Proposal:H.014840.6
Parish:Grant
Routes: LA 1239
Description:LA 1239: CREOLA ST - US 71
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,052,514.55
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,202,002.31 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $1,439,994.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 70 | SQYD | 26.00 | 1,820.00 | 56.00 | 3,920.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 171.6 | LNFT | 16.00 | 2,745.60 | 16.00 | 2,745.60 | | 0003 | 202-02-46002 | Removal of Walls, Retaining Structure, Concrete | 8 | SQYD | 145.00 | 1,160.00 | 100.00 | 800.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 58 | CUYD | 16.00 | 928.00 | 165.00 | 9,570.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 300 | CUYD | 140.00 | 42,000.00 | 95.00 | 28,500.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 1,998.4 | TON | 140.00 | 279,776.00 | 200.00 | 399,680.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 449.5 | TON | 252.00 | 113,274.00 | 300.00 | 134,850.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 13,750 | SQYD | 3.00 | 41,250.00 | 5.50 | 75,625.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -355 | CUYD | 1.00 | -355.00 | 1.00 | -355.00 | | 0010 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 294 | SQYD | 201.00 | 59,094.00 | 210.00 | 61,740.00 | | 0011 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 1,144.5 | SQYD | 170.00 | 194,565.00 | 200.00 | 228,900.00 | | 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,222 | LNFT | 5.00 | 6,110.00 | 9.00 | 10,998.00 | | 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,134 | LNFT | 5.00 | 5,670.00 | 9.00 | 10,206.00 | | 0014 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 4,000.00 | 8,000.00 | 1,500.00 | 3,000.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 100.8 | SQYD | 155.00 | 15,624.00 | 180.00 | 18,144.00 | | 0016 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 140.8 | SQYD | 200.00 | 28,160.00 | 180.00 | 25,344.00 | | 0017 | 706-04-00110 | Curb Ramps (6 - TYPE 3 RAMP) (4 - TYPE 7 RAMP) | 55.9 | SQYD | 320.00 | 17,888.00 | 700.00 | 39,130.00 | | 0018 | 707-01-00100 | Concrete Curb | 29 | LNFT | 65.00 | 1,885.00 | 85.00 | 2,465.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 87,000.00 | 87,000.00 | 50,000.00 | 50,000.00 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.715 | MILE | 154.00 | 572.11 | 500.00 | 1,857.50 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.451 | MILE | 800.00 | 1,160.80 | 850.00 | 1,233.35 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.842 | MILE | 1,200.00 | 14,210.40 | 1,300.00 | 15,394.60 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 140,000.00 | 140,000.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 269 | EACH | 9.00 | 2,421.00 | 9.00 | 2,421.00 | | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 362 | LNFT | 22.00 | 7,964.00 | 22.00 | 7,964.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.77 | MILE | 6,500.00 | 31,005.00 | 6,500.00 | 31,005.00 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.621 | MILE | 3,400.00 | 2,111.40 | 3,300.00 | 2,049.30 | | 0028 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 3 | EACH | 1,300.00 | 3,900.00 | 1,300.00 | 3,900.00 | | 0029 | 735-01-00100 | Mailboxes | 16 | EACH | 25.00 | 400.00 | 30.00 | 480.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 200.00 | 3,200.00 | 205.00 | 3,280.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 1.6 | ACRE | 2,800.00 | 4,480.00 | 3,000.00 | 4,800.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 49,500.00 | 49,500.00 | 25,000.00 | 25,000.00 | | 0033 | 741-35-00100 | Adjust Valve or Meter Box | 1 | EACH | 4,000.00 | 4,000.00 | 1,600.00 | 1,600.00 | | 0034 | 810-04-00100 | Hand Railing | 77 | LNFT | 115.00 | 8,855.00 | 300.00 | 23,100.00 | | 0035 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 2,200 | LNFT | 2.50 | 5,500.00 | 6.00 | 13,200.00 | | 0036 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,444 | LNFT | 2.50 | 6,110.00 | 6.00 | 14,664.00 | | 0037 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 4,644 | LNFT | 1.25 | 5,805.00 | 2.00 | 9,288.00 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,029 | INLF | 7.00 | 7,203.00 | 5.00 | 5,145.00 | | 0039 | NS-602-00001 | Milling Concrete Pavement | 189 | SQYD | 90.00 | 17,010.00 | 150.00 | 28,350.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,202,002.31 | | 1,439,994.35 |
|