Proposal:H.015358.6
Parish:Jefferson Davis
Routes:LA 97, US 90
Description:US 90 & LA 97: ASPHALT OVERLAYS
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, CONCRETE WALK AND CURB RAMPS AND RELATED WORK.
Estimated Construction Cost:$2,072,325.77
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $2,302,354.00 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $2,639,483.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - R. E. Heidt Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03030 | Removal of Pavement Structure | 62.1 | SQYD | 450.00 | 27,945.00 | 52.50 | 3,260.25 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 900.4 | SQYD | 20.00 | 18,008.00 | 31.50 | 28,362.60 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 237 | LNFT | 14.00 | 3,318.00 | 15.75 | 3,732.75 | | 0004 | 203-01-00100 | General Excavation | 35 | CUYD | 400.00 | 14,000.00 | 500.00 | 17,500.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 29 | CUYD | 200.00 | 5,800.00 | 400.00 | 11,600.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 250.00 | 5,000.00 | 202.00 | 4,040.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 200 | LNFT | 17.00 | 3,400.00 | 14.14 | 2,828.00 | | 0008 | 302-02-12080 | Class II Base Course (12" Thick) (Asphalt Concrete Base) | 95.7 | SQYD | 185.00 | 17,704.50 | 295.00 | 28,231.50 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5 | CUYD | 500.00 | 2,500.00 | 1,450.00 | 7,250.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 5,423.5 | TON | 160.00 | 867,760.00 | 165.00 | 894,877.50 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 32,940 | SQYD | 5.50 | 181,170.00 | 12.00 | 395,280.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,658 | CUYD | 0.01 | -16.58 | 0.01 | -16.58 | | 0013 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 800 | SQYD | 190.00 | 152,000.00 | 126.00 | 100,800.00 | | 0014 | 702-04-00100 | Adjusting Manholes | 61 | EACH | 800.00 | 48,800.00 | 1,200.00 | 73,200.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 62 | SQYD | 115.00 | 7,130.00 | 157.50 | 9,765.00 | | 0016 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 17 | SQYD | 190.00 | 3,230.00 | 215.25 | 3,659.25 | | 0017 | 706-04-00110 | Curb Ramps Type 1 | 25.6 | SQYD | 275.00 | 7,040.00 | 336.00 | 8,601.60 | | 0018 | 706-04-00110 | Curb Ramps Type 2 | 20.8 | SQYD | 275.00 | 5,720.00 | 451.50 | 9,391.20 | | 0019 | 706-04-00110 | Curb Ramps Type 3 | 251.1 | SQYD | 280.00 | 70,308.00 | 320.25 | 80,414.78 | | 0020 | 706-04-00110 | Curb Ramps Type 4 | 17.9 | SQYD | 280.00 | 5,012.00 | 414.75 | 7,424.03 | | 0021 | 706-04-00110 | Curb Ramps Type 6 | 60.2 | SQYD | 300.00 | 18,060.00 | 299.25 | 18,014.85 | | 0022 | 706-04-00110 | Curb Ramps Type 7 | 571.9 | SQYD | 280.00 | 160,132.00 | 299.25 | 171,141.08 | | 0023 | 706-04-00110 | Curb Ramps Type 8 | 77.5 | SQYD | 280.00 | 21,700.00 | 309.75 | 24,005.63 | | 0024 | 707-01-00100 | Concrete Curb | 237 | LNFT | 50.00 | 11,850.00 | 26.25 | 6,221.25 | | 0025 | 707-03-00100 | Combination Concrete Curb and Gutter | 105 | LNFT | 50.00 | 5,250.00 | 79.80 | 8,379.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 140,000.00 | 140,000.00 | 80,000.00 | 80,000.00 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,395 | LNFT | 0.01 | 33.95 | 0.51 | 1,731.45 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,789 | LNFT | 0.01 | 57.89 | 1.02 | 5,904.78 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.431 | MILE | 550.00 | 4,637.05 | 1,000.00 | 8,431.00 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.072 | MILE | 800.00 | 857.60 | 714.00 | 765.41 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.952 | MILE | 1,200.00 | 22,742.40 | 1,122.00 | 21,264.14 | | 0032 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 0.01 | 0.04 | 51.00 | 204.00 | | 0033 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 6 | EACH | 0.01 | 0.06 | 51.00 | 306.00 | | 0034 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 0.01 | 0.06 | 76.50 | 459.00 | | 0035 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 12 | EACH | 0.01 | 0.12 | 52.50 | 630.00 | | 0036 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 16 | EACH | 0.01 | 0.16 | 52.50 | 840.00 | | 0037 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 10 | EACH | 0.01 | 0.10 | 52.50 | 525.00 | | 0038 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 15 | EACH | 0.01 | 0.15 | 52.50 | 787.50 | | 0039 | 717-01-00100 | Seeding | 100 | LB | 25.00 | 2,500.00 | 21.00 | 2,100.00 | | 0040 | 718-01-00100 | Fertilizer | 50 | LB | 25.00 | 1,250.00 | 21.00 | 1,050.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 175,000.00 | 175,000.00 | 325,000.00 | 325,000.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,549 | EACH | 7.25 | 11,230.25 | 6.50 | 10,068.50 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,723 | LNFT | 4.25 | 7,322.75 | 3.78 | 6,512.94 | | 0044 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,752 | LNFT | 17.50 | 30,660.00 | 15.86 | 27,786.72 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 304 | LNFT | 19.00 | 5,776.00 | 16.90 | 5,137.60 | | 0046 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 1,174 | LNFT | 1.50 | 1,761.00 | 1.26 | 1,479.24 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.923 | MILE | 7,000.00 | 48,461.00 | 6,247.50 | 43,251.44 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.647 | MILE | 3,500.00 | 2,264.50 | 2,940.00 | 1,902.18 | | 0049 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.237 | MILE | 20,000.00 | 4,740.00 | 16,747.50 | 3,969.16 | | 0050 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 6 | EACH | 400.00 | 2,400.00 | 341.25 | 2,047.50 | | 0051 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 700.00 | 1,400.00 | 577.50 | 1,155.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 400.00 | 3,600.00 | 367.50 | 3,307.50 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 400.00 | 4,000.00 | 367.50 | 3,675.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0055 | 741-35-00100 | Adjust Valve or Meter Box | 8 | EACH | 1,000.00 | 8,000.00 | 960.00 | 7,680.00 | | 0056 | NS-201-00005 | Arborist Services | 1 | LUMP | 10,000.00 | 10,000.00 | 2,750.00 | 2,750.00 | | 0057 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 85 | TON | 350.00 | 29,750.00 | 200.00 | 17,000.00 | | 0058 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,177 | INLF | 2.00 | 2,354.00 | 7.00 | 8,239.00 | | 0059 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 278 | INLF | 3.00 | 834.00 | 12.00 | 3,336.00 | | 0060 | NS-719-00003 | Root Pruning | 1 | LUMP | 10,000.00 | 10,000.00 | 1,110.00 | 1,110.00 | | 0061 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 89 | EACH | 1,100.00 | 97,900.00 | 1,023.75 | 91,113.75 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,302,354.00 | | 2,639,483.50 |
|