Proposal:H.014859.6
Parish:Acadia
Routes:LA 365
Description:LA 365: LA 370 - LA 13
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,588,954.54
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $3,129,762.00 |
| 2 | 34356 | Prairie Contractors LLC | $3,220,190.26 |
| 3 | 51821 | Elliott Construction, LLC | $3,260,964.84 |
| 4 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,841,434.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | - 4 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.5 | LUMP | 30,015.17 | 30,015.17 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,875.00 | 10,875.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 792 | LNFT | 11.62 | 9,203.04 | 18.00 | 14,256.00 | 15.00 | 11,880.00 | 11.00 | 8,712.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" CMPA, 24" CMP, 30" Equiv. CMPA) | 234 | LNFT | 47.00 | 10,998.00 | 42.00 | 9,828.00 | 40.00 | 9,360.00 | 25.00 | 5,850.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" Equiv. CMPA | 100 | LNFT | 55.00 | 5,500.00 | 55.00 | 5,500.00 | 50.00 | 5,000.00 | 25.00 | 2,500.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (15'' CPP, 18" RCP, 24" CMP, 30" CMP) | 347 | LNFT | 32.00 | 11,104.00 | 37.00 | 12,839.00 | 35.00 | 12,145.00 | 25.00 | 8,675.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 93,012.92 | 93,012.92 | 150,000.00 | 150,000.00 | 125,000.00 | 125,000.00 | 175,000.00 | 175,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 22 | EACH | 174.23 | 3,833.06 | 175.00 | 3,850.00 | 195.00 | 4,290.00 | 165.00 | 3,630.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,039 | LNFT | 2.91 | 3,023.49 | 3.00 | 3,117.00 | 2.50 | 2,597.50 | 3.00 | 3,117.00 | | 0010 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 32,526 | SQYD | 8.50 | 276,471.00 | 9.00 | 292,734.00 | 10.50 | 341,523.00 | 10.00 | 325,260.00 | | 0011 | 303-02-00100 | Removal of Existing Patches | 50 | SQYD | 77.80 | 3,890.00 | 10.00 | 500.00 | 20.00 | 1,000.00 | 50.00 | 2,500.00 | | 0012 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 32,526 | SQYD | 10.00 | 325,260.00 | 9.00 | 292,734.00 | 13.00 | 422,838.00 | 14.00 | 455,364.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 36.00 | 5,400.00 | 75.00 | 11,250.00 | 50.00 | 7,500.00 | 100.00 | 15,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 6,708.8 | TON | 137.64 | 923,399.23 | 119.00 | 798,347.20 | 128.00 | 858,726.40 | 150.00 | 1,006,320.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 565.4 | TON | 168.60 | 95,326.44 | 225.00 | 127,215.00 | 180.00 | 101,772.00 | 150.00 | 84,810.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 23,283 | SQYD | 2.50 | 58,207.50 | 2.90 | 67,520.70 | 3.00 | 69,849.00 | 3.00 | 69,849.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,294 | CUYD | 0.10 | -129.40 | 0.01 | -12.94 | 0.01 | -12.94 | 1.00 | -1,294.00 | | 0018 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 415 | SQYD | 181.00 | 75,115.00 | 156.00 | 64,740.00 | 170.00 | 70,550.00 | 175.00 | 72,625.00 | | 0019 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 980 | LNFT | 6.00 | 5,880.00 | 6.00 | 5,880.00 | 5.50 | 5,390.00 | 6.00 | 5,880.00 | | 0020 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 360 | LNFT | 6.00 | 2,160.00 | 6.00 | 2,160.00 | 5.50 | 1,980.00 | 6.00 | 2,160.00 | | 0021 | 602-12-00100 | Undersealing Pavement | 5.7 | TON | 1,975.00 | 11,257.50 | 2,000.00 | 11,400.00 | 6,600.00 | 37,620.00 | 2,000.00 | 11,400.00 | | 0022 | 602-14-00100 | Holes | 16 | EACH | 580.75 | 9,292.00 | 750.00 | 12,000.00 | 550.00 | 8,800.00 | 525.00 | 8,400.00 | | 0023 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 96 | LNFT | 348.00 | 33,408.00 | 250.00 | 24,000.00 | 220.00 | 21,120.00 | 310.00 | 29,760.00 | | 0024 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 46 | LNFT | 377.00 | 17,342.00 | 250.00 | 11,500.00 | 215.00 | 9,890.00 | 350.00 | 16,100.00 | | 0025 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 104 | LNFT | 422.00 | 43,888.00 | 350.00 | 36,400.00 | 305.00 | 31,720.00 | 450.00 | 46,800.00 | | 0026 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | 48 | LNFT | 1,402.50 | 67,320.00 | 950.00 | 45,600.00 | 850.00 | 40,800.00 | 1,400.00 | 67,200.00 | | 0027 | 701-05-01106 | Side Drain Pipe (36" RCP/RPVCP) | 885 | LNFT | 165.75 | 146,688.75 | 225.00 | 199,125.00 | 195.00 | 172,575.00 | 260.00 | 230,100.00 | | 0028 | 701-05-02106 | Side Drain Pipe (Erosion) (36" RPVCP) | 370 | LNFT | 165.75 | 61,327.50 | 210.00 | 77,700.00 | 185.00 | 68,450.00 | 280.00 | 103,600.00 | | 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,549 | LNFT | 5.00 | 7,745.00 | 4.25 | 6,583.25 | 4.00 | 6,196.00 | 10.00 | 15,490.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 4,175.00 | 50,100.00 | 7,000.00 | 84,000.00 | 6,600.00 | 79,200.00 | 9,000.00 | 108,000.00 | | 0031 | 702-08-00200 | Side Drain Safety End (Type 2) | 8 | EACH | 6,500.00 | 52,000.00 | 14,000.00 | 112,000.00 | 13,200.00 | 105,600.00 | 19,000.00 | 152,000.00 | | 0032 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 466 | LNFT | 120.00 | 55,920.00 | 195.00 | 90,870.00 | 138.00 | 64,308.00 | 105.00 | 48,930.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 175 | LNFT | 23.25 | 4,068.75 | 40.00 | 7,000.00 | 34.00 | 5,950.00 | 22.00 | 3,850.00 | | 0034 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 4,065.25 | 32,522.00 | 4,750.00 | 38,000.00 | 3,915.00 | 31,320.00 | 3,750.00 | 30,000.00 | | 0035 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 91 | SQYD | 87.50 | 7,962.50 | 200.00 | 18,200.00 | 150.00 | 13,650.00 | 250.00 | 22,750.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 91 | SQYD | 2.00 | 182.00 | 15.00 | 1,365.00 | 11.00 | 1,001.00 | 10.00 | 910.00 | | 0037 | 712-02-00100 | Sacked Concrete Revetment | 10 | SQYD | 377.75 | 3,777.50 | 300.00 | 3,000.00 | 400.00 | 4,000.00 | 1,400.00 | 14,000.00 | | 0038 | 712-04-00100 | Flexible Revetment | 26 | SQYD | 115.00 | 2,990.00 | 210.00 | 5,460.00 | 175.00 | 4,550.00 | 260.00 | 6,760.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 155,150.00 | 155,150.00 | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | | 0040 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 198 | LNFT | 1.20 | 237.60 | 0.01 | 1.98 | 1.10 | 217.80 | 5.00 | 990.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.922 | MILE | 600.00 | 3,553.20 | 550.00 | 3,257.10 | 525.00 | 3,109.05 | 400.00 | 2,368.80 | | 0042 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.307 | MILE | 668.00 | 3,545.08 | 650.00 | 3,449.55 | 635.00 | 3,369.95 | 400.00 | 2,122.80 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.481 | MILE | 1,510.00 | 21,866.31 | 1,500.00 | 21,721.50 | 1,450.00 | 20,997.45 | 800.00 | 11,584.80 | | 0044 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 116.15 | 232.30 | 0.01 | 0.02 | 110.00 | 220.00 | 1,000.00 | 2,000.00 | | 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 11,000.00 | 11,000.00 | 16,000.00 | 16,000.00 | 12,000.00 | 12,000.00 | 11,000.00 | 11,000.00 | | 0046 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.987 | MILE | 315.00 | 1,255.91 | 1,200.00 | 4,784.40 | 1,210.00 | 4,824.27 | 1,200.00 | 4,784.40 | | 0047 | 726-01-00100 | Bedding Material (6" THICK) | 201.5 | CUYD | 104.00 | 20,956.00 | 200.00 | 40,300.00 | 175.00 | 35,262.50 | 250.00 | 50,375.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 275,400.00 | 275,400.00 | 300,000.00 | 300,000.00 | 225,000.00 | 225,000.00 | 380,000.00 | 380,000.00 | | 0049 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 116.15 | 696.90 | 130.00 | 780.00 | 85.00 | 510.00 | 105.00 | 630.00 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 116.15 | 1,393.80 | 145.00 | 1,740.00 | 105.00 | 1,260.00 | 105.00 | 1,260.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 292 | EACH | 9.30 | 2,715.60 | 10.00 | 2,920.00 | 9.00 | 2,628.00 | 7.50 | 2,190.00 | | 0052 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 66 | LNFT | 25.00 | 1,650.00 | 25.00 | 1,650.00 | 25.00 | 1,650.00 | 16.00 | 1,056.00 | | 0053 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.827 | MILE | 7,405.00 | 35,743.94 | 7,250.00 | 34,995.75 | 7,015.00 | 33,861.41 | 5,400.00 | 26,065.80 | | 0054 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.769 | MILE | 3,716.80 | 6,575.02 | 3,750.00 | 6,633.75 | 3,500.00 | 6,191.50 | 2,300.00 | 4,068.70 | | 0055 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,393.80 | 2,787.60 | 1,500.00 | 3,000.00 | 1,350.00 | 2,700.00 | 1,600.00 | 3,200.00 | | 0056 | 732-05-00100 | Removal of Existing Markings | 0.033 | MILE | 13,357.25 | 440.79 | 15,000.00 | 495.00 | 12,650.00 | 417.45 | 100,000.00 | 3,300.00 | | 0057 | 735-01-00100 | Mailboxes | 6 | EACH | 60.00 | 360.00 | 50.00 | 300.00 | 22.00 | 132.00 | 40.00 | 240.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 175.00 | 1,050.00 | 300.00 | 1,800.00 | 275.00 | 1,650.00 | 205.00 | 1,230.00 | | 0059 | 739-01-00100 | Hydro-Seeding | 5.7 | ACRE | 3,080.00 | 17,556.00 | 3,000.00 | 17,100.00 | 3,215.00 | 18,325.50 | 2,800.00 | 15,960.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,260.00 | 9,260.00 | 100.00 | 100.00 | 13,500.00 | 13,500.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,129,762.00 | | 3,220,190.26 | | 3,260,964.84 | | 3,841,434.30 |
|