Proposal:H.015274.6
Parish:Red River
Routes:US 71
Description:US 71: US 371 - LA 515
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLY, AND RELATED WORK.
Estimated Construction Cost:$2,802,542.46
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $2,936,402.91 |
| 2 | 08584 | Madden Contracting Co., LLC | $3,153,372.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Madden Contracting Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 461.1 | LNFT | 13.00 | 5,994.30 | 15.00 | 6,916.50 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) Pipe Removal 18" | 63 | LNFT | 110.00 | 6,930.00 | 33.00 | 2,079.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,026 | CUYD | 50.00 | 101,300.00 | 35.00 | 70,910.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 6 | CUYD | 1,250.00 | 7,500.00 | 100.00 | 600.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 13,186.8 | TON | 155.00 | 2,043,954.00 | 153.50 | 2,024,173.80 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 509.8 | TON | 255.00 | 129,999.00 | 105.75 | 53,911.35 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 4,891 | SQYD | 12.50 | 61,137.50 | 20.00 | 97,820.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -159 | CUYD | 0.01 | -1.59 | 0.10 | -15.90 | | 0009 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 421 | SQYD | 180.00 | 75,780.00 | 175.00 | 73,675.00 | | 0010 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 64 | LNFT | 385.00 | 24,640.00 | 385.00 | 24,640.00 | | 0011 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 11.00 | 704.00 | 10.00 | 640.00 | | 0012 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 312.5 | LNFT | 40.00 | 12,500.00 | 37.00 | 11,562.50 | | 0013 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 95.00 | 9,500.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 137.50 | 13,750.00 | 135.00 | 13,500.00 | | 0015 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 4,300.00 | 17,200.00 | 4,400.00 | 17,600.00 | | 0016 | 707-04-00100 | Asphalt Curb | 54.4 | LNFT | 12.00 | 652.80 | 1.00 | 54.40 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 251,500.00 | 251,500.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.396 | MILE | 850.00 | 4,586.60 | 300.00 | 1,618.80 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.177 | MILE | 1,100.00 | 2,394.70 | 1,000.00 | 2,177.00 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.6 | MILE | 1,100.00 | 20,460.00 | 1,000.00 | 18,600.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 14 | TON | 935.00 | 13,090.00 | 850.00 | 11,900.00 | | 0022 | 717-01-00100 | Seeding | 315 | LB | 22.00 | 6,930.00 | 20.00 | 6,300.00 | | 0023 | 718-01-00100 | Fertilizer | 7,000 | LB | 0.83 | 5,810.00 | 0.75 | 5,250.00 | | 0024 | 724-01-00100 | Rumble Strips (Centerline) | 5.07 | MILE | 2,150.00 | 10,900.50 | 1,950.00 | 9,886.50 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.14 | MILE | 2,150.00 | 21,801.00 | 1,950.00 | 19,773.00 | | 0026 | 726-01-00100 | Bedding Material | 14.2 | CUYD | 275.00 | 3,905.00 | 165.00 | 2,343.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 85,000.00 | 85,000.00 | 251,500.00 | 251,500.00 | | 0028 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 93.50 | 187.00 | 115.00 | 230.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 137.50 | 550.00 | 130.00 | 520.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,149 | EACH | 9.00 | 10,341.00 | 8.00 | 9,192.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.6 | MILE | 6,400.00 | 119,040.00 | 5,800.00 | 107,880.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.177 | MILE | 3,100.00 | 6,748.70 | 2,800.00 | 6,095.60 | | 0033 | 735-01-00100 | Mailboxes | 24 | EACH | 1.10 | 26.40 | 20.00 | 480.00 | | 0034 | 735-02-00100 | Mailbox Supports (Single) | 24 | EACH | 318.00 | 7,632.00 | 290.00 | 6,960.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 | 30,000.00 | 30,000.00 | | 0036 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 33.00 | 3,960.00 | 30.00 | 3,600.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,936,402.91 | | 3,153,372.55 |
|