Proposal:H.015486.6
Parish:Evangeline
Routes:LA 3096
Description:LA 3096: JUNCTION ROAD - US 167
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,342,358.90
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $2,427,113.60 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,530,500.46 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,121,229.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 7,200.00 | 7,200.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-00010 | Removal of Cattle Guard | 1 | EACH | 2,000.00 | 2,000.00 | 1,100.00 | 1,100.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 157 | SQYD | 60.00 | 9,420.00 | 65.00 | 10,205.00 | 55.00 | 8,635.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 272 | SQYD | 25.00 | 6,800.00 | 30.00 | 8,160.00 | 65.00 | 17,680.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (18" - 36")(CMP/RCP) | 133 | LNFT | 25.00 | 3,325.00 | 20.00 | 2,660.00 | 60.00 | 7,980.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" PP) | 21 | LNFT | 25.00 | 525.00 | 20.00 | 420.00 | 50.00 | 1,050.00 | | 0007 | 202-02-38200 | Removal of Signs | 26 | EACH | 30.00 | 780.00 | 25.00 | 650.00 | 25.00 | 650.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 60,000.00 | 60,000.00 | 70,000.00 | 70,000.00 | 125,000.00 | 125,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 52 | EACH | 175.00 | 9,100.00 | 155.00 | 8,060.00 | 200.00 | 10,400.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 510 | SQYD | 10.00 | 5,100.00 | 5.00 | 2,550.00 | 40.00 | 20,400.00 | | 0011 | 303-03-00300 | In-Place Cement Treated Base Course (10" Thick) | 30,726.2 | SQYD | 13.00 | 399,440.60 | 14.00 | 430,166.80 | 10.00 | 307,262.00 | | 0012 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 30,727 | SQYD | 10.00 | 307,270.00 | 11.00 | 337,997.00 | 16.00 | 491,632.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 362 | CUYD | 72.00 | 26,064.00 | 110.00 | 39,820.00 | 120.00 | 43,440.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 75.00 | 7,500.00 | 50.00 | 5,000.00 | 100.00 | 10,000.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 5,885.4 | TON | 119.00 | 700,362.60 | 125.00 | 735,675.00 | 150.00 | 882,810.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 459 | TON | 170.00 | 78,030.00 | 220.00 | 100,980.00 | 150.00 | 68,850.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 26,143 | SQYD | 2.30 | 60,128.90 | 2.50 | 65,357.50 | 4.00 | 104,572.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,165 | CUYD | 0.01 | -11.65 | 1.00 | -1,165.00 | 1.00 | -1,165.00 | | 0019 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 218 | SQYD | 95.00 | 20,710.00 | 109.00 | 23,762.00 | 225.00 | 49,050.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 22 | SQYD | 210.00 | 4,620.00 | 600.00 | 13,200.00 | 350.00 | 7,700.00 | | 0021 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 46 | LNFT | 450.00 | 20,700.00 | 300.00 | 13,800.00 | 425.00 | 19,550.00 | | 0022 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 96 | LNFT | 465.00 | 44,640.00 | 315.00 | 30,240.00 | 450.00 | 43,200.00 | | 0023 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 93 | LNFT | 335.00 | 31,155.00 | 180.00 | 16,740.00 | 425.00 | 39,525.00 | | 0024 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 4 | LNFT | 300.00 | 1,200.00 | 355.00 | 1,420.00 | 1,500.00 | 6,000.00 | | 0025 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 20 | LNFT | 375.00 | 7,500.00 | 360.00 | 7,200.00 | 1,500.00 | 30,000.00 | | 0026 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 4 | LNFT | 450.00 | 1,800.00 | 400.00 | 1,600.00 | 1,600.00 | 6,400.00 | | 0027 | 701-10-01160 | Reinforced Concrete Pipe (Extension) (54") | 12 | LNFT | 1,050.00 | 12,600.00 | 455.00 | 5,460.00 | 1,600.00 | 19,200.00 | | 0028 | 701-15-00100 | Concrete Collar | 14 | EACH | 2,250.00 | 31,500.00 | 2,200.00 | 30,800.00 | 4,000.00 | 56,000.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 238 | LNFT | 5.00 | 1,190.00 | 15.00 | 3,570.00 | 35.00 | 8,330.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) (Cast-In-Place) | 3 | EACH | 7,500.00 | 22,500.00 | 11,000.00 | 33,000.00 | 17,000.00 | 51,000.00 | | 0031 | 702-03-00200 | Catch Basins (CB-02) (Cast-In-Place) | 1 | EACH | 9,000.00 | 9,000.00 | 11,000.00 | 11,000.00 | 17,000.00 | 17,000.00 | | 0032 | 706-02-00200 | Concrete Drive (6" Thick) | 272 | SQYD | 165.00 | 44,880.00 | 200.00 | 54,400.00 | 150.00 | 40,800.00 | | 0033 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 49 | SQYD | 165.00 | 8,085.00 | 180.00 | 8,820.00 | 300.00 | 14,700.00 | | 0034 | 711-04-00100 | Geotextile Fabric | 49 | SQYD | 6.00 | 294.00 | 10.00 | 490.00 | 10.00 | 490.00 | | 0035 | 712-02-00100 | Sacked Concrete Revetment | 21 | SQYD | 600.00 | 12,600.00 | 200.00 | 4,200.00 | 1,200.00 | 25,200.00 | | 0036 | 712-04-00100 | Flexible Revetment | 42 | SQYD | 150.00 | 6,300.00 | 180.00 | 7,560.00 | 300.00 | 12,600.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 115,000.00 | 115,000.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | 0038 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.657 | MILE | 550.00 | 4,211.35 | 154.00 | 1,179.18 | 500.00 | 3,828.50 | | 0039 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.456 | MILE | 725.00 | 4,680.60 | 630.00 | 4,067.28 | 800.00 | 5,164.80 | | 0040 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.49 | MILE | 1,500.00 | 30,735.00 | 1,300.00 | 26,637.00 | 1,300.00 | 26,637.00 | | 0041 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | | 0042 | 726-01-00100 | Bedding Material | 17.8 | CUYD | 150.00 | 2,670.00 | 180.00 | 3,204.00 | 250.00 | 4,450.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 185,000.00 | 185,000.00 | 250,000.00 | 250,000.00 | 310,000.00 | 310,000.00 | | 0044 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 149.94 | SQFT | 55.00 | 8,246.70 | 45.00 | 6,747.30 | 35.00 | 5,247.90 | | 0045 | 729-16-00200 | Object Marker Assembly (Type 2) | 28 | EACH | 75.00 | 2,100.00 | 65.00 | 1,820.00 | 62.00 | 1,736.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 150.00 | 300.00 | 125.00 | 250.00 | 97.00 | 194.00 | | 0047 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 200.00 | 3,600.00 | 180.00 | 3,240.00 | 265.00 | 4,770.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 380 | EACH | 10.00 | 3,800.00 | 9.00 | 3,420.00 | 7.00 | 2,660.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.83 | MILE | 7,750.00 | 52,932.50 | 6,500.00 | 44,395.00 | 5,400.00 | 36,882.00 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.152 | MILE | 3,500.00 | 7,532.00 | 3,100.00 | 6,671.20 | 2,500.00 | 5,380.00 | | 0051 | 735-01-00100 | Mailboxes | 53 | EACH | 10.00 | 530.00 | 1.00 | 53.00 | 30.00 | 1,590.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 53 | EACH | 325.00 | 17,225.00 | 275.00 | 14,575.00 | 205.00 | 10,865.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 1.23 | ACRE | 3,500.00 | 4,305.00 | 3,200.00 | 3,936.00 | 2,900.00 | 3,567.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 3,500.00 | 3,500.00 | 25,000.00 | 25,000.00 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,064 | INLF | 1.75 | 1,862.00 | 1.50 | 1,596.00 | 4.00 | 4,256.00 | | 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 510 | INLF | 2.50 | 1,275.00 | 5.12 | 2,611.20 | 6.00 | 3,060.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,427,113.60 | | 2,530,500.46 | | 3,121,229.20 |
|