Search


Bid Tabulations for the Letting of 5/8/2024 LA DOTD Headquarters

Proposal:H.015058.6
Parish:Vermilion
Routes:LA 14-Y, LA 331
Description:LA 14-BUSINESS & LA 331: ERATH
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,723,798.17
Rank License BidderConstruction Bid
133663Glenn Lege Construction LLC$3,156,027.61
234356Prairie Contractors LLC$3,564,210.32
351821Elliott Construction, LLC$4,385,369.23


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Glenn Lege Construction LLC
- 2 -
Prairie Contractors LLC
- 3 -
Elliott Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP32,100.0032,100.006,000.006,000.005,000.005,000.00
0002202-02-00010Removal of BRICK MAILBOXES2     EACH450.00900.002,000.004,000.00250.00500.00
0003202-02-02000Removal of Asphalt Drives 1,637     SQYD8.4213,783.5420.0032,740.0030.0049,110.00
0004202-02-06100Removal of Concrete Walks and Drives 386     SQYD16.256,272.5060.0023,160.0040.0015,440.00
0005202-02-14500Removal of Guard Rail 360     LNFT16.255,850.0017.006,120.0018.006,480.00
0006202-02-32100Removal of Pipe (Cross Drain) (24" RCP)46     LNFT143.226,588.1255.002,530.0080.003,680.00
0007202-02-32100Removal of Pipe (Cross Drain) 66" CMP66     LNFT143.129,445.92100.006,600.00100.006,600.00
0008203-07-00100Borrow (Vehicular Measurement) 448     CUYD9.544,273.9251.0022,848.0050.0022,400.00
0009204-02-00100Temporary Hay Bales 30     EACH63.881,916.4065.001,950.0025.00750.00
0010204-05-00100Temporary Sediment Check Dams (Hay) 28     EACH203.265,691.28175.004,900.00200.005,600.00
0011204-06-00100Temporary Silt Fencing 26,186     LNFT2.3260,751.522.2558,918.502.5065,465.00
0012303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 2,113     SQYD11.7524,827.7552.00109,876.0020.0042,260.00
0013303-02-00100Removal of Existing Patches 90     SQYD31.362,822.4060.005,400.0050.004,500.00
0014309-01-10000In-Place Cement Treated Subgrade (10" Thick) 2,113     SQYD17.0035,921.0052.00109,876.0022.0046,486.00
0015401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,740     CUYD47.7683,102.4035.0060,900.0050.0087,000.00
0016402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD46.004,600.0080.008,000.00100.0010,000.00
0017402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 20     CUYD46.00920.0080.001,600.00100.002,000.00
0018502-01-00100Asphalt Concrete 11,202.6   TON119.621,340,055.01111.001,243,488.60150.001,680,390.00
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,014.1   TON126.91128,699.43180.00182,538.00200.00202,820.00
0020509-01-00100Milling Asphalt Pavement 35,290     SQYD2.88101,635.204.15146,453.505.00176,450.00
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -3,462     CUYD0.10-346.200.01-34.620.01-34.62
0022510-01-00200Pavement Patching (12" Minimum Thickness) 1,003     SQYD83.6983,941.07135.00135,405.00210.00210,630.00
0023602-02-00200Cleaning and Resealing Existing Longitudinal Pavement Joints 22,231     LNFT3.1970,916.892.0044,462.004.0088,924.00
0024602-02-00300Cleaning and Resealing Existing Transverse Pavements Joints 37,331     LNFT3.42127,672.022.0074,662.004.50167,989.50
0025602-03-00100Cleaning and Sealing Random Cracks 250     LNFT5.751,437.506.001,500.005.501,375.00
0026701-01-01001Cross Drain Pipe (24" RCP) 56     LNFT201.8911,305.84350.0019,600.00350.0019,600.00
0027701-01-01140Cross Drain Pipe (72" RCP) 72     LNFT705.0450,762.88900.0064,800.001,450.00104,400.00
0028701-14-00100Cleaning Existing Pipes 98     LNFT210.0020,580.0035.003,430.00200.0019,600.00
0029701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 78     LNFT135.0010,530.006.00468.0095.007,410.00
0030702-02-00300Manholes (R-CB-11 MOD) 1     EACH19,989.0019,989.0017,000.0017,000.0015,000.0015,000.00
0031704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 200     LNFT156.8031,360.00165.0033,000.0080.0016,000.00
0032704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 12.5   LNFT46.46580.7550.00625.0040.00500.00
0033704-07-00200Guard Rail Transitions (Double Thrie Beam) 75     LNFT145.1910,889.25150.0011,250.00145.0010,875.00
0034704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 3     EACH4,878.3014,634.905,000.0015,000.004,200.0012,600.00
0035706-01-00100Concrete Walk (4" Thick) 59     SQYD75.004,425.00150.008,850.00155.009,145.00
0036706-02-00200Concrete Drive (6" Thick) 386     SQYD85.0032,810.00145.0055,970.00180.0069,480.00
0037706-04-00110Curb Ramps (Type 6)41.1   SQYD400.0016,440.00250.0010,275.00210.008,631.00
0038706-04-00110Curb Ramps (Type 7)53.2   SQYD450.0023,940.00250.0013,300.00210.0011,172.00
0039707-03-00100Combination Concrete Curb and Gutter 105     LNFT70.007,350.0090.009,450.00135.0014,175.00
0040707-04-00100Asphalt Curb 27     LNFT55.001,485.00400.0010,800.00300.008,100.00
0041711-01-04000Riprap (55 lb, 18" Thick) 52     SQYD153.507,982.00150.007,800.00150.007,800.00
0042711-04-00100Geotextile Fabric 52     SQYD3.00156.005.00260.0018.00936.00
0043713-01-00100Temporary Signs and Barricades 1     LUMP86,258.0486,258.04170,000.00170,000.00100,000.00100,000.00
0044713-02-00300Temporary Pavement Markings (8" Width) 112     LNFT0.5966.080.011.121.00112.00
0045713-02-00500Temporary Pavement Markings (24" Width) 246     LNFT1.33327.180.012.461.50369.00
0046713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 3.05  MILE600.001,830.005,550.0016,927.50650.001,982.50
0047713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 6.8   MILE987.286,713.501,000.006,800.00950.006,460.00
0048713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 18.671 MILE1,277.6523,855.001,200.0022,405.201,200.0022,405.20
0049713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) 6     EACH58.08348.480.010.0655.00330.00
0050722-02-00100Project Site Laboratory (Equipped) 1     EACH11,425.0011,425.0030,000.0030,000.0015,000.0015,000.00
0051726-01-00100Bedding Material 21.2   CUYD95.002,014.00325.006,890.00175.003,710.00
0052727-01-00100Mobilization 1     LUMP173,645.00173,645.00260,000.00260,000.00400,000.00400,000.00
0053729-01-00103Sign (Type A)(Relocate) 24     SQFT99.502,388.0040.00960.0040.00960.00
0054729-16-00200Object Marker Assembly (Type 2) 8     EACH127.771,022.16120.00960.0085.00680.00
0055729-16-00300Object Marker Assembly (Type 3) 8     EACH145.191,161.52150.001,200.00100.00800.00
0056729-22-00100Square Tubing Post with 2-1/4" Anchor 3     EACH353.261,059.78225.00675.00275.00825.00
0057731-02-00100Reflectorized Raised Pavement Markers 658     EACH7.554,967.907.254,770.507.254,770.50
0058732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 112     LNFT3.66409.924.00448.003.50392.00
0059732-01-01060Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) 298     LNFT7.552,249.908.002,384.007.252,160.50
0060732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 142     LNFT17.132,432.4617.002,414.0016.252,307.50
0061732-01-05200Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) 274     LNFT3.781,035.724.001,096.003.50959.00
0062732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 6.933 MILE6,852.8547,510.817,000.0048,531.006,500.0045,064.50
0063732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.265 MILE3,310.287,497.783,500.007,927.503,150.007,134.75
0064732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 1     EACH464.60464.60500.00500.00450.00450.00
0065732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 1     EACH464.60464.60500.00500.00450.00450.00
0066732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) 2     EACH1,277.652,555.301,500.003,000.001,200.002,400.00
0067732-05-00100Removal of Existing Markings 0.238 MILE7,956.281,893.598,000.001,904.007,550.001,796.90
0068735-01-00100Mailboxes 21     EACH63.881,341.4810.00210.0025.00525.00
0069735-02-00100Mailbox Supports (Single) 19     EACH232.304,413.70450.008,550.00275.005,225.00
0070735-03-00100Mailbox Supports (Double) 1     EACH348.45348.45450.00450.00385.00385.00
0071739-01-00100Hydro-Seeding 2.74  ACRE3,252.208,911.034,500.0012,330.003,650.0010,001.00
0072740-01-00100Construction Layout 1     LUMP11,250.0011,250.0010,000.0010,000.0025,000.0025,000.00
0073811-01-00100Cleaning and Painting (EXISTING BRIDGE RAIL)1,600     LUMP90,300.0090,300.00100,000.00100,000.00250,000.00250,000.00
0074NS-500-00180Roadway Reinforcing Mesh (Complete Road System) 31,314     SQYD7.55236,420.708.50266,169.007.50234,855.00
0075NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 124     LNFT3.61447.643.50434.005.00620.00
           
  CONTRACTOR TOTAL   3,156,027.61 3,564,210.32 4,385,369.23