Proposal:H.014879.6
Parish:Avoyelles
Routes:LA 1196
Description:LA 1196: LA 115 - VICK RD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,830,868.50
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $4,471,726.06 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,906,163.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" EQUIV. CMPA) | 226 | LNFT | 30.00 | 6,780.00 | 22.00 | 4,972.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 655 | CUYD | 70.00 | 45,850.00 | 35.00 | 22,925.00 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,181 | CUYD | 50.00 | 109,050.00 | 130.00 | 283,530.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 22,874.5 | TON | 125.00 | 2,859,312.50 | 130.00 | 2,973,685.00 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,299.6 | TON | 125.00 | 287,450.00 | 130.00 | 298,948.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 109,416 | SQYD | 2.50 | 273,540.00 | 2.00 | 218,832.00 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,290 | CUYD | 1.00 | -2,290.00 | 1.00 | -2,290.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,001 | SQYD | 149.00 | 149,149.00 | 160.00 | 160,160.00 | | 0009 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 248 | LNFT | 500.00 | 124,000.00 | 312.00 | 77,376.00 | | 0010 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 226 | LNFT | 25.00 | 5,650.00 | 20.00 | 4,520.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.032 | MILE | 240.00 | 6,007.68 | 154.00 | 3,854.93 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 16.94 | MILE | 1.00 | 16.94 | 655.00 | 11,095.70 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 73.343 | MILE | 1.00 | 73.34 | 1,000.00 | 73,343.00 | | 0015 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 16.688 | MILE | 1,000.00 | 16,688.00 | 915.00 | 15,269.52 | | 0016 | 726-01-00100 | Bedding Material | 53.6 | CUYD | 100.00 | 5,360.00 | 190.00 | 10,184.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 322,500.00 | 322,500.00 | 430,000.00 | 430,000.00 | | 0018 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 80.00 | 800.00 | 110.00 | 1,100.00 | | 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,460 | EACH | 7.00 | 10,220.00 | 7.00 | 10,220.00 | | 0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 16 | LNFT | 21.00 | 336.00 | 20.00 | 320.00 | | 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 24.448 | MILE | 6,000.00 | 146,688.00 | 5,900.00 | 144,243.20 | | 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.647 | MILE | 2,800.00 | 15,811.60 | 2,800.00 | 15,811.60 | | 0023 | 735-01-00100 | Mailboxes | 53 | EACH | 25.00 | 1,325.00 | 25.00 | 1,325.00 | | 0024 | 735-02-00100 | Mailbox Supports (Single) | 49 | EACH | 205.00 | 10,045.00 | 200.00 | 9,800.00 | | 0025 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 260.00 | 520.00 | 250.00 | 500.00 | | 0026 | 739-01-00100 | Hydro-Seeding | 8.09 | ACRE | 2,700.00 | 21,843.00 | 2,650.00 | 21,438.50 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 55,000.00 | 55,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,471,726.06 | | 4,906,163.45 |
|