Proposal:H.013938.6-R2
Parish:Tangipahoa
Routes:LA 3234
Description:LA 3234 UNIVERSITY AVE SIDEWALKS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, BRIDGE REPAIRS, SIDEWALKS AND RELATED WORK.
Estimated Construction Cost:$2,681,535.60
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $3,026,341.51 |
| 2 | 28190 | Buck Town Contractors & Co. | $3,374,554.63 |
| 3 | 48896 | Command Construction Industries LLC | $3,837,049.50 |
| 4 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $4,112,863.82 |
| 5 | 12198 | Byron E. Talbot Contractor, Inc. | $4,521,143.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - Buck Town Contractors & Co. | - 3 - Command Construction Industries LLC | - 4 - BEVERLY CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 56,000.00 | 56,000.00 | 100,000.00 | 100,000.00 | 7,820.00 | 7,820.00 | | 0002 | 202-02-00010 | Removal of Portion of Wingwall | 2 | EACH | 7,000.00 | 14,000.00 | 2,700.00 | 5,400.00 | 2,000.00 | 4,000.00 | 3,159.00 | 6,318.00 | | 0003 | 202-02-00030 | Removal of Barrier Railing | 280 | LNFT | 95.00 | 26,600.00 | 66.00 | 18,480.00 | 225.00 | 63,000.00 | 483.00 | 135,240.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 135 | SQYD | 35.00 | 4,725.00 | 15.00 | 2,025.00 | 50.00 | 6,750.00 | 28.00 | 3,780.00 | | 0005 | 202-02-04505 | Removal of Bridge Deck (Full Depth) (Slab Span) | 2,216.7 | SQFT | 35.00 | 77,584.50 | 89.00 | 197,286.30 | 75.00 | 166,252.50 | 91.20 | 202,163.04 | | 0006 | 202-02-06000 | Removal of Concrete Approach Slabs | 240.6 | SQYD | 125.00 | 30,075.00 | 27.00 | 6,496.20 | 50.00 | 12,030.00 | 148.00 | 35,608.80 | | 0007 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 1,000.00 | 8,000.00 | 900.00 | 7,200.00 | 500.00 | 4,000.00 | 1,900.00 | 15,200.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,489 | SQYD | 31.50 | 109,903.50 | 22.00 | 76,758.00 | 50.00 | 174,450.00 | 19.50 | 68,035.50 | | 0009 | 202-02-06140 | Removal of Curbs (Concrete) | 498 | LNFT | 20.00 | 9,960.00 | 12.00 | 5,976.00 | 25.00 | 12,450.00 | 14.00 | 6,972.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 125 | LNFT | 15.00 | 1,875.00 | 9.00 | 1,125.00 | 10.00 | 1,250.00 | 21.00 | 2,625.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 12" | 169 | LNFT | 45.00 | 7,605.00 | 32.00 | 5,408.00 | 50.00 | 8,450.00 | 38.00 | 6,422.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 125,000.00 | 125,000.00 | 62,800.00 | 62,800.00 | 100,000.00 | 100,000.00 | 44,900.00 | 44,900.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 92 | CUYD | 75.00 | 6,900.00 | 62.00 | 5,704.00 | 50.00 | 4,600.00 | 26.00 | 2,392.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 32 | EACH | 20.00 | 640.00 | 20.00 | 640.00 | 25.00 | 800.00 | 32.00 | 1,024.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 11,510 | LNFT | 0.01 | 115.10 | 2.00 | 23,020.00 | 5.00 | 57,550.00 | 2.25 | 25,897.50 | | 0016 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 191 | LNFT | 150.00 | 28,650.00 | 96.00 | 18,336.00 | 250.00 | 47,750.00 | 118.00 | 22,538.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 6,250.00 | 50,000.00 | 4,325.00 | 34,600.00 | 10,000.00 | 80,000.00 | 5,020.00 | 40,160.00 | | 0018 | 702-04-00210 | Convert Catch Basins to Manholes | 4 | EACH | 7,000.00 | 28,000.00 | 3,700.00 | 14,800.00 | 2,500.00 | 10,000.00 | 4,100.00 | 16,400.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 4,871.7 | SQYD | 80.00 | 389,736.00 | 79.00 | 384,864.30 | 90.00 | 438,453.00 | 77.00 | 375,120.90 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 3,120 | SQYD | 80.00 | 249,600.00 | 157.00 | 489,840.00 | 125.00 | 390,000.00 | 93.65 | 292,188.00 | | 0021 | 706-04-00110 | Curb Ramps Type 7 | 93 | SQYD | 300.00 | 27,900.00 | 286.00 | 26,598.00 | 225.00 | 20,925.00 | 175.00 | 16,275.00 | | 0022 | 706-04-00110 | Curb Ramps Type 8 | 26.6 | SQYD | 300.00 | 7,980.00 | 265.00 | 7,049.00 | 225.00 | 5,985.00 | 195.00 | 5,187.00 | | 0023 | 707-01-00100 | Concrete Curb | 1,206 | LNFT | 35.00 | 42,210.00 | 35.00 | 42,210.00 | 10.00 | 12,060.00 | 36.00 | 43,416.00 | | 0024 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 126 | SQYD | 100.00 | 12,600.00 | 160.00 | 20,160.00 | 175.00 | 22,050.00 | 444.00 | 55,944.00 | | 0025 | 712-04-00100 | Flexible Revetment | 300 | SQYD | 100.00 | 30,000.00 | 131.00 | 39,300.00 | 175.00 | 52,500.00 | 96.00 | 28,800.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 375,000.00 | 375,000.00 | 168,700.00 | 168,700.00 | 100,000.00 | 100,000.00 | 92,625.00 | 92,625.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 4,320 | LNFT | 4.00 | 17,280.00 | 4.50 | 19,440.00 | 4.00 | 17,280.00 | 4.44 | 19,180.80 | | 0028 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.912 | MILE | 5,500.00 | 10,516.00 | 6,250.00 | 11,950.00 | 6,000.00 | 11,472.00 | 6,107.00 | 11,676.58 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.363 | MILE | 9,500.00 | 41,448.50 | 10,800.00 | 47,120.40 | 10,000.00 | 43,630.00 | 10,550.00 | 46,029.65 | | 0030 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,314 | EACH | 6.50 | 8,541.00 | 7.40 | 9,723.60 | 10.00 | 13,140.00 | 7.25 | 9,526.50 | | 0031 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 31 | EACH | 2,200.00 | 68,200.00 | 2,850.00 | 88,350.00 | 2,000.00 | 62,000.00 | 2,150.00 | 66,650.00 | | 0032 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 31 | EACH | 650.00 | 20,150.00 | 400.00 | 12,400.00 | 500.00 | 15,500.00 | 395.00 | 12,245.00 | | 0033 | 726-01-00100 | Bedding Material | 49.3 | CUYD | 1.00 | 49.30 | 225.00 | 11,092.50 | 50.00 | 2,465.00 | 162.00 | 7,986.60 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 425,000.00 | 425,000.00 | 302,400.00 | 302,400.00 | 380,000.00 | 380,000.00 | 365,000.00 | 365,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 170.00 | 680.00 | 500.00 | 2,000.00 | 106.00 | 424.00 | | 0036 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 28 | EACH | 20.00 | 560.00 | 23.00 | 644.00 | 10.00 | 280.00 | 22.00 | 616.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 288 | EACH | 7.00 | 2,016.00 | 8.00 | 2,304.00 | 10.00 | 2,880.00 | 7.80 | 2,246.40 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 504 | LNFT | 12.50 | 6,300.00 | 14.00 | 7,056.00 | 15.00 | 7,560.00 | 13.85 | 6,980.40 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.912 | MILE | 5,280.00 | 10,095.36 | 6,025.00 | 11,519.80 | 6,000.00 | 11,472.00 | 5,863.00 | 11,210.06 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.912 | MILE | 2,500.00 | 4,780.00 | 2,840.00 | 5,430.08 | 3,000.00 | 5,736.00 | 2,776.00 | 5,307.71 | | 0041 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 350.00 | 3,500.00 | 400.00 | 4,000.00 | 400.00 | 4,000.00 | 390.00 | 3,900.00 | | 0042 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 350.00 | 3,500.00 | 400.00 | 4,000.00 | 400.00 | 4,000.00 | 390.00 | 3,900.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.525 | MILE | 5,000.00 | 2,625.00 | 5,800.00 | 3,045.00 | 10,000.00 | 5,250.00 | 5,558.00 | 2,917.95 | | 0044 | 735-01-00100 | Mailboxes | 7 | EACH | 22.00 | 154.00 | 115.00 | 805.00 | 30.00 | 210.00 | 50.00 | 350.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 250.00 | 1,750.00 | 170.00 | 1,190.00 | 300.00 | 2,100.00 | 165.00 | 1,155.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 2.12 | ACRE | 3,850.00 | 8,162.00 | 4,300.00 | 9,116.00 | 3,500.00 | 7,420.00 | 4,169.00 | 8,838.28 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 34,200.00 | 34,200.00 | 100,000.00 | 100,000.00 | 16,365.00 | 16,365.00 | | 0048 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,161 | SQFT | 3.00 | 6,483.00 | 1.30 | 2,809.30 | 1.00 | 2,161.00 | 8.80 | 19,016.80 | | 0049 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,085 | SQFT | 7.00 | 21,595.00 | 1.30 | 4,010.50 | 4.00 | 12,340.00 | 8.70 | 26,839.50 | | 0050 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice 6" | 935 | EACH | 100.00 | 93,500.00 | 44.00 | 41,140.00 | 50.00 | 46,750.00 | 86.00 | 80,410.00 | | 0051 | 810-03-00100 | Concrete and Metal Bridge Railing | 435 | LNFT | 265.00 | 115,275.00 | 461.00 | 200,535.00 | 435.00 | 189,225.00 | 597.00 | 259,695.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,302 | SQFT | 110.00 | 143,220.00 | 97.00 | 126,294.00 | 175.00 | 227,850.00 | 179.00 | 233,058.00 | | 0053 | 815-03-00300 | Joint Seal (Poured) | 162 | LNFT | 30.00 | 4,860.00 | 28.50 | 4,617.00 | 30.00 | 4,860.00 | 11.20 | 1,814.40 | | 0054 | 830-01-00100 | Bridge Superstructure Repair | 7 | EACH | 31,000.00 | 217,000.00 | 94,000.00 | 658,000.00 | 100,000.00 | 700,000.00 | 159,850.00 | 1,118,950.00 | | 0055 | 830-07-00100 | Structural Concrete Patching | 25 | SQFT | 600.00 | 15,000.00 | 540.00 | 13,500.00 | 500.00 | 12,500.00 | 2,065.00 | 51,625.00 | | 0056 | 830-10-00100 | Epoxy Injection | 100 | LNFT | 300.00 | 30,000.00 | 29.00 | 2,900.00 | 250.00 | 25,000.00 | 1,492.00 | 149,200.00 | | 0057 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 571 | INLF | 2.25 | 1,284.75 | 1.15 | 656.65 | 3.00 | 1,713.00 | 0.95 | 542.45 | | 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,150 | INLF | 2.25 | 4,837.50 | 1.20 | 2,580.00 | 3.00 | 6,450.00 | 1.00 | 2,150.00 | | 0059 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 10,000.00 | 10,000.00 | 9,700.00 | 9,700.00 | 12,500.00 | 12,500.00 | 11,225.00 | 11,225.00 | | 0060 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 1 | EACH | 3,500.00 | 3,500.00 | 570.00 | 570.00 | 2,000.00 | 2,000.00 | 2,780.00 | 2,780.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,026,341.51 | | 3,374,554.63 | | 3,837,049.50 | | 4,112,863.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Byron E. Talbot Contractor, Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 22,500.00 | 22,500.00 | | 0002 | 202-02-00010 | Removal of Portion of Wingwall | 2 | EACH | 3,500.00 | 7,000.00 | | 0003 | 202-02-00030 | Removal of Barrier Railing | 280 | LNFT | 515.00 | 144,200.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 135 | SQYD | 46.00 | 6,210.00 | | 0005 | 202-02-04505 | Removal of Bridge Deck (Full Depth) (Slab Span) | 2,216.7 | SQFT | 90.50 | 200,611.35 | | 0006 | 202-02-06000 | Removal of Concrete Approach Slabs | 240.6 | SQYD | 146.50 | 35,247.90 | | 0007 | 202-02-06060 | Removal of Concrete Catch Basin | 8 | EACH | 600.00 | 4,800.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,489 | SQYD | 27.00 | 94,203.00 | | 0009 | 202-02-06140 | Removal of Curbs (Concrete) | 498 | LNFT | 5.00 | 2,490.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 125 | LNFT | 16.50 | 2,062.50 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 12" | 169 | LNFT | 16.00 | 2,704.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 107,000.00 | 107,000.00 | | 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 92 | CUYD | 45.00 | 4,140.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 32 | EACH | 165.00 | 5,280.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 11,510 | LNFT | 2.30 | 26,473.00 | | 0016 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 191 | LNFT | 120.00 | 22,920.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 5,500.00 | 44,000.00 | | 0018 | 702-04-00210 | Convert Catch Basins to Manholes | 4 | EACH | 3,500.00 | 14,000.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 4,871.7 | SQYD | 80.00 | 389,736.00 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 3,120 | SQYD | 150.00 | 468,000.00 | | 0021 | 706-04-00110 | Curb Ramps Type 7 | 93 | SQYD | 415.00 | 38,595.00 | | 0022 | 706-04-00110 | Curb Ramps Type 8 | 26.6 | SQYD | 415.00 | 11,039.00 | | 0023 | 707-01-00100 | Concrete Curb | 1,206 | LNFT | 20.00 | 24,120.00 | | 0024 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 126 | SQYD | 428.00 | 53,928.00 | | 0025 | 712-04-00100 | Flexible Revetment | 300 | SQYD | 95.00 | 28,500.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 4,320 | LNFT | 3.00 | 12,960.00 | | 0028 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.912 | MILE | 11,000.00 | 21,032.00 | | 0029 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.363 | MILE | 27,500.00 | 119,982.50 | | 0030 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,314 | EACH | 13.75 | 18,067.50 | | 0031 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 31 | EACH | 2,500.00 | 77,500.00 | | 0032 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 31 | EACH | 950.00 | 29,450.00 | | 0033 | 726-01-00100 | Bedding Material | 49.3 | CUYD | 155.00 | 7,641.50 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | | 0036 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 28 | EACH | 27.50 | 770.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 288 | EACH | 16.50 | 4,752.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 504 | LNFT | 27.50 | 13,860.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.912 | MILE | 8,250.00 | 15,774.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.912 | MILE | 2,200.00 | 4,206.40 | | 0041 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 440.00 | 4,400.00 | | 0042 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 440.00 | 4,400.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.525 | MILE | 27,500.00 | 14,437.50 | | 0044 | 735-01-00100 | Mailboxes | 7 | EACH | 22.00 | 154.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 275.00 | 1,925.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 2.12 | ACRE | 5,000.00 | 10,600.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | | 0048 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,161 | SQFT | 8.70 | 18,800.70 | | 0049 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,085 | SQFT | 8.70 | 26,839.50 | | 0050 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice 6" | 935 | EACH | 85.40 | 79,849.00 | | 0051 | 810-03-00100 | Concrete and Metal Bridge Railing | 435 | LNFT | 591.00 | 257,085.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,302 | SQFT | 177.10 | 230,584.20 | | 0053 | 815-03-00300 | Joint Seal (Poured) | 162 | LNFT | 11.10 | 1,798.20 | | 0054 | 830-01-00100 | Bridge Superstructure Repair | 7 | EACH | 158,200.00 | 1,107,400.00 | | 0055 | 830-07-00100 | Structural Concrete Patching | 25 | SQFT | 2,050.00 | 51,250.00 | | 0056 | 830-10-00100 | Epoxy Injection | 100 | LNFT | 1,500.00 | 150,000.00 | | 0057 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 571 | INLF | 1.20 | 685.20 | | 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,150 | INLF | 28.60 | 61,490.00 | | 0059 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 10,500.00 | 10,500.00 | | 0060 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 1 | EACH | 2,750.00 | 2,750.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,521,143.95 |
|