Proposal:H.012752.6
Parish:St. Bernard
Routes:LA 46
Description:LA 46 @ WEINBERGER RD INTERSECTION
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,832,613.36
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $1,603,122.55 |
| 2 | 55950 | Brown Industrial Construction, LLC | $1,618,716.00 |
| 3 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $1,722,494.79 |
| 4 | 24901 | Hard Rock Construction LLC | $1,880,675.45 |
| 5 | 36961 | Cycle Construction Co. L.L.C. | $1,928,173.00 |
| 6 | 48896 | Command Construction Industries LLC | $2,200,802.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Brown Industrial Construction, LLC | - 3 - BEVERLY CONSTRUCTION CO. LLC | - 4 - Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.55 | LUMP | 5,000.00 | 5,000.00 | 80,000.00 | 80,000.00 | 19,000.00 | 19,000.00 | 13,000.00 | 13,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | 11,000.00 | 11,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 149 | SQYD | 19.00 | 2,831.00 | 14.00 | 2,086.00 | 19.50 | 2,905.50 | 18.00 | 2,682.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,319.6 | SQYD | 19.00 | 25,072.40 | 10.00 | 13,196.00 | 18.25 | 24,082.70 | 28.00 | 36,948.80 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 2,775.7 | SQYD | 10.00 | 27,757.00 | 10.00 | 27,757.00 | 7.00 | 19,429.90 | 25.00 | 69,392.50 | | 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 926.9 | LNFT | 5.00 | 4,634.50 | 10.00 | 9,269.00 | 7.80 | 7,229.82 | 20.00 | 18,538.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 135 | SQYD | 12.00 | 1,620.00 | 20.00 | 2,700.00 | 20.00 | 2,700.00 | 20.00 | 2,700.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 551 | SQYD | 12.00 | 6,612.00 | 15.00 | 8,265.00 | 29.60 | 16,309.60 | 25.00 | 13,775.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" Cross Drain) | 48 | LNFT | 17.00 | 816.00 | 40.00 | 1,920.00 | 44.00 | 2,112.00 | 48.00 | 2,304.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (15" Side Drain) | 51 | LNFT | 15.00 | 765.00 | 45.00 | 2,295.00 | 32.30 | 1,647.30 | 43.00 | 2,193.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) (21" Side Drain) | 58 | LNFT | 12.00 | 696.00 | 40.00 | 2,320.00 | 28.40 | 1,647.20 | 38.00 | 2,204.00 | | 0012 | 202-02-32120 | Removal of Pipe (Side Drain) (30" Side Drain) | 296 | LNFT | 12.00 | 3,552.00 | 45.00 | 13,320.00 | 45.00 | 13,320.00 | 41.00 | 12,136.00 | | 0013 | 202-02-32120 | Removal of Pipe (Side Drain) (48" Side Drain) | 31 | LNFT | 35.00 | 1,085.00 | 55.00 | 1,705.00 | 78.00 | 2,418.00 | 46.00 | 1,426.00 | | 0014 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 500.00 | 1,000.00 | 1,500.00 | 3,000.00 | 2,525.00 | 5,050.00 | 1,100.00 | 2,200.00 | | 0015 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,456 | SQYD | 15.00 | 21,840.00 | 20.00 | 29,120.00 | 18.75 | 27,300.00 | 25.00 | 36,400.00 | | 0016 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 200.00 | 600.00 | 500.00 | 1,500.00 | 46.50 | 139.50 | 17.00 | 51.00 | | 0017 | 203-01-00100 | General Excavation | 2,864 | CUYD | 21.00 | 60,144.00 | 20.00 | 57,280.00 | 14.00 | 40,096.00 | 22.00 | 63,008.00 | | 0018 | 203-03-00100 | Embankment | 205 | CUYD | 35.00 | 7,175.00 | 160.00 | 32,800.00 | 33.75 | 6,918.75 | 63.00 | 12,915.00 | | 0019 | 203-04-00200 | Nonplastic Embankment (Sand) (12" MIN) | 3,579 | CUYD | 28.00 | 100,212.00 | 26.00 | 93,054.00 | 23.25 | 83,211.75 | 48.00 | 171,792.00 | | 0020 | 203-08-00100 | Geotextile Fabric | 9,226 | SQYD | 1.50 | 13,839.00 | 2.50 | 23,065.00 | 2.15 | 19,835.90 | 1.60 | 14,761.60 | | 0021 | 203-10-00100 | Cleaning Existing Ditches | 515 | LNFT | 15.00 | 7,725.00 | 17.00 | 8,755.00 | 14.00 | 7,210.00 | 14.00 | 7,210.00 | | 0022 | 204-02-00100 | Temporary Hay Bales | 15 | EACH | 125.00 | 1,875.00 | 125.00 | 1,875.00 | 32.50 | 487.50 | 30.00 | 450.00 | | 0023 | 204-06-00100 | Temporary Silt Fencing | 2,261 | LNFT | 3.00 | 6,783.00 | 3.00 | 6,783.00 | 2.50 | 5,652.50 | 2.40 | 5,426.40 | | 0024 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,590.2 | SQYD | 21.00 | 75,394.20 | 25.00 | 89,755.00 | 31.00 | 111,296.20 | 42.00 | 150,788.40 | | 0025 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,070.5 | SQYD | 39.00 | 80,749.50 | 40.00 | 82,820.00 | 42.75 | 88,513.88 | 58.00 | 120,089.00 | | 0026 | 401-01-00100 | Aggregate Surface Course (Net Section) | 10.4 | CUYD | 250.00 | 2,600.00 | 150.00 | 1,560.00 | 116.00 | 1,206.40 | 161.00 | 1,674.40 | | 0027 | 502-01-00100 | Asphalt Concrete | 332.1 | TON | 452.00 | 150,109.20 | 285.00 | 94,648.50 | 292.00 | 96,973.20 | 215.00 | 71,401.50 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 412.9 | TON | 260.00 | 107,354.00 | 285.00 | 117,676.50 | 292.00 | 120,566.80 | 218.00 | 90,012.20 | | 0029 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 1,479.1 | SQYD | 121.00 | 178,971.10 | 110.00 | 162,701.00 | 145.00 | 214,469.50 | 109.00 | 161,221.90 | | 0030 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 1,000.4 | SQYD | 121.00 | 121,048.40 | 115.00 | 115,046.00 | 163.00 | 163,065.20 | 131.00 | 131,052.40 | | 0031 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 56 | LNFT | 350.00 | 19,600.00 | 330.00 | 18,480.00 | 498.00 | 27,888.00 | 328.00 | 18,368.00 | | 0032 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 20 | LNFT | 95.00 | 1,900.00 | 175.00 | 3,500.00 | 93.25 | 1,865.00 | 313.00 | 6,260.00 | | 0033 | 701-05-01064 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW) | 56 | LNFT | 100.00 | 5,600.00 | 120.00 | 6,720.00 | 108.00 | 6,048.00 | 170.00 | 9,520.00 | | 0034 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 72 | LNFT | 200.00 | 14,400.00 | 220.00 | 15,840.00 | 220.00 | 15,840.00 | 245.00 | 17,640.00 | | 0035 | 701-06-01100 | Side Drain Pipe Arch (42" Equiv. RCPA/CMPA) | 136 | LNFT | 275.00 | 37,400.00 | 255.00 | 34,680.00 | 296.00 | 40,256.00 | 312.00 | 42,432.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 7,000.00 | 21,000.00 | 3,000.00 | 9,000.00 | 4,427.00 | 13,281.00 | 6,100.00 | 18,300.00 | | 0037 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 6,000.00 | 18,000.00 | 5,000.00 | 15,000.00 | 2,630.00 | 7,890.00 | 2,000.00 | 6,000.00 | | 0038 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 184.1 | SQYD | 15.00 | 2,761.50 | 60.00 | 11,046.00 | 109.00 | 20,066.90 | 120.00 | 22,092.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 933.9 | LNFT | 65.00 | 60,703.50 | 50.00 | 46,695.00 | 48.00 | 44,827.20 | 68.00 | 63,505.20 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 62,000.00 | 62,000.00 | 82,500.00 | 82,500.00 | 104,000.00 | 104,000.00 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.445 | MILE | 1,350.00 | 1,950.75 | 2,000.00 | 2,890.00 | 2,664.00 | 3,849.48 | 1,200.00 | 1,734.00 | | 0042 | 716-01-00200 | Mulch (Fiber) | 1.8 | TON | 3,100.00 | 5,580.00 | 2,500.00 | 4,500.00 | 7,250.00 | 13,050.00 | 7,500.00 | 13,500.00 | | 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 207 | SQYD | 2.50 | 517.50 | 2.00 | 414.00 | 2.15 | 445.05 | 2.20 | 455.40 | | 0044 | 725-01-00100 | Temporary Detour Roads | 1,724.5 | SQYD | 42.00 | 72,429.00 | 38.00 | 65,531.00 | 48.50 | 83,638.25 | 45.00 | 77,602.50 | | 0045 | 726-01-00100 | Bedding Material | 97.8 | CUYD | 80.00 | 7,824.00 | 115.00 | 11,247.00 | 123.50 | 12,078.30 | 110.00 | 10,758.00 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 135,000.00 | 135,000.00 | 156,000.00 | 156,000.00 | 171,077.00 | 171,077.00 | 174,000.00 | 174,000.00 | | 0047 | 729-01-00100 | Sign (Type A) | 48.9 | SQFT | 30.00 | 1,467.00 | 30.00 | 1,467.00 | 31.85 | 1,557.47 | 33.00 | 1,613.70 | | 0048 | 729-02-00100 | Sign (Type B) | 31.5 | SQFT | 40.00 | 1,260.00 | 35.00 | 1,102.50 | 37.00 | 1,165.50 | 39.00 | 1,228.50 | | 0049 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 2,655.00 | 2,655.00 | 2,800.00 | 2,800.00 | | 0050 | 729-21-00100 | U-Channel Post | 9 | EACH | 125.00 | 1,125.00 | 150.00 | 1,350.00 | 159.00 | 1,431.00 | 166.00 | 1,494.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 95 | EACH | 13.00 | 1,235.00 | 10.00 | 950.00 | 13.25 | 1,258.75 | 11.00 | 1,045.00 | | 0052 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 589 | LNFT | 4.00 | 2,356.00 | 4.00 | 2,356.00 | 6.50 | 3,828.50 | 3.30 | 1,943.70 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 71 | LNFT | 18.00 | 1,278.00 | 20.00 | 1,420.00 | 26.50 | 1,881.50 | 78.00 | 5,538.00 | | 0054 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 723 | LNFT | 4.00 | 2,892.00 | 4.00 | 2,892.00 | 5.50 | 3,976.50 | 3.25 | 2,349.75 | | 0055 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.864 | MILE | 9,000.00 | 7,776.00 | 8,500.00 | 7,344.00 | 7,965.00 | 6,881.76 | 8,400.00 | 7,257.60 | | 0056 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.511 | MILE | 3,000.00 | 1,533.00 | 2,500.00 | 1,277.50 | 2,125.00 | 1,085.88 | 2,800.00 | 1,430.80 | | 0057 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 450.00 | 1,350.00 | 400.00 | 1,200.00 | 478.00 | 1,434.00 | 289.00 | 867.00 | | 0058 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 450.00 | 900.00 | 400.00 | 800.00 | 531.00 | 1,062.00 | 287.00 | 574.00 | | 0059 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 450.00 | 900.00 | 400.00 | 800.00 | 531.00 | 1,062.00 | 288.00 | 576.00 | | 0060 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 3 | EACH | 300.00 | 900.00 | 300.00 | 900.00 | 640.00 | 1,920.00 | 279.00 | 837.00 | | 0061 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 2,000.00 | 2,000.00 | 1,200.00 | 1,200.00 | 1,062.00 | 1,062.00 | 1,700.00 | 1,700.00 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.627 | MILE | 12,000.00 | 7,524.00 | 10,000.00 | 6,270.00 | 15,950.00 | 10,000.65 | 10,600.00 | 6,646.20 | | 0063 | 739-01-00100 | Hydro-Seeding | 0.9 | ACRE | 6,000.00 | 5,400.00 | 3,000.00 | 2,700.00 | 5,250.00 | 4,725.00 | 5,500.00 | 4,950.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 27,000.00 | 27,000.00 | 13,000.00 | 13,000.00 | 19,000.00 | 19,000.00 | | 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,032 | INLF | 1.00 | 2,032.00 | 1.00 | 2,032.00 | 0.96 | 1,950.72 | 2.00 | 4,064.00 | | 0066 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 168 | INLF | 1.00 | 168.00 | 5.00 | 840.00 | 0.96 | 161.28 | 5.00 | 840.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,603,122.55 | | 1,618,716.00 | | 1,722,494.79 | | 1,880,675.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Cycle Construction Co. L.L.C. | - 6 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.55 | LUMP | 32,600.00 | 32,600.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,500.00 | 11,500.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 149 | SQYD | 36.00 | 5,364.00 | 25.00 | 3,725.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,319.6 | SQYD | 18.00 | 23,752.80 | 25.00 | 32,990.00 | | 0005 | 202-02-03010 | Removal of Base – Recycled PCC or Stone | 2,775.7 | SQYD | 13.00 | 36,084.10 | 25.00 | 69,392.50 | | 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 926.9 | LNFT | 11.00 | 10,195.90 | 25.00 | 23,172.50 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 135 | SQYD | 21.00 | 2,835.00 | 25.00 | 3,375.00 | | 0008 | 202-02-26300 | Removal of Median / Island | 551 | SQYD | 13.00 | 7,163.00 | 25.00 | 13,775.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" Cross Drain) | 48 | LNFT | 65.00 | 3,120.00 | 25.00 | 1,200.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (15" Side Drain) | 51 | LNFT | 57.00 | 2,907.00 | 25.00 | 1,275.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) (21" Side Drain) | 58 | LNFT | 51.00 | 2,958.00 | 25.00 | 1,450.00 | | 0012 | 202-02-32120 | Removal of Pipe (Side Drain) (30" Side Drain) | 296 | LNFT | 50.00 | 14,800.00 | 25.00 | 7,400.00 | | 0013 | 202-02-32120 | Removal of Pipe (Side Drain) (48" Side Drain) | 31 | LNFT | 106.00 | 3,286.00 | 25.00 | 775.00 | | 0014 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 1,400.00 | 2,800.00 | 1,000.00 | 2,000.00 | | 0015 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,456 | SQYD | 17.00 | 24,752.00 | 25.00 | 36,400.00 | | 0016 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 12.00 | 36.00 | 250.00 | 750.00 | | 0017 | 203-01-00100 | General Excavation | 2,864 | CUYD | 36.00 | 103,104.00 | 50.00 | 143,200.00 | | 0018 | 203-03-00100 | Embankment | 205 | CUYD | 79.00 | 16,195.00 | 50.00 | 10,250.00 | | 0019 | 203-04-00200 | Nonplastic Embankment (Sand) (12" MIN) | 3,579 | CUYD | 30.00 | 107,370.00 | 50.00 | 178,950.00 | | 0020 | 203-08-00100 | Geotextile Fabric | 9,226 | SQYD | 3.25 | 29,984.50 | 5.00 | 46,130.00 | | 0021 | 203-10-00100 | Cleaning Existing Ditches | 515 | LNFT | 27.50 | 14,162.50 | 1.00 | 515.00 | | 0022 | 204-02-00100 | Temporary Hay Bales | 15 | EACH | 36.00 | 540.00 | 25.00 | 375.00 | | 0023 | 204-06-00100 | Temporary Silt Fencing | 2,261 | LNFT | 4.00 | 9,044.00 | 5.00 | 11,305.00 | | 0024 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,590.2 | SQYD | 23.00 | 82,574.60 | 50.00 | 179,510.00 | | 0025 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,070.5 | SQYD | 33.00 | 68,326.50 | 75.00 | 155,287.50 | | 0026 | 401-01-00100 | Aggregate Surface Course (Net Section) | 10.4 | CUYD | 256.00 | 2,662.40 | 250.00 | 2,600.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 332.1 | TON | 325.00 | 107,932.50 | 300.00 | 99,630.00 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 412.9 | TON | 325.00 | 134,192.50 | 300.00 | 123,870.00 | | 0029 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 1,479.1 | SQYD | 104.00 | 153,826.40 | 110.00 | 162,701.00 | | 0030 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 1,000.4 | SQYD | 114.00 | 114,045.60 | 110.00 | 110,044.00 | | 0031 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 56 | LNFT | 504.00 | 28,224.00 | 500.00 | 28,000.00 | | 0032 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 20 | LNFT | 221.00 | 4,420.00 | 150.00 | 3,000.00 | | 0033 | 701-05-01064 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW) | 56 | LNFT | 151.00 | 8,456.00 | 250.00 | 14,000.00 | | 0034 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 72 | LNFT | 307.00 | 22,104.00 | 350.00 | 25,200.00 | | 0035 | 701-06-01100 | Side Drain Pipe Arch (42" Equiv. RCPA/CMPA) | 136 | LNFT | 374.00 | 50,864.00 | 500.00 | 68,000.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 8,025.00 | 24,075.00 | 5,000.00 | 15,000.00 | | 0037 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 7,000.00 | 21,000.00 | 1,000.00 | 3,000.00 | | 0038 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 184.1 | SQYD | 104.00 | 19,146.40 | 50.00 | 9,205.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 933.9 | LNFT | 58.00 | 54,166.20 | 50.00 | 46,695.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 137,500.00 | 137,500.00 | 50,000.00 | 50,000.00 | | 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.445 | MILE | 1,300.00 | 1,878.50 | 1,000.00 | 1,445.00 | | 0042 | 716-01-00200 | Mulch (Fiber) | 1.8 | TON | 8,100.00 | 14,580.00 | 2,500.00 | 4,500.00 | | 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 207 | SQYD | 2.35 | 486.45 | 10.00 | 2,070.00 | | 0044 | 725-01-00100 | Temporary Detour Roads | 1,724.5 | SQYD | 56.50 | 97,434.25 | 100.00 | 172,450.00 | | 0045 | 726-01-00100 | Bedding Material | 97.8 | CUYD | 116.00 | 11,344.80 | 100.00 | 9,780.00 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 234,300.55 | 234,300.55 | 200,000.00 | 200,000.00 | | 0047 | 729-01-00100 | Sign (Type A) | 48.9 | SQFT | 32.50 | 1,589.25 | 25.00 | 1,222.50 | | 0048 | 729-02-00100 | Sign (Type B) | 31.5 | SQFT | 32.50 | 1,023.75 | 25.00 | 787.50 | | 0049 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 2,360.00 | 2,360.00 | 2,500.00 | 2,500.00 | | 0050 | 729-21-00100 | U-Channel Post | 9 | EACH | 118.01 | 1,062.09 | 250.00 | 2,250.00 | | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 95 | EACH | 12.00 | 1,140.00 | 25.00 | 2,375.00 | | 0052 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 589 | LNFT | 3.54 | 2,085.06 | 1.00 | 589.00 | | 0053 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 71 | LNFT | 17.70 | 1,256.70 | 25.00 | 1,775.00 | | 0054 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 723 | LNFT | 3.54 | 2,559.42 | 1.00 | 723.00 | | 0055 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.864 | MILE | 8,850.00 | 7,646.40 | 10,000.00 | 8,640.00 | | 0056 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.511 | MILE | 2,950.37 | 1,507.64 | 2,500.00 | 1,277.50 | | 0057 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 413.05 | 1,239.15 | 500.00 | 1,500.00 | | 0058 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 413.05 | 826.10 | 500.00 | 1,000.00 | | 0059 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 413.05 | 826.10 | 500.00 | 1,000.00 | | 0060 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 3 | EACH | 295.04 | 885.12 | 500.00 | 1,500.00 | | 0061 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 1,770.20 | 1,770.20 | 2,500.00 | 2,500.00 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.627 | MILE | 11,210.00 | 7,028.67 | 10,000.00 | 6,270.00 | | 0063 | 739-01-00100 | Hydro-Seeding | 0.9 | ACRE | 5,825.00 | 5,242.50 | 5,000.00 | 4,500.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 | | 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,032 | INLF | 0.90 | 1,828.80 | 5.00 | 10,160.00 | | 0066 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 168 | INLF | 1.20 | 201.60 | 5.00 | 840.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,928,173.00 | | 2,200,802.00 |
|