Proposal:H.014822.6
Parish:Tangipahoa
Routes:US 51
Description:US 51: US 190 - LA 3234
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTOR, AND RELATED WORK.
Estimated Construction Cost:$2,306,575.51
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $2,285,258.69 |
| 2 | 73475 | Madden Gulf Coast, LLC | $2,523,420.20 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $4,008,904.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 73 | LNFT | 52.00 | 3,796.00 | 26.00 | 1,898.00 | 35.00 | 2,555.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 200.00 | 10,000.00 | 175.00 | 8,750.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 8,482.4 | TON | 135.00 | 1,145,124.00 | 149.00 | 1,263,877.60 | 275.00 | 2,332,660.00 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 133.1 | TON | 230.00 | 30,613.00 | 640.00 | 85,184.00 | 450.00 | 59,895.00 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 44,504 | SQYD | 5.00 | 222,520.00 | 6.00 | 267,024.00 | 9.00 | 400,536.00 | | 0006 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 293.4 | SQYD | 100.00 | 29,340.00 | 150.00 | 44,010.00 | 275.00 | 80,685.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 87.9 | SQYD | 160.00 | 14,064.00 | 150.00 | 13,185.00 | 275.00 | 24,172.50 | | 0010 | 602-10-00100 | Longitudinal Shoulder Joints | 13,150 | LNFT | 2.75 | 36,162.50 | 2.00 | 26,300.00 | 4.00 | 52,600.00 | | 0011 | 702-04-00100 | Adjusting Manholes | 7 | EACH | 1,500.00 | 10,500.00 | 500.00 | 3,500.00 | 4,000.00 | 28,000.00 | | 0012 | 706-04-00110 | Curb Ramps Type 2 | 10.4 | SQYD | 300.00 | 3,120.00 | 500.00 | 5,200.00 | 550.00 | 5,720.00 | | 0013 | 706-04-00110 | Curb Ramps Type 4 | 17.9 | SQYD | 300.00 | 5,370.00 | 450.00 | 8,055.00 | 550.00 | 9,845.00 | | 0014 | 706-04-00110 | Curb Ramps Type 8 | 15.5 | SQYD | 300.00 | 4,650.00 | 450.00 | 6,975.00 | 550.00 | 8,525.00 | | 0015 | 707-01-00100 | Concrete Curb | 73 | LNFT | 120.00 | 8,760.00 | 125.00 | 9,125.00 | 125.00 | 9,125.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 205,000.00 | 205,000.00 | 195,000.00 | 195,000.00 | 225,000.00 | 225,000.00 | | 0017 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,744 | LNFT | 0.01 | 37.44 | 1.00 | 3,744.00 | 1.50 | 5,616.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,896 | LNFT | 0.01 | 18.96 | 2.00 | 3,792.00 | 3.50 | 6,636.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.72 | MILE | 0.01 | 0.13 | 500.00 | 6,360.00 | 850.00 | 10,812.00 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.81 | MILE | 0.01 | 0.16 | 100.00 | 1,581.00 | 2,000.00 | 31,620.00 | | 0021 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 6 | EACH | 0.01 | 0.06 | 50.00 | 300.00 | 100.00 | 600.00 | | 0022 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 0.01 | 0.06 | 25.00 | 150.00 | 100.00 | 600.00 | | 0023 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 132 | EACH | 0.01 | 1.32 | 25.00 | 3,300.00 | 100.00 | 13,200.00 | | 0024 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 0.01 | 0.06 | 25.00 | 150.00 | 100.00 | 600.00 | | 0025 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 12 | EACH | 50.00 | 600.00 | 25.00 | 300.00 | 100.00 | 1,200.00 | | 0026 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 8,500.00 | 51,000.00 | 3,800.00 | 22,800.00 | 7,500.00 | 45,000.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 250,000.00 | 250,000.00 | 240,000.00 | 240,000.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 660 | EACH | 8.00 | 5,280.00 | 10.00 | 6,600.00 | 15.00 | 9,900.00 | | 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 632 | LNFT | 20.00 | 12,640.00 | 25.00 | 15,800.00 | 35.00 | 22,120.00 | | 0030 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 172 | LNFT | 3.00 | 516.00 | 4.00 | 688.00 | 6.00 | 1,032.00 | | 0031 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,120 | LNFT | 3.00 | 3,360.00 | 5.00 | 5,600.00 | 7.00 | 7,840.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.27 | MILE | 6,000.00 | 31,620.00 | 6,500.00 | 34,255.00 | 10,000.00 | 52,700.00 | | 0033 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.24 | MILE | 41,000.00 | 9,840.00 | 25,000.00 | 6,000.00 | 45,000.00 | 10,800.00 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.24 | MILE | 1,500.00 | 6,360.00 | 2,000.00 | 8,480.00 | 2,750.00 | 11,660.00 | | 0035 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 600.00 | 1,200.00 | 450.00 | 900.00 | 600.00 | 1,200.00 | | 0036 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 600.00 | 1,200.00 | 500.00 | 1,000.00 | 600.00 | 1,200.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 44 | EACH | 485.00 | 21,340.00 | 400.00 | 17,600.00 | 600.00 | 26,400.00 | | 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 615.00 | 1,230.00 | 400.00 | 800.00 | 600.00 | 1,200.00 | | 0039 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 1,225.00 | 4,900.00 | 800.00 | 3,200.00 | 600.00 | 2,400.00 | | 0040 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 16.00 | 320.00 | 15.35 | 307.00 | 35.00 | 700.00 | | 0041 | 736-09-00100 | Loop Detector | 3,900 | LNFT | 30.75 | 119,925.00 | 26.62 | 103,818.00 | 45.00 | 175,500.00 | | 0042 | 736-10-00200 | Underground Junction Box (Type E) | 4 | EACH | 1,500.00 | 6,000.00 | 1,132.00 | 4,528.00 | 1,750.00 | 7,000.00 | | 0043 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 6.50 | 130.00 | 11.68 | 233.60 | 20.00 | 400.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.3 | ACRE | 10,000.00 | 3,000.00 | 10,000.00 | 3,000.00 | 15,000.00 | 4,500.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0049 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 3,840 | SQYD | 8.00 | 30,720.00 | 7.50 | 28,800.00 | 10.00 | 38,400.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,285,258.69 | | 2,523,420.20 | | 4,008,904.50 |
|