Proposal:H.015297.6
Parish:Bienville
Routes:US 80
Description:US 80: ADA - La 154
Type Construction:ASPHALT SURFACE TREATMENT AND RELATED WORK.
Estimated Construction Cost:$382,509.91
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $478,425.68 |
| 2 | 05635 | Dreher Contracting, LLC | $526,626.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - Dreher Contracting, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 29,149 | GAL | 4.28 | 124,757.72 | 4.75 | 138,457.75 | | 0002 | 507-02-00200 | Aggregate (S2) | 71,097 | SQYD | 2.98 | 211,869.06 | 2.70 | 191,961.90 | | 0003 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 80 | SQYD | 155.00 | 12,400.00 | 200.00 | 16,000.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,300.00 | 12,300.00 | 40,000.00 | 40,000.00 | | 0005 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 200 | LNFT | 0.59 | 118.00 | 1.00 | 200.00 | | 0006 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.341 | MILE | 944.00 | 2,209.90 | 1,100.00 | 2,575.10 | | 0007 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.735 | MILE | 1,505.00 | 23,681.18 | 1,200.00 | 18,882.00 | | 0008 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,238 | EACH | 2.65 | 3,280.70 | 3.00 | 3,714.00 | | 0009 | 724-01-00100 | Rumble Strips (Centerline) | 4.217 | MILE | 1,300.00 | 5,482.10 | 1,200.00 | 5,060.40 | | 0010 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.434 | MILE | 1,300.00 | 10,964.20 | 1,200.00 | 10,120.80 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 929 | EACH | 9.44 | 8,769.76 | 8.00 | 7,432.00 | | 0013 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 15.735 | MILE | 1,664.00 | 26,183.04 | 1,200.00 | 18,882.00 | | 0014 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 2.341 | MILE | 1,003.00 | 2,348.02 | 1,000.00 | 2,341.00 | | 0015 | 737-03-00500 | Painted Traffic Striping (Solid Line) (24" Width) | 200 | LNFT | 5.31 | 1,062.00 | 5.00 | 1,000.00 | | 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 478,425.68 | | 526,626.95 |
|