30774 | Progressive Construction Co., LLC | $3,298,465.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JD's Rebar & Construction, Inc. | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 19,820.70 | 19,820.70 | 115,000.00 | 115,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,704.25 | 11,704.25 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,035 | SQYD | 26.37 | 53,662.95 | 25.00 | 50,875.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 618 | LNFT | 7.33 | 4,529.94 | 25.00 | 15,450.00 | | 0005 | 202-03-38000 | Relocation of Sign | 8 | EACH | 513.88 | 4,111.04 | 400.00 | 3,200.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) (Select Soils) | 120 | CUYD | 52.99 | 6,358.80 | 75.00 | 9,000.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 80 | EACH | 61.86 | 4,948.80 | 55.00 | 4,400.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 265 | LNFT | 20.50 | 5,432.50 | 10.00 | 2,650.00 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 152.60 | 3,052.00 | 200.00 | 4,000.00 | | 0010 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 3,293.02 | 3,293.02 | 6,500.00 | 6,500.00 | | 0011 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 52 | LNFT | 261.25 | 13,585.00 | 50.00 | 2,600.00 | | 0012 | 706-01-00100 | Concrete Walk (4" Thick) | 2,612.2 | SQYD | 97.83 | 255,551.53 | 125.00 | 326,525.00 | | 0013 | 706-02-00200 | Concrete Drive (6" Thick) | 1,962.2 | SQYD | 123.66 | 242,645.65 | 135.00 | 264,897.00 | | 0014 | 706-04-00110 | Curb Ramps (Type 2) | 20.8 | SQYD | 407.27 | 8,471.22 | 400.00 | 8,320.00 | | 0015 | 706-04-00110 | Curb Ramps (Type 7) | 319.2 | SQYD | 26.54 | 8,471.57 | 400.00 | 127,680.00 | | 0016 | 707-01-00100 | Concrete Curb (Barrier) | 230 | LNFT | 73.66 | 16,941.80 | 30.00 | 6,900.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades (INCLUDES TEMPORARY BUSINESS ENTRANCES) | 1 | LUMP | 19,148.77 | 19,148.77 | 70,000.00 | 70,000.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 5,610.00 | 5,610.00 | 1,100.00 | 1,100.00 | | 0019 | 717-01-00100 | Seeding | 15 | LB | 44.00 | 660.00 | 25.00 | 375.00 | | 0020 | 718-01-00100 | Fertilizer | 15 | LB | 5.50 | 82.50 | 10.00 | 150.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 132,000.00 | 132,000.00 | 323,000.00 | 323,000.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,900.00 | 9,900.00 | 50,500.00 | 50,500.00 | | 0023 | 741-35-00100 | Adjust Valve or Meter Box (METER BOX) | 9 | EACH | 1,320.00 | 11,880.00 | 650.00 | 5,850.00 | | 0024 | 741-35-00100 | Adjust Valve or Meter Box (WATER VALVE) | 7 | EACH | 1,650.00 | 11,550.00 | 1,000.00 | 7,000.00 | | 0025 | 810-04-00100 | Hand Railing | 102 | LNFT | 143.03 | 14,589.06 | 335.00 | 34,170.00 | | 0026 | 822-01-00100 | Trenching and Backfilling | 6,205 | LNFT | 5.50 | 34,127.50 | 23.00 | 142,715.00 | | 0027 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (2 #10 + 2 #8 AWG THWN COPPER CONDUCTORS + 1 #10 AWG THWN COPPER GROUND) | 190 | LNFT | 6.60 | 1,254.00 | 15.50 | 2,945.00 | | 0028 | 822-02-00200 | Conduit w Conductors (PVC/HDPE) (1") (4 #10 AWG THWN COPPER CONDUCTORS + 1 #10 AWG THWN COPPER GROUND) | 8,955 | LNFT | 5.61 | 50,237.55 | 11.40 | 102,087.00 | | 0029 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (SECONDARY SERVICE CONDUIT RISERS FOR SERVICE CONDUCTORS BY ENTERGY | 18 | LNFT | 60.50 | 1,089.00 | 12.50 | 225.00 | | 0030 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (2 #8 + 2 #10 AWG THWN COPPER CONDUTORS + 1 #10 AWG COPPER GROUND) | 20 | LNFT | 30.80 | 616.00 | 21.25 | 425.00 | | 0031 | 822-02-02200 | Conduit w Conductors (Rigid Galv Steel) (1") (4 #10 AWG THWN COPPER CONDUCTORS + 1 #10 AWG COPPER GROUND) | 550 | LNFT | 15.68 | 8,624.00 | 20.00 | 11,000.00 | | 0032 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") (ABOVE GRADE 2" RGS CONDUIT SERVICE CONDUCTORS BY ENTERGY) | 25 | LNFT | 66.00 | 1,650.00 | 27.50 | 687.50 | | 0033 | 822-04-00100 | Jacked or Bored Casing (4" Dia) (PVC/HDPE) | 2,940 | LNFT | 66.00 | 194,040.00 | 38.50 | 113,190.00 | | 0034 | 822-05-02100 | Light Pole (12') (Smooth Aluminum ) | 142 | EACH | 3,300.00 | 468,600.00 | 6,467.00 | 918,314.00 | | 0035 | 822-07-02800 | Luminaire (IES Type "V")( 88 Watt) (LED) | 142 | EACH | 1,870.00 | 265,540.00 | 2,444.00 | 347,048.00 | | 0036 | 822-08-00200 | Electrical Service Point (Structure) | 2 | EACH | 14,300.00 | 28,600.00 | 74,251.00 | 148,502.00 | | 0037 | 822-22-00400 | Underground Marker Tape (6")(Non-Detectable) | 6,205 | LNFT | 0.22 | 1,365.10 | 0.20 | 1,241.00 | | 0038 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,068 | INLF | 1.65 | 1,762.20 | 3.00 | 3,204.00 | | 0039 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 24,420 | INLF | 1.32 | 32,234.40 | 2.00 | 48,840.00 | | 0040 | NS-700-00100 | Trench Drains | 2 | EACH | 6,402.91 | 12,805.82 | 6,450.00 | 12,900.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,970,546.67 | | 3,298,465.50 |
|