Proposal:H.014923.6
Parish:Washington
Routes:LA 1070, LA 1073
Description:LA 1070 & LA 1073: OVERLAYS
Type Construction:GRADING, DRAINAGE STRUCTURE, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,696,780.26
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,997,580.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 5 | SQYD | 1.00 | 5.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" Equiv. CMPA | 40 | LNFT | 52.00 | 2,080.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" Equiv. CMPA | 430 | LNFT | 52.00 | 22,360.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" Equiv. CMPA | 139 | LNFT | 52.00 | 7,228.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" Equiv. CMPA | 39 | LNFT | 52.00 | 2,028.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 42" Equiv. CMPA | 140 | LNFT | 52.00 | 7,280.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" Equiv. CMPA | 59 | LNFT | 52.00 | 3,068.00 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 60" Equiv. CMPA | 64 | LNFT | 52.00 | 3,328.00 | | 0009 | 202-02-38300 | Removal of Sign and U-Channel Post | 44 | EACH | 95.00 | 4,180.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,726 | CUYD | 30.00 | 51,780.00 | | 0011 | 203-10-00100 | Cleaning Existing Ditches | 3,800 | LNFT | 0.10 | 380.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 84 | EACH | 190.00 | 15,960.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 36,042 | LNFT | 1.50 | 54,063.00 | | 0014 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 38,904 | SQYD | 17.75 | 690,546.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,157 | CUYD | 46.00 | 53,222.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 75 | CUYD | 1.00 | 75.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 9,956.2 | TON | 139.75 | 1,391,378.95 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 647.6 | TON | 300.00 | 194,280.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 23,968 | SQYD | 3.50 | 83,888.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 141 | SQYD | 195.00 | 27,495.00 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 480 | LNFT | 300.00 | 144,000.00 | | 0022 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 80 | LNFT | 430.00 | 34,400.00 | | 0023 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 465.00 | 18,600.00 | | 0024 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 264 | LNFT | 485.00 | 128,040.00 | | 0025 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 64 | LNFT | 785.00 | 50,240.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 204 | LNFT | 1.00 | 204.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 375,000.00 | 375,000.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 128 | LNFT | 1.00 | 128.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.91 | MILE | 340.00 | 3,029.40 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.967 | MILE | 680.00 | 2,697.56 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 41.97 | MILE | 1,000.00 | 41,970.00 | | 0032 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 10,000.00 | 40,000.00 | | 0033 | 724-01-00100 | Rumble Strips (Centerline) | 1.635 | MILE | 305.00 | 498.68 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.27 | MILE | 305.00 | 997.35 | | 0035 | 726-01-00100 | Bedding Material | 201.6 | CUYD | 1.00 | 201.60 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 385,000.00 | 385,000.00 | | 0037 | 729-16-00200 | Object Marker Assembly (Type 2) | 44 | EACH | 84.00 | 3,696.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,275 | EACH | 6.75 | 15,356.25 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 52 | LNFT | 25.00 | 1,300.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.723 | MILE | 5,600.00 | 88,048.80 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.641 | MILE | 1,350.00 | 2,215.35 | | 0042 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.101 | MILE | 9,000.00 | 909.00 | | 0043 | 735-01-00100 | Mailboxes | 61 | EACH | 22.50 | 1,372.50 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 61 | EACH | 280.00 | 17,080.00 | | 0045 | 739-01-00100 | Hydro-Seeding | 1.62 | ACRE | 4,900.00 | 7,938.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,158 | INLF | 0.01 | 31.58 | | 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 180 | INLF | 0.01 | 1.80 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,997,580.82 |
|