Proposal:H.014560.6
Parish:Lafayette, St. Martin
Routes:LA 94
Description:LA 94: VERMILION RIVER BRIDGE REPL.
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, ASPHALT CONCRETE ROADWAY, PRECAST CONCRETE PILES (24”), SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$5,760,865.40
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $6,908,173.20 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $7,146,435.40 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $8,521,679.80 |
| 4 | 55950 | Brown Industrial Construction, LLC | $8,748,332.96 |
| 5 | 49239 | WL Bass Construction Inc. | $9,675,548.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 500,000.00 | 500,000.00 | 600,000.00 | 600,000.00 | 800,000.00 | 800,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 246 | SQYD | 20.00 | 4,920.00 | 17.00 | 4,182.00 | 14.00 | 3,444.00 | 19.00 | 4,674.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 233.3 | SQYD | 15.00 | 3,499.50 | 9.00 | 2,099.70 | 15.00 | 3,499.50 | 17.00 | 3,966.10 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 64.5 | SQYD | 15.00 | 967.50 | 60.00 | 3,870.00 | 50.00 | 3,225.00 | 16.00 | 1,032.00 | | 0006 | 202-02-03020 | Removal of Base – (Base Type) PCC | 237.8 | SQYD | 20.00 | 4,756.00 | 18.00 | 4,280.40 | 35.00 | 8,323.00 | 22.00 | 5,231.60 | | 0007 | 202-02-04501 | Removal of Bridge Approach Slabs,Concrete Piles, Concrete Caps, Concrete Deck Girder Superstructure, Guardrail, Attenuator | 1 | LUMP | 525,000.00 | 525,000.00 | 250,000.00 | 250,000.00 | 500,000.00 | 500,000.00 | 600,000.00 | 600,000.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 320 | SQYD | 20.00 | 6,400.00 | 19.00 | 6,080.00 | 15.00 | 4,800.00 | 16.00 | 5,120.00 | | 0009 | 202-02-38220 | Removal of Sign Supports | 11 | EACH | 50.00 | 550.00 | 52.00 | 572.00 | 50.00 | 550.00 | 50.00 | 550.00 | | 0010 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 35.00 | 19,250.00 | 40.00 | 22,000.00 | 48.00 | 26,400.00 | 20.00 | 11,000.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 91 | EACH | 20.00 | 1,820.00 | 60.00 | 5,460.00 | 55.00 | 5,005.00 | 35.00 | 3,185.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 200.00 | 1,800.00 | 180.00 | 1,620.00 | 175.00 | 1,575.00 | 175.00 | 1,575.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 1,041 | LNFT | 3.60 | 3,747.60 | 3.00 | 3,123.00 | 6.00 | 6,246.00 | 2.50 | 2,602.50 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 8 | CUYD | 215.00 | 1,720.00 | 250.00 | 2,000.00 | 600.00 | 4,800.00 | 250.00 | 2,000.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 59.6 | CUYD | 215.00 | 12,814.00 | 135.00 | 8,046.00 | 200.00 | 11,920.00 | 220.00 | 13,112.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 344.5 | TON | 290.00 | 99,905.00 | 275.00 | 94,737.50 | 250.00 | 86,125.00 | 230.00 | 79,235.00 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 91.4 | TON | 380.00 | 34,732.00 | 350.00 | 31,990.00 | 325.00 | 29,705.00 | 285.00 | 26,049.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 1,958 | SQYD | 20.00 | 39,160.00 | 20.00 | 39,160.00 | 18.00 | 35,244.00 | 17.00 | 33,286.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -108 | CUYD | 0.10 | -10.80 | 1.00 | -108.00 | 0.10 | -10.80 | 0.01 | -1.08 | | 0021 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 118 | SQYD | 275.00 | 32,450.00 | 265.00 | 31,270.00 | 250.00 | 29,500.00 | 240.00 | 28,320.00 | | 0022 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 16 | LNFT | 180.00 | 2,880.00 | 200.00 | 3,200.00 | 300.00 | 4,800.00 | 135.00 | 2,160.00 | | 0023 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 196 | LNFT | 190.00 | 37,240.00 | 200.00 | 39,200.00 | 300.00 | 58,800.00 | 120.00 | 23,520.00 | | 0024 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 73 | LNFT | 200.00 | 14,600.00 | 280.00 | 20,440.00 | 400.00 | 29,200.00 | 195.00 | 14,235.00 | | 0025 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 60 | LNFT | 200.00 | 12,000.00 | 210.00 | 12,600.00 | 300.00 | 18,000.00 | 145.00 | 8,700.00 | | 0026 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 64 | LNFT | 235.00 | 15,040.00 | 290.00 | 18,560.00 | 400.00 | 25,600.00 | 198.00 | 12,672.00 | | 0027 | 701-14-00100 | Cleaning Existing Pipes | 168 | LNFT | 15.00 | 2,520.00 | 70.00 | 11,760.00 | 28.00 | 4,704.00 | 30.00 | 5,040.00 | | 0028 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,500.00 | 4,500.00 | 3,000.00 | 9,000.00 | 2,400.00 | 7,200.00 | 1,200.00 | 3,600.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 427 | LNFT | 10.00 | 4,270.00 | 12.00 | 5,124.00 | 2.00 | 854.00 | 5.00 | 2,135.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 7,500.00 | 45,000.00 | 10,000.00 | 60,000.00 | 8,000.00 | 48,000.00 | 4,400.00 | 26,400.00 | | 0031 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 7,000.00 | 7,000.00 | 6,500.00 | 6,500.00 | 12,000.00 | 12,000.00 | 4,000.00 | 4,000.00 | | 0032 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 15,000.00 | 15,000.00 | 17,000.00 | 17,000.00 | 12,000.00 | 12,000.00 | 12,500.00 | 12,500.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 36.00 | 2,250.00 | 36.00 | 2,250.00 | 35.00 | 2,187.50 | 35.00 | 2,187.50 | | 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 140.00 | 10,500.00 | 127.00 | 9,525.00 | 125.00 | 9,375.00 | 125.00 | 9,375.00 | | 0035 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,500.00 | 10,500.00 | 3,300.00 | 9,900.00 | 3,200.00 | 9,600.00 | 3,200.00 | 9,600.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 316.3 | SQYD | 90.00 | 28,467.00 | 100.00 | 31,630.00 | 110.00 | 34,793.00 | 75.00 | 23,722.50 | | 0037 | 706-02-00300 | Concrete Drive (8" Thick) | 194.6 | SQYD | 105.00 | 20,433.00 | 110.00 | 21,406.00 | 138.00 | 26,854.80 | 90.00 | 17,514.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 5 | EACH | 700.00 | 3,500.00 | 625.00 | 3,125.00 | 600.00 | 3,000.00 | 600.00 | 3,000.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 5 | EACH | 350.00 | 1,750.00 | 325.00 | 1,625.00 | 300.00 | 1,500.00 | 300.00 | 1,500.00 | | 0040 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,101 | SQYD | 100.00 | 110,100.00 | 120.00 | 132,120.00 | 143.00 | 157,443.00 | 88.00 | 96,888.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 1,472 | SQYD | 4.00 | 5,888.00 | 5.00 | 7,360.00 | 6.00 | 8,832.00 | 3.00 | 4,416.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | 350,000.00 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.847 | MILE | 1,400.00 | 1,185.80 | 1,600.00 | 1,355.20 | 1,200.00 | 1,016.40 | 3,520.00 | 2,981.44 | | 0044 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 56 | EACH | 10.00 | 560.00 | 7.00 | 392.00 | 8.00 | 448.00 | 10.00 | 560.00 | | 0045 | 716-01-00100 | Mulch (Vegetative) | 2.2 | TON | 1,800.00 | 3,960.00 | 1,600.00 | 3,520.00 | 1,500.00 | 3,300.00 | 1,500.00 | 3,300.00 | | 0046 | 717-01-00100 | Seeding | 88 | LB | 30.00 | 2,640.00 | 26.00 | 2,288.00 | 25.00 | 2,200.00 | 25.00 | 2,200.00 | | 0047 | 718-01-00100 | Fertilizer | 1,100 | LB | 0.80 | 880.00 | 0.70 | 770.00 | 1.00 | 1,100.00 | 0.65 | 715.00 | | 0048 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 154 | SQYD | 3.00 | 462.00 | 2.25 | 346.50 | 2.00 | 308.00 | 2.00 | 308.00 | | 0049 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | | 0050 | 725-01-00100 | Temporary Detour Roads | 2,058.6 | SQYD | 150.00 | 308,790.00 | 240.00 | 494,064.00 | 181.00 | 372,606.60 | 170.00 | 349,962.00 | | 0051 | 726-01-00100 | Bedding Material | 50.3 | CUYD | 200.00 | 10,060.00 | 200.00 | 10,060.00 | 200.00 | 10,060.00 | 190.00 | 9,557.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 680,000.00 | 680,000.00 | 714,000.00 | 714,000.00 | 850,000.00 | 850,000.00 | 870,000.00 | 870,000.00 | | 0053 | 729-01-00100 | Sign (Type A) | 9 | SQFT | 40.00 | 360.00 | 36.00 | 324.00 | 35.00 | 315.00 | 34.00 | 306.00 | | 0054 | 729-01-00103 | Sign (Type A)(Relocate) | 38.8 | SQFT | 35.00 | 1,358.00 | 32.00 | 1,241.60 | 30.00 | 1,164.00 | 30.00 | 1,164.00 | | 0055 | 729-04-00103 | Sign (Type D)(Relocate) | 40.5 | SQFT | 45.00 | 1,822.50 | 37.00 | 1,498.50 | 35.00 | 1,417.50 | 35.00 | 1,417.50 | | 0056 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 12,000.00 | 24,000.00 | 12,000.00 | 24,000.00 | 12,000.00 | 24,000.00 | 11,500.00 | 23,000.00 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 100.00 | 400.00 | 90.00 | 360.00 | 90.00 | 360.00 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 12 | EACH | 330.00 | 3,960.00 | 280.00 | 3,360.00 | 270.00 | 3,240.00 | 270.00 | 3,240.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 10.00 | 470.00 | 8.00 | 376.00 | 8.00 | 376.00 | 10.00 | 470.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.778 | MILE | 6,700.00 | 5,212.60 | 8,000.00 | 6,224.00 | 5,500.00 | 4,279.00 | 7,600.00 | 5,912.80 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 1,500.00 | 103.50 | 3,100.00 | 213.90 | 1,700.00 | 117.30 | 3,300.00 | 227.70 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.09 | MILE | 12,000.00 | 1,080.00 | 10,000.00 | 900.00 | 10,000.00 | 900.00 | 50,000.00 | 4,500.00 | | 0063 | 735-01-00100 | Mailboxes | 7 | EACH | 100.00 | 700.00 | 60.00 | 420.00 | 55.00 | 385.00 | 20.00 | 140.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 325.00 | 2,275.00 | 255.00 | 1,785.00 | 250.00 | 1,750.00 | 250.00 | 1,750.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 202,000.00 | 202,000.00 | 200,000.00 | 200,000.00 | 350,000.00 | 350,000.00 | | 0066 | 804-01-00600 | Precast Concrete Piles (24") | 3,800 | LNFT | 290.00 | 1,102,000.00 | 230.00 | 874,000.00 | 240.00 | 912,000.00 | 220.00 | 836,000.00 | | 0067 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | | 0069 | 804-09-00600 | Static Load Test (Precast Concrete Piles (24")) | 1 | EACH | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 | | 0070 | 804-14-00100 | Dynamic Monitoring Assistance | 10 | EACH | 2,500.00 | 25,000.00 | 6,500.00 | 65,000.00 | 2,000.00 | 20,000.00 | 4,500.00 | 45,000.00 | | 0071 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 35,000.00 | 35,000.00 | 150,000.00 | 150,000.00 | 23,500.00 | 23,500.00 | 24,000.00 | 24,000.00 | | 0072 | 804-18-00100 | Vibration Monitoring | 10 | DAY | 1,200.00 | 12,000.00 | 1,000.00 | 10,000.00 | 1,000.00 | 10,000.00 | 1,800.00 | 18,000.00 | | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 357.3 | CUYD | 1,600.00 | 571,680.00 | 1,400.00 | 500,220.00 | 3,000.00 | 1,071,900.00 | 1,500.00 | 535,950.00 | | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 130 | CUYD | 1,800.00 | 234,000.00 | 2,900.00 | 377,000.00 | 4,000.00 | 520,000.00 | 2,900.00 | 377,000.00 | | 0075 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,401 | SQFT | 3.00 | 7,203.00 | 2.50 | 6,002.50 | 2.00 | 4,802.00 | 2.20 | 5,282.20 | | 0076 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 9,548 | SQFT | 3.00 | 28,644.00 | 5.50 | 52,514.00 | 3.00 | 28,644.00 | 2.80 | 26,734.40 | | 0077 | 806-01-00100 | Deformed Reinforcing Steel | 93,384 | LB | 3.50 | 326,844.00 | 1.40 | 130,737.60 | 2.00 | 186,768.00 | 1.70 | 158,752.80 | | 0078 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 175.00 | 63,000.00 | 230.00 | 82,800.00 | 185.00 | 66,600.00 | 250.00 | 90,000.00 | | 0079 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,600 | SQFT | 115.00 | 184,000.00 | 130.00 | 208,000.00 | 130.00 | 208,000.00 | 140.00 | 224,000.00 | | 0080 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 288 | SFIN | 190.00 | 54,720.00 | 100.00 | 28,800.00 | 135.00 | 38,880.00 | 140.00 | 40,320.00 | | 0081 | 815-03-00300 | Joint Seal (Poured) | 414 | LNFT | 31.00 | 12,834.00 | 28.00 | 11,592.00 | 21.00 | 8,694.00 | 18.00 | 7,452.00 | | 0082 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 4,800 | SQFT | 265.00 | 1,272,000.00 | 200.00 | 960,000.00 | 210.00 | 1,008,000.00 | 365.00 | 1,752,000.00 | | 0083 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 246 | LNFT | 16.00 | 3,936.00 | 15.00 | 3,690.00 | 3.00 | 738.00 | 20.00 | 4,920.00 | | 0084 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 248 | LNFT | 4.00 | 992.00 | 16.00 | 3,968.00 | 3.00 | 744.00 | 6.00 | 1,488.00 | | 0085 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 686 | INLF | 1.00 | 686.00 | 5.00 | 3,430.00 | 1.00 | 686.00 | 1.00 | 686.00 | | 0086 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,476 | INLF | 1.50 | 2,214.00 | 5.00 | 7,380.00 | 1.00 | 1,476.00 | 2.00 | 2,952.00 | | 0087 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 811 | INLF | 2.00 | 1,622.00 | 5.00 | 4,055.00 | 1.00 | 811.00 | 2.00 | 1,622.00 | | 0088 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 60,000.00 | 60,000.00 | | 0089 | 804-09-00200 | Static Load Test (Precast Concrete Piles (14")) | 1 | EACH | 85,000.00 | 85,000.00 | 90,000.00 | 90,000.00 | 120,000.00 | 120,000.00 | 30,000.00 | 30,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,908,173.20 | | 7,146,435.40 | | 8,521,679.80 | | 8,748,332.96 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 246 | SQYD | 18.00 | 4,428.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 233.3 | SQYD | 15.00 | 3,499.50 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 64.5 | SQYD | 45.00 | 2,902.50 | | 0006 | 202-02-03020 | Removal of Base – (Base Type) PCC | 237.8 | SQYD | 32.00 | 7,609.60 | | 0007 | 202-02-04501 | Removal of Bridge Approach Slabs,Concrete Piles, Concrete Caps, Concrete Deck Girder Superstructure, Guardrail, Attenuator | 1 | LUMP | 400,000.00 | 400,000.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 320 | SQYD | 13.00 | 4,160.00 | | 0009 | 202-02-38220 | Removal of Sign Supports | 11 | EACH | 50.00 | 550.00 | | 0010 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 63.00 | 34,650.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | | 0012 | 204-02-00100 | Temporary Hay Bales | 91 | EACH | 26.00 | 2,366.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 202.00 | 1,818.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 1,041 | LNFT | 5.50 | 5,725.50 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 8 | CUYD | 255.00 | 2,040.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 59.6 | CUYD | 147.00 | 8,761.20 | | 0017 | 502-01-00100 | Asphalt Concrete | 344.5 | TON | 230.00 | 79,235.00 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 91.4 | TON | 285.00 | 26,049.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 1,958 | SQYD | 38.00 | 74,404.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -108 | CUYD | 1.00 | -108.00 | | 0021 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 118 | SQYD | 680.00 | 80,240.00 | | 0022 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 16 | LNFT | 250.00 | 4,000.00 | | 0023 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 196 | LNFT | 160.00 | 31,360.00 | | 0024 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 73 | LNFT | 400.00 | 29,200.00 | | 0025 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 60 | LNFT | 290.00 | 17,400.00 | | 0026 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 64 | LNFT | 220.00 | 14,080.00 | | 0027 | 701-14-00100 | Cleaning Existing Pipes | 168 | LNFT | 150.00 | 25,200.00 | | 0028 | 701-15-00100 | Concrete Collar | 3 | EACH | 3,200.00 | 9,600.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 427 | LNFT | 60.00 | 25,620.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 15,000.00 | 90,000.00 | | 0031 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 12,000.00 | 12,000.00 | | 0032 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 15,000.00 | 15,000.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 35.00 | 2,187.50 | | 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 125.00 | 9,375.00 | | 0035 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,200.00 | 9,600.00 | | 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 316.3 | SQYD | 200.00 | 63,260.00 | | 0037 | 706-02-00300 | Concrete Drive (8" Thick) | 194.6 | SQYD | 250.00 | 48,650.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 5 | EACH | 600.00 | 3,000.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 5 | EACH | 300.00 | 1,500.00 | | 0040 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,101 | SQYD | 121.00 | 133,221.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 1,472 | SQYD | 4.00 | 5,888.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 230,000.00 | 230,000.00 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.847 | MILE | 1,550.00 | 1,312.85 | | 0044 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 56 | EACH | 7.00 | 392.00 | | 0045 | 716-01-00100 | Mulch (Vegetative) | 2.2 | TON | 1,200.00 | 2,640.00 | | 0046 | 717-01-00100 | Seeding | 88 | LB | 25.00 | 2,200.00 | | 0047 | 718-01-00100 | Fertilizer | 1,100 | LB | 1.00 | 1,100.00 | | 0048 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 154 | SQYD | 4.00 | 616.00 | | 0049 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | | 0050 | 725-01-00100 | Temporary Detour Roads | 2,058.6 | SQYD | 425.00 | 874,905.00 | | 0051 | 726-01-00100 | Bedding Material | 50.3 | CUYD | 240.00 | 12,072.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 967,500.00 | 967,500.00 | | 0053 | 729-01-00100 | Sign (Type A) | 9 | SQFT | 35.00 | 315.00 | | 0054 | 729-01-00103 | Sign (Type A)(Relocate) | 38.8 | SQFT | 30.00 | 1,164.00 | | 0055 | 729-04-00103 | Sign (Type D)(Relocate) | 40.5 | SQFT | 35.00 | 1,417.50 | | 0056 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 2 | EACH | 11,270.00 | 22,540.00 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 12 | EACH | 270.00 | 3,240.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 7.00 | 329.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.778 | MILE | 7,950.00 | 6,185.10 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 3,500.00 | 241.50 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.09 | MILE | 9,800.00 | 882.00 | | 0063 | 735-01-00100 | Mailboxes | 7 | EACH | 20.00 | 140.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 250.00 | 1,750.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | | 0066 | 804-01-00600 | Precast Concrete Piles (24") | 3,800 | LNFT | 375.00 | 1,425,000.00 | | 0067 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 100,000.00 | 100,000.00 | | 0069 | 804-09-00600 | Static Load Test (Precast Concrete Piles (24")) | 1 | EACH | 200,000.00 | 200,000.00 | | 0070 | 804-14-00100 | Dynamic Monitoring Assistance | 10 | EACH | 2,100.00 | 21,000.00 | | 0071 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 45,000.00 | 45,000.00 | | 0072 | 804-18-00100 | Vibration Monitoring | 10 | DAY | 350.00 | 3,500.00 | | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 357.3 | CUYD | 400.00 | 142,920.00 | | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 130 | CUYD | 400.00 | 52,000.00 | | 0075 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,401 | SQFT | 4.00 | 9,604.00 | | 0076 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 9,548 | SQFT | 5.00 | 47,740.00 | | 0077 | 806-01-00100 | Deformed Reinforcing Steel | 93,384 | LB | 5.00 | 466,920.00 | | 0078 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 360 | LNFT | 250.00 | 90,000.00 | | 0079 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,600 | SQFT | 195.00 | 312,000.00 | | 0080 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 288 | SFIN | 150.00 | 43,200.00 | | 0081 | 815-03-00300 | Joint Seal (Poured) | 414 | LNFT | 15.00 | 6,210.00 | | 0082 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 4,800 | SQFT | 550.00 | 2,640,000.00 | | 0083 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 246 | LNFT | 10.00 | 2,460.00 | | 0084 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 248 | LNFT | 1.00 | 248.00 | | 0085 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 686 | INLF | 1.00 | 686.00 | | 0086 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,476 | INLF | 1.00 | 1,476.00 | | 0087 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 811 | INLF | 1.00 | 811.00 | | 0088 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 70,000.00 | 70,000.00 | | 0089 | 804-09-00200 | Static Load Test (Precast Concrete Piles (14")) | 1 | EACH | 150,000.00 | 150,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,675,548.75 |
|