Proposal:H.015422.6
Parish:Ascension
Routes:LA 945
Description:LA 945: LA 3089 - LA 308
Type Construction:PAVEMENT PATCHING, MILLING ASPHALT CONCRETE, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY; AND RELATED WORK.
Estimated Construction Cost:$1,020,816.88
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $944,520.46 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,102,587.38 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,158,214.58 |
| 4 | 73475 | Madden Gulf Coast, LLC | $1,692,306.36 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 30 | LNFT | 12.51 | 375.30 | 27.00 | 810.00 | 12.00 | 360.00 | 30.00 | 900.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMP | 68 | LNFT | 36.19 | 2,460.92 | 37.50 | 2,550.00 | 30.00 | 2,040.00 | 30.00 | 2,040.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 60" CMP | 40 | LNFT | 47.78 | 1,911.20 | 37.50 | 1,500.00 | 50.00 | 2,000.00 | 30.00 | 1,200.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 444 | CUYD | 52.20 | 23,176.80 | 45.00 | 19,980.00 | 95.00 | 42,180.00 | 75.00 | 33,300.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 200 | LNFT | 18.99 | 3,798.00 | 7.50 | 1,500.00 | 14.00 | 2,800.00 | 4.00 | 800.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 60 | LNFT | 4.40 | 264.00 | 10.00 | 600.00 | 4.00 | 240.00 | 48.00 | 2,880.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 320.7 | CUYD | 66.00 | 21,166.20 | 1.00 | 320.70 | 30.00 | 9,621.00 | 20.00 | 6,414.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 3,249.8 | TON | 116.50 | 378,601.70 | 133.00 | 432,223.40 | 135.00 | 438,723.00 | 144.00 | 467,971.20 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 546.6 | TON | 116.50 | 63,678.90 | 285.00 | 155,781.00 | 175.00 | 95,655.00 | 358.00 | 195,682.80 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 18,565 | SQYD | 3.30 | 61,264.50 | 4.50 | 83,542.50 | 4.50 | 83,542.50 | 10.25 | 190,291.25 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -821 | CUYD | 0.01 | -8.21 | 0.01 | -8.21 | 0.00 | 0.00 | 0.01 | -8.21 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 27 | SQYD | 355.04 | 9,586.08 | 265.00 | 7,155.00 | 200.00 | 5,400.00 | 358.00 | 9,666.00 | | 0013 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 118 | SQYD | 168.80 | 19,918.40 | 275.00 | 32,450.00 | 225.00 | 26,550.00 | 317.00 | 37,406.00 | | 0014 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 4,911 | LNFT | 3.52 | 17,286.72 | 1.00 | 4,911.00 | 2.75 | 13,505.25 | 3.00 | 14,733.00 | | 0015 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,050 | LNFT | 3.63 | 7,441.50 | 4.25 | 8,712.50 | 2.75 | 5,637.50 | 4.00 | 8,200.00 | | 0016 | 602-03-00100 | Cleaning and Sealing Random Cracks | 1,392 | LNFT | 6.60 | 9,187.20 | 5.00 | 6,960.00 | 6.00 | 8,352.00 | 3.00 | 4,176.00 | | 0017 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 80 | LNFT | 553.43 | 44,274.40 | 375.00 | 30,000.00 | 550.00 | 44,000.00 | 405.00 | 32,400.00 | | 0018 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 56 | LNFT | 621.72 | 34,816.32 | 483.00 | 27,048.00 | 730.00 | 40,880.00 | 470.00 | 26,320.00 | | 0019 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 88 | LNFT | 196.55 | 17,296.40 | 269.00 | 23,672.00 | 270.00 | 23,760.00 | 265.00 | 23,320.00 | | 0020 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,574.00 | 2,574.00 | 3,250.00 | 3,250.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 70 | LNFT | 42.12 | 2,948.40 | 1.00 | 70.00 | 0.00 | 0.00 | 1.00 | 70.00 | | 0022 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,512.00 | 6,512.00 | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | 6,500.00 | 6,500.00 | | 0023 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 21 | EACH | 242.00 | 5,082.00 | 138.00 | 2,898.00 | 200.00 | 4,200.00 | 500.00 | 10,500.00 | | 0024 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 4,603.50 | 9,207.00 | 4,300.00 | 8,600.00 | 5,000.00 | 10,000.00 | 3,500.00 | 7,000.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 26,500.00 | 26,500.00 | 81,000.00 | 81,000.00 | 75,000.00 | 75,000.00 | 250,000.00 | 250,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 120 | LNFT | 0.25 | 30.00 | 0.25 | 30.00 | 0.25 | 30.00 | 0.25 | 30.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.50 | 12.00 | 0.50 | 12.00 | 0.50 | 12.00 | 0.50 | 12.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.079 | MILE | 270.00 | 1,101.33 | 262.00 | 1,068.70 | 325.00 | 1,325.68 | 400.00 | 1,631.60 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.615 | MILE | 800.00 | 492.00 | 858.00 | 527.67 | 800.00 | 492.00 | 800.00 | 492.00 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.774 | MILE | 1,000.00 | 3,774.00 | 1,073.00 | 4,049.50 | 1,000.00 | 3,774.00 | 1,000.00 | 3,774.00 | | 0031 | 726-01-00100 | Bedding Material | 114 | CUYD | 77.11 | 8,790.54 | 85.00 | 9,690.00 | 165.00 | 18,810.00 | 80.00 | 9,120.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 61,250.00 | 61,250.00 | 100,000.00 | 100,000.00 | 165,000.00 | 165,000.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 82.50 | 330.00 | 100.00 | 400.00 | 110.00 | 440.00 | 200.00 | 800.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 305 | EACH | 5.50 | 1,677.50 | 5.00 | 1,525.00 | 6.00 | 1,830.00 | 5.25 | 1,601.25 | | 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 120 | LNFT | 4.40 | 528.00 | 1.25 | 150.00 | 4.50 | 540.00 | 4.00 | 480.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 22.00 | 528.00 | 21.50 | 516.00 | 22.00 | 528.00 | 35.00 | 840.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.8 | MILE | 5,390.00 | 25,872.00 | 5,250.00 | 25,200.00 | 5,400.00 | 25,920.00 | 5,150.00 | 24,720.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.615 | MILE | 1,330.73 | 818.40 | 1,288.00 | 792.12 | 1,300.00 | 799.50 | 1,275.00 | 784.13 | | 0039 | 735-01-00100 | Mailboxes | 68 | EACH | 27.50 | 1,870.00 | 90.00 | 6,120.00 | 100.00 | 6,800.00 | 90.00 | 6,120.00 | | 0040 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 220.00 | 14,960.00 | 134.00 | 9,112.00 | 130.00 | 8,840.00 | 125.00 | 8,500.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 1.118 | ACRE | 3,085.51 | 3,449.60 | 3,000.00 | 3,354.00 | 2,800.00 | 3,130.40 | 3,819.85 | 4,270.59 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 15,000.00 | 15,000.00 | 95,000.00 | 95,000.00 | | 0043 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 4,911 | LNFT | 1.21 | 5,942.31 | 1.00 | 4,911.00 | 2.00 | 9,822.00 | 3.00 | 14,733.00 | | 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,050 | LNFT | 1.43 | 2,931.50 | 4.25 | 8,712.50 | 2.00 | 4,100.00 | 3.00 | 6,150.00 | | 0045 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 6,961 | LNFT | 0.55 | 3,828.55 | 2.00 | 13,922.00 | 0.75 | 5,220.75 | 1.75 | 12,181.75 | | 0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 304 | INLF | 3.25 | 988.00 | 1.00 | 304.00 | 1.00 | 304.00 | 1.00 | 304.00 | | 0047 | NS-MSC-00279 | Adjusting Valve Boxes | 3 | EACH | 759.00 | 2,277.00 | 805.00 | 2,415.00 | 350.00 | 1,050.00 | 500.00 | 1,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 944,520.46 | | 1,102,587.38 | | 1,158,214.58 | | 1,692,306.36 |
|