Proposal:H.015424.6
Parish:East Baton Rouge
Routes:LA 67
Description:LA 67: PLANK RD. @ AIRLINE - GIRDER REP.
Type Construction:BRIDGE REPAIR AND RELATED WORK
Estimated Construction Cost:$1,671,209.50
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $2,085,474.50 |
| 2 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $2,729,096.00 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $3,705,486.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - SOUTHERN ROAD & BRIDGE, LLC | - 3 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 436.3 | LNFT | 18.00 | 7,853.40 | 25.00 | 10,907.50 | 39.00 | 17,015.70 | | 0002 | 202-02-38240 | Removal of Signs and Supports | 1 | EACH | 1,800.00 | 1,800.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | | 0003 | 203-01-00100 | General Excavation | 220 | CUYD | 42.00 | 9,240.00 | 125.00 | 27,500.00 | 118.00 | 25,960.00 | | 0004 | 707-01-00100 | Concrete Curb | 436.3 | LNFT | 45.00 | 19,633.50 | 125.00 | 54,537.50 | 85.00 | 37,085.50 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 128,000.00 | 128,000.00 | 350,000.00 | 350,000.00 | 500,000.00 | 500,000.00 | | 0006 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 19,000.00 | 76,000.00 | 8,500.00 | 34,000.00 | 3,300.00 | 13,200.00 | | 0007 | 725-01-00100 | Temporary Detour Roads | 420.3 | SQYD | 292.00 | 122,727.60 | 650.00 | 273,195.00 | 330.00 | 138,699.00 | | 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 270,000.00 | 270,000.00 | 350,000.00 | 350,000.00 | | 0009 | 729-04-00100 | Sign (Type D) | 32 | SQFT | 50.00 | 1,600.00 | 225.00 | 7,200.00 | 42.00 | 1,344.00 | | 0010 | 729-06-00101 | Sign (Overhead Mounted)(Install) | 176 | SQFT | 54.00 | 9,504.00 | 44.00 | 7,744.00 | 45.00 | 7,920.00 | | 0011 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 3,600.00 | 7,200.00 | 4,250.00 | 8,500.00 | 2,995.00 | 5,990.00 | | 0012 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 1 | EACH | 24,400.00 | 24,400.00 | 40,000.00 | 40,000.00 | 15,800.00 | 15,800.00 | | 0013 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 436 | LNFT | 6.00 | 2,616.00 | 12.00 | 5,232.00 | 2.00 | 872.00 | | 0014 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 456,000.00 | 456,000.00 | | 0015 | 811-01-00100 | Cleaning and Painting all steel metalwork pertaining to the bridge according to the plans. Estimated 31,554 sqft. to be bid as lump sum. | 31,554 | LUMP | 1,200,000.00 | 1,200,000.00 | 955,000.00 | 955,000.00 | 1,115,000.00 | 1,115,000.00 | | 0016 | 830-01-00100 | Bridge Superstructure Repair Intermediate diaphragm connection plate replacement | 3 | EACH | 9,000.00 | 27,000.00 | 5,500.00 | 16,500.00 | 37,000.00 | 111,000.00 | | 0017 | 830-01-00100 | Bridge Superstructure Repair Intermediate diaphragm replacement | 1 | EACH | 25,000.00 | 25,000.00 | 33,500.00 | 33,500.00 | 57,000.00 | 57,000.00 | | 0018 | 830-01-00100 | Bridge Superstructure Repair Steel Girder Repair | 1 | EACH | 130,000.00 | 130,000.00 | 450,000.00 | 450,000.00 | 295,000.00 | 295,000.00 | | 0019 | 830-07-00100 | Structural Concrete Patching | 20 | SQFT | 700.00 | 14,000.00 | 950.00 | 19,000.00 | 1,300.00 | 26,000.00 | | 0020 | 830-09-00100 | Structure Jacking | 1 | LUMP | 50,000.00 | 50,000.00 | 78,500.00 | 78,500.00 | 425,000.00 | 425,000.00 | | 0021 | 830-10-00100 | Epoxy Injection | 10 | LNFT | 650.00 | 6,500.00 | 308.00 | 3,080.00 | 830.00 | 8,300.00 | | 0022 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs | 88 | SQFT | 425.00 | 37,400.00 | 650.00 | 57,200.00 | 1,100.00 | 96,800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,085,474.50 | | 2,729,096.00 | | 3,705,486.20 |
|