Proposal:H.002264.6
Parish:Jefferson
Routes:LA 302, LA 3257, LA 45
Description:LA 302: BAYOU BARATARIA MB REPL PHASE 2
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PAVEMENT WIDENING, AND RELATED WORK.
Estimated Construction Cost:$10,893,985.85
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $7,869,881.09 |
| 2 | 36961 | Cycle Construction Co. L.L.C. | $10,064,567.59 |
| 3 | 55950 | Brown Industrial Construction, LLC | $10,257,122.07 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $12,967,860.99 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Cycle Construction Co. L.L.C. | - 3 - Brown Industrial Construction, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.44 | LUMP | 150,000.00 | 150,000.00 | 165,000.00 | 165,000.00 | 1,278,000.00 | 1,278,000.00 | 285,000.00 | 285,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 200.00 | 200.00 | 70,000.00 | 70,000.00 | 5,000.00 | 5,000.00 | 9,250.00 | 9,250.00 | | 0003 | 202-02-00010 | Removal of Temporary 4" Concrete Slab | 4 | EACH | 750.00 | 3,000.00 | 785.00 | 3,140.00 | 1,500.00 | 6,000.00 | 500.00 | 2,000.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 144 | SQYD | 20.00 | 2,880.00 | 80.00 | 11,520.00 | 55.00 | 7,920.00 | 30.00 | 4,320.00 | | 0005 | 202-02-02020 | Removal of Asphalt Pavement | 5,316.2 | SQYD | 9.00 | 47,845.80 | 11.00 | 58,478.20 | 12.00 | 63,794.40 | 9.00 | 47,845.80 | | 0006 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 5,316.2 | SQYD | 2.00 | 10,632.40 | 13.00 | 69,110.60 | 12.20 | 64,857.64 | 7.00 | 37,213.40 | | 0007 | 202-02-06020 | Removal of Concrete Box Culverts (8' x 3' x 30') | 1 | EACH | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | 4,090.00 | 4,090.00 | 8,500.00 | 8,500.00 | | 0008 | 202-02-06040 | Removal of Concrete Box Headwall (Sta. 207+25) | 2 | EACH | 5,000.00 | 10,000.00 | 2,000.00 | 4,000.00 | 1,760.00 | 3,520.00 | 4,000.00 | 8,000.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) (According to Removal of Drainage Table) | 181 | LNFT | 20.00 | 3,620.00 | 106.00 | 19,186.00 | 23.50 | 4,253.50 | 50.00 | 9,050.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (According to Removal of Drainage Table) | 15 | LNFT | 30.00 | 450.00 | 218.00 | 3,270.00 | 38.00 | 570.00 | 75.00 | 1,125.00 | | 0011 | 203-01-00100 | General Excavation (Roadway and Muck) | 5,981 | CUYD | 30.00 | 179,430.00 | 31.50 | 188,401.50 | 28.75 | 171,953.75 | 53.00 | 316,993.00 | | 0012 | 203-03-00100 | Embankment | 5,403 | CUYD | 75.00 | 405,225.00 | 61.00 | 329,583.00 | 75.50 | 407,926.50 | 160.00 | 864,480.00 | | 0013 | 203-04-00200 | Nonplastic Embankment (Sand) | 19,002 | CUYD | 40.00 | 760,080.00 | 34.00 | 646,068.00 | 60.00 | 1,140,120.00 | 79.50 | 1,510,659.00 | | 0014 | 203-04-00200 | Nonplastic Embankment (Sand) (Surcharge) | 6,264 | CUYD | 40.00 | 250,560.00 | 70.00 | 438,480.00 | 46.00 | 288,144.00 | 72.50 | 454,140.00 | | 0015 | 203-08-00100 | Geotextile Fabric | 20,765 | SQYD | 3.00 | 62,295.00 | 5.00 | 103,825.00 | 2.00 | 41,530.00 | 2.75 | 57,103.75 | | 0016 | 203-11-00100 | Settlement Plate Installation and Monitoring | 19 | EACH | 4,000.00 | 76,000.00 | 2,475.00 | 47,025.00 | 3,378.00 | 64,182.00 | 2,750.00 | 52,250.00 | | 0017 | 204-02-00100 | Temporary Hay Bales | 90 | EACH | 25.00 | 2,250.00 | 25.00 | 2,250.00 | 62.00 | 5,580.00 | 25.00 | 2,250.00 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 7,375 | LNFT | 2.00 | 14,750.00 | 4.00 | 29,500.00 | 2.25 | 16,593.75 | 4.00 | 29,500.00 | | 0019 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 10,082.7 | SQYD | 50.00 | 504,135.00 | 52.50 | 529,341.75 | 37.60 | 379,109.52 | 76.50 | 771,326.55 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 250.00 | 12,500.00 | 238.00 | 11,900.00 | 177.00 | 8,850.00 | 290.00 | 14,500.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,697.2 | TON | 171.50 | 634,069.80 | 190.00 | 702,468.00 | 193.00 | 713,559.60 | 300.00 | 1,109,160.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 868.8 | TON | 298.00 | 258,902.40 | 325.00 | 282,360.00 | 335.00 | 291,048.00 | 400.00 | 347,520.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 4,547 | SQYD | 13.00 | 59,111.00 | 14.00 | 63,658.00 | 14.50 | 65,931.50 | 15.00 | 68,205.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -252.6 | CUYD | 0.10 | -25.26 | 0.10 | -25.26 | 0.11 | -27.79 | 0.10 | -25.26 | | 0025 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 34.2 | SQYD | 250.00 | 8,550.00 | 260.00 | 8,892.00 | 281.00 | 9,610.20 | 600.00 | 20,520.00 | | 0026 | 510-02-00100 | Pavement Widening (4" Thick) | 939 | SQYD | 55.00 | 51,645.00 | 58.00 | 54,462.00 | 62.00 | 58,218.00 | 245.00 | 230,055.00 | | 0027 | 510-02-00100 | Pavement Widening (8" Thick) | 305.1 | SQYD | 96.00 | 29,289.60 | 98.00 | 29,899.80 | 108.00 | 32,950.80 | 440.00 | 134,244.00 | | 0028 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 272 | LNFT | 225.00 | 61,200.00 | 210.00 | 57,120.00 | 163.00 | 44,336.00 | 375.00 | 102,000.00 | | 0029 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 152 | LNFT | 250.00 | 38,000.00 | 310.00 | 47,120.00 | 186.00 | 28,272.00 | 450.00 | 68,400.00 | | 0030 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 197 | LNFT | 200.00 | 39,400.00 | 185.00 | 36,445.00 | 148.00 | 29,156.00 | 275.00 | 54,175.00 | | 0031 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 274 | LNFT | 180.00 | 49,320.00 | 200.00 | 54,800.00 | 133.00 | 36,442.00 | 250.00 | 68,500.00 | | 0032 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 112 | LNFT | 150.00 | 16,800.00 | 170.00 | 19,040.00 | 97.00 | 10,864.00 | 225.00 | 25,200.00 | | 0033 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 160 | LNFT | 150.00 | 24,000.00 | 200.00 | 32,000.00 | 141.00 | 22,560.00 | 225.00 | 36,000.00 | | 0034 | 701-07-00600 | Yard Drain Pipe (15") | 200 | LNFT | 60.00 | 12,000.00 | 140.00 | 28,000.00 | 99.00 | 19,800.00 | 190.00 | 38,000.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,000.00 | 6,000.00 | 9,900.00 | 9,900.00 | 3,500.00 | 3,500.00 | 12,000.00 | 12,000.00 | | 0036 | 702-03-01000 | Catch Basins (CB-2TOP02) | 1 | EACH | 12,000.00 | 12,000.00 | 14,500.00 | 14,500.00 | 11,550.00 | 11,550.00 | 20,000.00 | 20,000.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 36.00 | 1,800.00 | 36.00 | 1,800.00 | 33.00 | 1,650.00 | 45.00 | 2,250.00 | | 0038 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 150.00 | 15,000.00 | 130.00 | 13,000.00 | 140.00 | 14,000.00 | 125.00 | 12,500.00 | | 0039 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,600.00 | 14,400.00 | 3,500.00 | 14,000.00 | 3,378.00 | 13,512.00 | 4,500.00 | 18,000.00 | | 0040 | 706-01-00100 | Concrete Walk (4" Thick) | 17.4 | SQYD | 150.00 | 2,610.00 | 350.00 | 6,090.00 | 135.00 | 2,349.00 | 500.00 | 8,700.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 35 | EACH | 350.00 | 12,250.00 | 695.00 | 24,325.00 | 675.00 | 23,625.00 | 650.00 | 22,750.00 | | 0042 | 708-02-00100 | Right-of-Way Monument Witness Post | 35 | EACH | 350.00 | 12,250.00 | 230.00 | 8,050.00 | 225.00 | 7,875.00 | 200.00 | 7,000.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 350,000.00 | 350,000.00 | 101,500.00 | 101,500.00 | 250,000.00 | 250,000.00 | | 0044 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.259 | MILE | 3,600.00 | 932.40 | 6,000.00 | 1,554.00 | 3,391.00 | 878.27 | 1,900.00 | 492.10 | | 0045 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.341 | MILE | 1,200.00 | 409.20 | 1,100.00 | 375.10 | 3,368.00 | 1,148.49 | 1,900.00 | 647.90 | | 0046 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.341 | MILE | 3,000.00 | 1,023.00 | 2,800.00 | 954.80 | 5,928.00 | 2,021.45 | 3,750.00 | 1,278.75 | | 0047 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 45 | EACH | 18.00 | 810.00 | 17.00 | 765.00 | 11.00 | 495.00 | 29.00 | 1,305.00 | | 0048 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 88 | EACH | 750.00 | 66,000.00 | 1,050.00 | 92,400.00 | 990.00 | 87,120.00 | 475.00 | 41,800.00 | | 0049 | 716-01-00100 | Mulch (Vegetative) | 16.3 | TON | 800.00 | 13,040.00 | 925.00 | 15,077.50 | 957.00 | 15,599.10 | 950.00 | 15,485.00 | | 0050 | 717-01-00100 | Seeding | 279 | LB | 35.00 | 9,765.00 | 30.00 | 8,370.00 | 33.00 | 9,207.00 | 30.00 | 8,370.00 | | 0051 | 718-01-00100 | Fertilizer | 9,305 | LB | 1.50 | 13,957.50 | 1.00 | 9,305.00 | 0.85 | 7,909.25 | 1.00 | 9,305.00 | | 0052 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | 69,700.00 | 69,700.00 | 115,000.00 | 115,000.00 | | 0053 | 726-01-00100 | Bedding Material | 105.1 | CUYD | 140.00 | 14,714.00 | 120.00 | 12,612.00 | 144.00 | 15,134.40 | 200.00 | 21,020.00 | | 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 765,000.00 | 765,000.00 | 1,650,000.00 | 1,650,000.00 | 1,021,000.00 | 1,021,000.00 | 957,500.00 | 957,500.00 | | 0055 | 729-01-00100 | Sign (Type A) | 54 | SQFT | 30.00 | 1,620.00 | 28.00 | 1,512.00 | 22.00 | 1,188.00 | 37.00 | 1,998.00 | | 0056 | 729-02-00100 | Sign (Type B) | 70 | SQFT | 42.00 | 2,940.00 | 28.00 | 1,960.00 | 28.00 | 1,960.00 | 37.00 | 2,590.00 | | 0057 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 115.00 | 690.00 | 115.00 | 690.00 | 85.00 | 510.00 | 150.00 | 900.00 | | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 210.00 | 840.00 | 115.00 | 460.00 | 106.00 | 424.00 | 105.00 | 420.00 | | 0059 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 22 | EACH | 400.00 | 8,800.00 | 220.00 | 4,840.00 | 225.00 | 4,950.00 | 225.00 | 4,950.00 | | 0060 | 731-02-00100 | Reflectorized Raised Pavement Markers | 157 | EACH | 12.00 | 1,884.00 | 11.00 | 1,727.00 | 11.20 | 1,758.40 | 20.00 | 3,140.00 | | 0061 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 45 | LNFT | 24.00 | 1,080.00 | 23.00 | 1,035.00 | 16.90 | 760.50 | 38.00 | 1,710.00 | | 0062 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.368 | MILE | 7,800.00 | 18,470.40 | 7,500.00 | 17,760.00 | 5,950.00 | 14,089.60 | 12,750.00 | 30,192.00 | | 0063 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.653 | MILE | 2,400.00 | 1,567.20 | 2,300.00 | 1,501.90 | 3,363.00 | 2,196.04 | 3,750.00 | 2,448.75 | | 0064 | 735-01-00100 | Mailboxes | 2 | EACH | 100.00 | 200.00 | 23.00 | 46.00 | 56.00 | 112.00 | 100.00 | 200.00 | | 0065 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 289.00 | 578.00 | 168.00 | 336.00 | 200.00 | 400.00 | | 0066 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | 170,000.00 | 170,000.00 | 216,100.00 | 216,100.00 | 250,000.00 | 250,000.00 | | 0067 | 802-03-00500 | Temporary Sheeting (PZ 35) | 37,000 | SQFT | 40.00 | 1,480,000.00 | 47.00 | 1,739,000.00 | 50.00 | 1,850,000.00 | 66.50 | 2,460,500.00 | | 0068 | 805-01-01000 | Class A1 Concrete (Headwalls) (3'-0" x 18'-11") | 3.93 | CUYD | 7,500.00 | 29,475.00 | 14,000.00 | 55,020.00 | 2,027.00 | 7,966.11 | 4,500.00 | 17,685.00 | | 0069 | 805-01-01000 | Class A1 Concrete (Headwalls) (3'-5" x 22'-1") | 4.93 | CUYD | 7,500.00 | 36,975.00 | 14,000.00 | 69,020.00 | 2,027.00 | 9,993.11 | 4,750.00 | 23,417.50 | | 0070 | 806-01-00100 | Deformed Reinforcing Steel | 498 | LB | 10.00 | 4,980.00 | 6.00 | 2,988.00 | 5.20 | 2,589.60 | 2.00 | 996.00 | | 0071 | 807-01-00800 | Structural Metalwork (Bollards) | 1,075 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | 12,500.00 | 12,500.00 | | 0072 | NS-203-00014 | Wick Drains | 678,022 | LNFT | 0.45 | 305,109.90 | 0.45 | 305,109.90 | 0.50 | 339,011.00 | 0.70 | 474,615.40 | | 0073 | NS-300-00060 | Geogrid | 10,082.7 | SQYD | 5.00 | 50,413.50 | 4.00 | 40,330.80 | 1.90 | 19,157.13 | 3.00 | 30,248.10 | | 0074 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 216 | LNFT | 20.00 | 4,320.00 | 17.00 | 3,672.00 | 11.25 | 2,430.00 | 10.00 | 2,160.00 | | 0075 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 144 | LNFT | 12.00 | 1,728.00 | 12.00 | 1,728.00 | 9.00 | 1,296.00 | 10.00 | 1,440.00 | | 0076 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 101 | TON | 200.00 | 20,200.00 | 232.00 | 23,432.00 | 225.00 | 22,725.00 | 575.00 | 58,075.00 | | 0077 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 20,415 | INLF | 0.75 | 15,311.25 | 1.00 | 20,415.00 | 0.55 | 11,228.25 | 0.75 | 15,311.25 | | 0078 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 10,000.00 | 20,000.00 | 11,000.00 | 22,000.00 | 12,100.00 | 24,200.00 | 9,950.00 | 19,900.00 | | 0079 | TS-741-00100 | Fire Hydrant Assembly | 5 | EACH | 10,000.00 | 50,000.00 | 11,500.00 | 57,500.00 | 16,900.00 | 84,500.00 | 17,500.00 | 87,500.00 | | 0080 | TS-741-01100 | Water Main (8" PVC) (PVC/C-900 Pipe) | 175 | LNFT | 120.00 | 21,000.00 | 375.00 | 65,625.00 | 260.00 | 45,500.00 | 400.00 | 70,000.00 | | 0081 | TS-741-01120 | Water Main (14") (PVC/C-900 Pipe) | 202 | LNFT | 150.00 | 30,300.00 | 421.00 | 85,042.00 | 225.00 | 45,450.00 | 500.00 | 101,000.00 | | 0082 | TS-741-02090 | Water Main (14") (Ductile Iron Pipe) | 50 | LF | 250.00 | 12,500.00 | 625.00 | 31,250.00 | 305.00 | 15,250.00 | 570.00 | 28,500.00 | | 0083 | TS-741-02091 | Water Main (16") (HDPE Pipe SDR 17) | 2,416 | LF | 150.00 | 362,400.00 | 308.00 | 744,128.00 | 289.00 | 698,224.00 | 325.00 | 785,200.00 | | 0084 | TS-741-11201 | Ductile Iron Fittings | 1,000 | LB | 20.00 | 20,000.00 | 12.00 | 12,000.00 | 22.00 | 22,000.00 | 25.00 | 25,000.00 | | 0085 | TS-741-60058 | Gate Valve and Valve Box (8") | 4 | EACH | 2,500.00 | 10,000.00 | 5,900.00 | 23,600.00 | 3,941.00 | 15,764.00 | 5,750.00 | 23,000.00 | | 0086 | TS-741-60059 | Butterfly Valve and Valve Box (14") | 2 | EACH | 6,500.00 | 13,000.00 | 9,800.00 | 19,600.00 | 9,234.00 | 18,468.00 | 25,000.00 | 50,000.00 | | 0087 | TS-741-70103 | Removal and Disposal of Existing AC Waterline (14") | 60 | LNFT | 300.00 | 18,000.00 | 345.00 | 20,700.00 | 112.00 | 6,720.00 | 200.00 | 12,000.00 | | 0088 | TS-741-70112 | Pipe Restraints (8") | 12 | EACH | 750.00 | 9,000.00 | 550.00 | 6,600.00 | 225.00 | 2,700.00 | 1,000.00 | 12,000.00 | | 0089 | TS-741-70115 | Pipe Restraints (14") | 14 | EACH | 1,250.00 | 17,500.00 | 1,100.00 | 15,400.00 | 675.00 | 9,450.00 | 1,500.00 | 21,000.00 | | 0090 | TS-741-70122 | Transitional Coupling (8") | 2 | EACH | 3,500.00 | 7,000.00 | 1,900.00 | 3,800.00 | 563.00 | 1,126.00 | 1,250.00 | 2,500.00 | | 0091 | TS-741-70125 | Transitional Coupling (14") | 2 | EACH | 8,000.00 | 16,000.00 | 4,350.00 | 8,700.00 | 2,250.00 | 4,500.00 | 3,750.00 | 7,500.00 | | 0092 | TS-741-70126 | Transitional Couplings HDPE to PVC (16"x14") | 4 | EACH | 4,000.00 | 16,000.00 | 6,100.00 | 24,400.00 | 2,250.00 | 9,000.00 | 3,500.00 | 14,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,869,881.09 | | 10,064,567.59 | | 10,257,122.07 | | 12,967,860.99 |
|