Search


Bid Tabulations for the Letting of 4/17/2024 LA DOTD Headquarters

Proposal:H.015297.6
Parish:Bienville
Routes:US 80
Description:US 80: ADA - La 154
Type Construction:ASPHALT SURFACE TREATMENT AND RELATED WORK.
Estimated Construction Cost:$382,509.91
Rank License BidderConstruction Bid
146716BRUDD CONSTRUCTION CO., LLC$478,425.68
205635Dreher Contracting, LLC$526,626.95


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
BRUDD CONSTRUCTION CO., LLC
- 2 -
Dreher Contracting, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001507-01-00100Asphalt Material (CRS-2P Emulsion) 29,149     GAL4.28124,757.724.75138,457.75
0002507-02-00200Aggregate (S2) 71,097     SQYD2.98211,869.062.70191,961.90
0003510-01-00102Pavement Patching (8" Minimum Thickness) 80     SQYD155.0012,400.00200.0016,000.00
0004713-01-00100Temporary Signs and Barricades 1     LUMP12,300.0012,300.0040,000.0040,000.00
0005713-02-00500Temporary Pavement Markings (24" Width) 200     LNFT0.59118.001.00200.00
0006713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.341 MILE944.002,209.901,100.002,575.10
0007713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 15.735 MILE1,505.0023,681.181,200.0018,882.00
0008713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 1,238     EACH2.653,280.703.003,714.00
0009724-01-00100Rumble Strips (Centerline) 4.217 MILE1,300.005,482.101,200.005,060.40
0010724-02-00100Rumble Strips (Shoulder/Edge) 8.434 MILE1,300.0010,964.201,200.0010,120.80
0011727-01-00100Mobilization 1     LUMP25,000.0025,000.0050,000.0050,000.00
0012731-02-00100Reflectorized Raised Pavement Markers 929     EACH9.448,769.768.007,432.00
0013737-01-00100Painted Traffic Striping (Solid Line) (4" Width) 15.735 MILE1,664.0026,183.041,200.0018,882.00
0014737-02-00100Painted Traffic Striping (Broken Line) (4" Width) 2.341 MILE1,003.002,348.021,000.002,341.00
0015737-03-00500Painted Traffic Striping (Solid Line) (24" Width) 200     LNFT5.311,062.005.001,000.00
0016740-01-00100Construction Layout 1     LUMP8,000.008,000.0020,000.0020,000.00
         
  CONTRACTOR TOTAL   478,425.68 526,626.95