Search


Bid Tabulations for the Letting of 5/8/2024 LA DOTD Headquarters

Proposal:H.015575.6
Parish:St. Tammany
Routes:US 190B
Description:US 190B: US 190 - LA 21
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,116,884.02
Rank License BidderConstruction Bid
100046Barber Bros. Contracting Co., L.L.C$1,096,323.60
206276Barriere Construction Co., LLC$1,128,608.61
373475Madden Gulf Coast, LLC$1,290,522.53
402179Boh Bros. Construction Co., LLC.$2,375,925.63


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Barber Bros. Contracting Co., L.L.C
- 2 -
Barriere Construction Co., LLC
- 3 -
Madden Gulf Coast, LLC
- 4 -
Boh Bros. Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-03030Removal of Pavement Structure 435     SQYD20.008,700.0021.759,461.2530.0013,050.0050.0021,750.00
0002202-02-06100Removal of Concrete Walks and Drives 5.6   SQYD20.00112.0021.75121.8055.00308.00350.001,960.00
0003502-01-00100Asphalt Concrete 4,087     TON147.00600,789.00153.00625,311.00140.00572,180.00275.001,123,925.00
0004502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 767.4   TON147.00112,807.8040.0030,696.00100.0076,740.00450.00345,330.00
0005509-01-00100Milling Asphalt Pavement 37,732     SQYD2.5094,330.003.25122,629.004.00150,928.008.00301,856.00
0006509-02-00100Contractor Retained Reclaimed Asphalt Pavement -2,097     CUYD0.000.000.01-20.970.01-20.970.01-20.97
0007510-01-00102Pavement Patching (8" Minimum Thickness) 283     SQYD125.0035,375.0087.7524,833.25130.0036,790.00250.0070,750.00
0008706-01-00100Concrete Walk (4" Thick) 5.6   SQYD950.005,320.00216.001,209.601,250.007,000.00500.002,800.00
0009713-01-00100Temporary Signs and Barricades 1     LUMP55,000.0055,000.00113,000.00113,000.00165,000.00165,000.00150,000.00150,000.00
0010713-02-00300Temporary Pavement Markings (8" Width) 952     LNFT0.25238.000.019.520.25238.001.00952.00
0011713-02-00500Temporary Pavement Markings (24" Width) 216     LNFT0.50108.000.012.160.50108.004.00864.00
0012713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 3.426 MILE300.001,027.80350.001,199.10350.001,199.10350.001,199.10
0013713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 3.012 MILE600.001,807.200.010.03600.001,807.202,500.007,530.00
0014713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 9.518 MILE900.008,566.200.010.10900.008,566.203,500.0033,313.00
0015713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) 12     EACH25.00300.000.010.1225.00300.00125.001,500.00
0016713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) 3     EACH25.0075.0075.00225.0025.0075.00125.00375.00
0017714-01-00100Slab Sodding (Bermuda Grass) 435     SQYD19.008,265.0016.257,068.7512.005,220.0025.0010,875.00
0018727-01-00100Mobilization 1     LUMP105,000.00105,000.00113,000.00113,000.00125,000.00125,000.00175,000.00175,000.00
0019731-02-00100Reflectorized Raised Pavement Markers 328     EACH6.001,968.0010.753,526.005.001,640.0020.006,560.00
0020732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 476     LNFT4.502,142.007.003,332.004.001,904.0012.005,712.00
0021732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 108     LNFT18.001,944.0021.002,268.0016.001,728.0040.004,320.00
0022732-01-05200Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) 103     LNFT5.50566.508.00824.005.00515.0010.001,030.00
0023732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 4.579 MILE5,500.0025,184.505,400.0024,726.605,000.0022,895.008,500.0038,921.50
0024732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.506 MILE1,100.001,656.601,550.002,334.301,500.002,259.002,500.003,765.00
0025732-03-02010Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) 0.008 MILE10,000.0080.0013,000.00104.0010,000.0080.0010,000.0080.00
0026732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4     EACH375.001,500.00500.002,000.00400.001,600.00675.002,700.00
0027732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 1     EACH375.00375.00500.00500.00400.00400.00675.00675.00
0028735-01-00100Mailboxes 34     EACH5.00170.0026.00884.0090.003,060.0045.001,530.00
0029735-02-00100Mailbox Supports (Single) 34     EACH200.006,800.00220.007,480.00130.004,420.00350.0011,900.00
0030736-09-00100Loop Detector 200     LNFT38.007,600.0036.507,300.0034.006,800.0050.0010,000.00
0031736-10-00200Underground Junction Box (Type E) 1     EACH1,500.001,500.001,520.001,520.001,500.001,500.002,750.002,750.00
0032740-01-00100Construction Layout 1     LUMP5,000.005,000.0015,000.0015,000.0072,000.0072,000.0033,000.0033,000.00
0033NS-500-00340Saw Cutting Asphalt Concrete Pavement 815     INLF1.00815.004.003,260.002.001,630.001.501,222.50
0034NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,201     INLF1.001,201.004.004,804.003.003,603.001.501,801.50
             
  CONTRACTOR TOTAL   1,096,323.60 1,128,608.61 1,290,522.53 2,375,925.63