Proposal:H.015058.6
Parish:Vermilion
Routes:LA 14-Y, LA 331
Description:LA 14-BUSINESS & LA 331: ERATH
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,723,798.17
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $3,156,027.61 |
| 2 | 34356 | Prairie Contractors LLC | $3,564,210.32 |
| 3 | 51821 | Elliott Construction, LLC | $4,385,369.23 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 32,100.00 | 32,100.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-00010 | Removal of BRICK MAILBOXES | 2 | EACH | 450.00 | 900.00 | 2,000.00 | 4,000.00 | 250.00 | 500.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,637 | SQYD | 8.42 | 13,783.54 | 20.00 | 32,740.00 | 30.00 | 49,110.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 386 | SQYD | 16.25 | 6,272.50 | 60.00 | 23,160.00 | 40.00 | 15,440.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 360 | LNFT | 16.25 | 5,850.00 | 17.00 | 6,120.00 | 18.00 | 6,480.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 46 | LNFT | 143.22 | 6,588.12 | 55.00 | 2,530.00 | 80.00 | 3,680.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 66" CMP | 66 | LNFT | 143.12 | 9,445.92 | 100.00 | 6,600.00 | 100.00 | 6,600.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 448 | CUYD | 9.54 | 4,273.92 | 51.00 | 22,848.00 | 50.00 | 22,400.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 30 | EACH | 63.88 | 1,916.40 | 65.00 | 1,950.00 | 25.00 | 750.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 28 | EACH | 203.26 | 5,691.28 | 175.00 | 4,900.00 | 200.00 | 5,600.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 26,186 | LNFT | 2.32 | 60,751.52 | 2.25 | 58,918.50 | 2.50 | 65,465.00 | | 0012 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 2,113 | SQYD | 11.75 | 24,827.75 | 52.00 | 109,876.00 | 20.00 | 42,260.00 | | 0013 | 303-02-00100 | Removal of Existing Patches | 90 | SQYD | 31.36 | 2,822.40 | 60.00 | 5,400.00 | 50.00 | 4,500.00 | | 0014 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 2,113 | SQYD | 17.00 | 35,921.00 | 52.00 | 109,876.00 | 22.00 | 46,486.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,740 | CUYD | 47.76 | 83,102.40 | 35.00 | 60,900.00 | 50.00 | 87,000.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 46.00 | 4,600.00 | 80.00 | 8,000.00 | 100.00 | 10,000.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 46.00 | 920.00 | 80.00 | 1,600.00 | 100.00 | 2,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 11,202.6 | TON | 119.62 | 1,340,055.01 | 111.00 | 1,243,488.60 | 150.00 | 1,680,390.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,014.1 | TON | 126.91 | 128,699.43 | 180.00 | 182,538.00 | 200.00 | 202,820.00 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 35,290 | SQYD | 2.88 | 101,635.20 | 4.15 | 146,453.50 | 5.00 | 176,450.00 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,462 | CUYD | 0.10 | -346.20 | 0.01 | -34.62 | 0.01 | -34.62 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,003 | SQYD | 83.69 | 83,941.07 | 135.00 | 135,405.00 | 210.00 | 210,630.00 | | 0023 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 22,231 | LNFT | 3.19 | 70,916.89 | 2.00 | 44,462.00 | 4.00 | 88,924.00 | | 0024 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 37,331 | LNFT | 3.42 | 127,672.02 | 2.00 | 74,662.00 | 4.50 | 167,989.50 | | 0025 | 602-03-00100 | Cleaning and Sealing Random Cracks | 250 | LNFT | 5.75 | 1,437.50 | 6.00 | 1,500.00 | 5.50 | 1,375.00 | | 0026 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 56 | LNFT | 201.89 | 11,305.84 | 350.00 | 19,600.00 | 350.00 | 19,600.00 | | 0027 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 72 | LNFT | 705.04 | 50,762.88 | 900.00 | 64,800.00 | 1,450.00 | 104,400.00 | | 0028 | 701-14-00100 | Cleaning Existing Pipes | 98 | LNFT | 210.00 | 20,580.00 | 35.00 | 3,430.00 | 200.00 | 19,600.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 78 | LNFT | 135.00 | 10,530.00 | 6.00 | 468.00 | 95.00 | 7,410.00 | | 0030 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 19,989.00 | 19,989.00 | 17,000.00 | 17,000.00 | 15,000.00 | 15,000.00 | | 0031 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 200 | LNFT | 156.80 | 31,360.00 | 165.00 | 33,000.00 | 80.00 | 16,000.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 12.5 | LNFT | 46.46 | 580.75 | 50.00 | 625.00 | 40.00 | 500.00 | | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 145.19 | 10,889.25 | 150.00 | 11,250.00 | 145.00 | 10,875.00 | | 0034 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,878.30 | 14,634.90 | 5,000.00 | 15,000.00 | 4,200.00 | 12,600.00 | | 0035 | 706-01-00100 | Concrete Walk (4" Thick) | 59 | SQYD | 75.00 | 4,425.00 | 150.00 | 8,850.00 | 155.00 | 9,145.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 386 | SQYD | 85.00 | 32,810.00 | 145.00 | 55,970.00 | 180.00 | 69,480.00 | | 0037 | 706-04-00110 | Curb Ramps (Type 6) | 41.1 | SQYD | 400.00 | 16,440.00 | 250.00 | 10,275.00 | 210.00 | 8,631.00 | | 0038 | 706-04-00110 | Curb Ramps (Type 7) | 53.2 | SQYD | 450.00 | 23,940.00 | 250.00 | 13,300.00 | 210.00 | 11,172.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 105 | LNFT | 70.00 | 7,350.00 | 90.00 | 9,450.00 | 135.00 | 14,175.00 | | 0040 | 707-04-00100 | Asphalt Curb | 27 | LNFT | 55.00 | 1,485.00 | 400.00 | 10,800.00 | 300.00 | 8,100.00 | | 0041 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 52 | SQYD | 153.50 | 7,982.00 | 150.00 | 7,800.00 | 150.00 | 7,800.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 52 | SQYD | 3.00 | 156.00 | 5.00 | 260.00 | 18.00 | 936.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 86,258.04 | 86,258.04 | 170,000.00 | 170,000.00 | 100,000.00 | 100,000.00 | | 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 112 | LNFT | 0.59 | 66.08 | 0.01 | 1.12 | 1.00 | 112.00 | | 0045 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 246 | LNFT | 1.33 | 327.18 | 0.01 | 2.46 | 1.50 | 369.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.05 | MILE | 600.00 | 1,830.00 | 5,550.00 | 16,927.50 | 650.00 | 1,982.50 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.8 | MILE | 987.28 | 6,713.50 | 1,000.00 | 6,800.00 | 950.00 | 6,460.00 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.671 | MILE | 1,277.65 | 23,855.00 | 1,200.00 | 22,405.20 | 1,200.00 | 22,405.20 | | 0049 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 58.08 | 348.48 | 0.01 | 0.06 | 55.00 | 330.00 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 11,425.00 | 11,425.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0051 | 726-01-00100 | Bedding Material | 21.2 | CUYD | 95.00 | 2,014.00 | 325.00 | 6,890.00 | 175.00 | 3,710.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 173,645.00 | 173,645.00 | 260,000.00 | 260,000.00 | 400,000.00 | 400,000.00 | | 0053 | 729-01-00103 | Sign (Type A)(Relocate) | 24 | SQFT | 99.50 | 2,388.00 | 40.00 | 960.00 | 40.00 | 960.00 | | 0054 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 127.77 | 1,022.16 | 120.00 | 960.00 | 85.00 | 680.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 145.19 | 1,161.52 | 150.00 | 1,200.00 | 100.00 | 800.00 | | 0056 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 353.26 | 1,059.78 | 225.00 | 675.00 | 275.00 | 825.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 658 | EACH | 7.55 | 4,967.90 | 7.25 | 4,770.50 | 7.25 | 4,770.50 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 112 | LNFT | 3.66 | 409.92 | 4.00 | 448.00 | 3.50 | 392.00 | | 0059 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 298 | LNFT | 7.55 | 2,249.90 | 8.00 | 2,384.00 | 7.25 | 2,160.50 | | 0060 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 142 | LNFT | 17.13 | 2,432.46 | 17.00 | 2,414.00 | 16.25 | 2,307.50 | | 0061 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 274 | LNFT | 3.78 | 1,035.72 | 4.00 | 1,096.00 | 3.50 | 959.00 | | 0062 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.933 | MILE | 6,852.85 | 47,510.81 | 7,000.00 | 48,531.00 | 6,500.00 | 45,064.50 | | 0063 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.265 | MILE | 3,310.28 | 7,497.78 | 3,500.00 | 7,927.50 | 3,150.00 | 7,134.75 | | 0064 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 464.60 | 464.60 | 500.00 | 500.00 | 450.00 | 450.00 | | 0065 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 464.60 | 464.60 | 500.00 | 500.00 | 450.00 | 450.00 | | 0066 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,277.65 | 2,555.30 | 1,500.00 | 3,000.00 | 1,200.00 | 2,400.00 | | 0067 | 732-05-00100 | Removal of Existing Markings | 0.238 | MILE | 7,956.28 | 1,893.59 | 8,000.00 | 1,904.00 | 7,550.00 | 1,796.90 | | 0068 | 735-01-00100 | Mailboxes | 21 | EACH | 63.88 | 1,341.48 | 10.00 | 210.00 | 25.00 | 525.00 | | 0069 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 232.30 | 4,413.70 | 450.00 | 8,550.00 | 275.00 | 5,225.00 | | 0070 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 348.45 | 348.45 | 450.00 | 450.00 | 385.00 | 385.00 | | 0071 | 739-01-00100 | Hydro-Seeding | 2.74 | ACRE | 3,252.20 | 8,911.03 | 4,500.00 | 12,330.00 | 3,650.00 | 10,001.00 | | 0072 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,250.00 | 11,250.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0073 | 811-01-00100 | Cleaning and Painting (EXISTING BRIDGE RAIL) | 1,600 | LUMP | 90,300.00 | 90,300.00 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | | 0074 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 31,314 | SQYD | 7.55 | 236,420.70 | 8.50 | 266,169.00 | 7.50 | 234,855.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 124 | LNFT | 3.61 | 447.64 | 3.50 | 434.00 | 5.00 | 620.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,156,027.61 | | 3,564,210.32 | | 4,385,369.23 |
|