Proposal:H.015369.6
Parish:Vernon
Routes:LA 121
Description:LA 121: LA 8 - LA 28
Type Construction:MILLING ASPHALT CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,637,349.17
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $2,706,867.42 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,800,742.20 |
| 3 | 34356 | Prairie Contractors LLC | $2,954,223.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 58 | SQYD | 90.00 | 5,220.00 | 150.00 | 8,700.00 | 45.00 | 2,610.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 8 | LNFT | 220.00 | 1,760.00 | 22.00 | 176.00 | 35.00 | 280.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,041 | CUYD | 38.00 | 115,558.00 | 35.00 | 106,435.00 | 40.00 | 121,640.00 | | 0004 | 303-02-00100 | Removal of Existing Patches | 300 | SQYD | 36.00 | 10,800.00 | 10.00 | 3,000.00 | 20.00 | 6,000.00 | | 0005 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 43,061.1 | SQYD | 14.00 | 602,855.40 | 15.00 | 645,916.50 | 16.00 | 688,977.60 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,131 | CUYD | 50.00 | 56,550.00 | 110.00 | 124,410.00 | 35.00 | 39,585.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 8,722.1 | TON | 135.00 | 1,177,483.50 | 133.00 | 1,160,039.30 | 130.00 | 1,133,873.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 783.2 | TON | 135.00 | 105,732.00 | 290.00 | 227,128.00 | 175.00 | 137,060.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 46,157 | SQYD | 3.25 | 150,010.25 | 2.00 | 92,314.00 | 3.50 | 161,549.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,575 | CUYD | 1.00 | -2,575.00 | 1.00 | -2,575.00 | 0.01 | -25.75 | | 0011 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 900.00 | 14,400.00 | 345.00 | 5,520.00 | 500.00 | 8,000.00 | | 0012 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | 3,750.00 | 7,500.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 8 | LNFT | 10.00 | 80.00 | 20.00 | 160.00 | 6.00 | 48.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 47,500.00 | 47,500.00 | 36,500.00 | 36,500.00 | 165,000.00 | 165,000.00 | | 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.732 | MILE | 260.00 | 2,530.32 | 157.00 | 1,527.92 | 1,500.00 | 14,598.00 | | 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.696 | MILE | 1.00 | 5.70 | 655.00 | 3,730.88 | 750.00 | 4,272.00 | | 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 31.446 | MILE | 1.00 | 31.45 | 1,000.00 | 31,446.00 | 1,100.00 | 34,590.60 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 11.2 | TON | 800.00 | 8,960.00 | 800.00 | 8,960.00 | 900.00 | 10,080.00 | | 0019 | 717-01-00100 | Seeding | 336 | LB | 26.00 | 8,736.00 | 15.00 | 5,040.00 | 16.00 | 5,376.00 | | 0020 | 718-01-00100 | Fertilizer | 5,600 | LB | 0.70 | 3,920.00 | 0.75 | 4,200.00 | 0.75 | 4,200.00 | | 0021 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 4,500.00 | 4,500.00 | 50,000.00 | 50,000.00 | | 0022 | 726-01-00100 | Bedding Material | 5 | CUYD | 200.00 | 1,000.00 | 200.00 | 1,000.00 | 275.00 | 1,375.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 270,000.00 | 270,000.00 | 210,000.00 | 210,000.00 | 250,000.00 | 250,000.00 | | 0024 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 85.00 | 170.00 | 70.00 | 140.00 | 85.00 | 170.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 595 | EACH | 6.50 | 3,867.50 | 6.00 | 3,570.00 | 7.00 | 4,165.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 308 | LNFT | 4.50 | 1,386.00 | 4.00 | 1,232.00 | 5.00 | 1,540.00 | | 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 286 | LNFT | 17.00 | 4,862.00 | 16.00 | 4,576.00 | 19.00 | 5,434.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.482 | MILE | 6,000.00 | 62,892.00 | 5,900.00 | 61,843.80 | 7,000.00 | 73,374.00 | | 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.899 | MILE | 2,700.00 | 5,127.30 | 2,700.00 | 5,127.30 | 3,500.00 | 6,646.50 | | 0030 | 732-05-00100 | Removal of Existing Markings | 0.095 | MILE | 6,000.00 | 570.00 | 6,500.00 | 617.50 | 7,000.00 | 665.00 | | 0031 | 735-01-00100 | Mailboxes | 37 | EACH | 40.00 | 1,480.00 | 1.00 | 37.00 | 15.00 | 555.00 | | 0032 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 260.00 | 7,800.00 | 355.00 | 10,650.00 | 450.00 | 13,500.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 27,500.00 | 27,500.00 | 100.00 | 100.00 | | 0034 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 330 | INLF | 3.50 | 1,155.00 | 4.00 | 1,320.00 | 4.50 | 1,485.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,706,867.42 | | 2,800,742.20 | | 2,954,223.45 |
|