Proposal:H.015604.6
Parish:Assumption
Routes:LA 3199-P
Description:PEAR ST AT LA 1: DRAINAGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BULKHEAD, BORROW, DRAINAGE STRUCTURES, CONCRETE BOX CULVERT HEADWALL AND RELATED WORK.
Estimated Construction Cost:$934,773.00
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $776,588.90 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $909,229.00 |
| 3 | 34263 | La Contracting Enterprise LLC | $1,113,879.20 |
| 4 | 46747 | Triumph Construction, LLC | $1,227,000.00 |
| 5 | 64911 | Bentz Construction Group, LLC | $1,263,596.50 |
| 6 | 07764 | Grady Crawford Const. Co., Inc. of Baton Rouge | $1,278,138.30 |
| 7 | 69770 | Omega Foundation Services | $1,297,610.00 |
| 8 | 44187 | Impetus Infrastructure LLC | $1,600,295.60 |
| 9 | 52306 | SIEMA CONSTRUCTION, LLC | $1,908,594.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - La Contracting Enterprise LLC | - 4 - Triumph Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 45,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | 41,000.00 | 41,000.00 | 73,000.00 | 73,000.00 | | 0002 | 202-02-00050 | Removal of TIMBER BULKHEAD | 1 | LUMP | 3,000.00 | 3,000.00 | 16,500.00 | 16,500.00 | 15,000.00 | 15,000.00 | 58,000.00 | 58,000.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall 33'-4" X 8'-10" | 1 | EACH | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | 11,500.00 | 11,500.00 | 25,000.00 | 25,000.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP, 12" PP | 60 | LNFT | 15.00 | 900.00 | 15.00 | 900.00 | 66.00 | 3,960.00 | 53.33 | 3,199.80 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 12" RPVCCP | 20 | LNFT | 15.00 | 300.00 | 17.00 | 340.00 | 37.00 | 740.00 | 53.30 | 1,066.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,722 | CUYD | 25.00 | 118,050.00 | 24.00 | 113,328.00 | 42.00 | 198,324.00 | 68.18 | 321,945.96 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 15 | CUYD | 125.00 | 1,875.00 | 185.00 | 2,775.00 | 193.00 | 2,895.00 | 279.33 | 4,189.95 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28 | SQYD | 250.00 | 7,000.00 | 350.00 | 9,800.00 | 432.00 | 12,096.00 | 186.72 | 5,228.16 | | 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 64 | LNFT | 265.00 | 16,960.00 | 165.00 | 10,560.00 | 199.00 | 12,736.00 | 130.16 | 8,330.24 | | 0010 | 701-01-01121 | Cross Drain Pipe (60" RCP/CPPPDW/CPPPTW) CPPPDW ONLY | 1,000 | LNFT | 330.00 | 330,000.00 | 400.00 | 400,000.00 | 485.00 | 485,000.00 | 344.14 | 344,140.00 | | 0011 | 701-05-01066 | Side Drain Pipe (24" RCP) | 24 | LNFT | 300.00 | 7,200.00 | 165.00 | 3,960.00 | 153.00 | 3,672.00 | 210.00 | 5,040.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 25.00 | 1,600.00 | 6.50 | 416.00 | 35.00 | 2,240.00 | 58.59 | 3,749.76 | | 0013 | 702-02-00900 | Manholes (MH-14X Open) | 3 | EACH | 15,500.00 | 46,500.00 | 30,000.00 | 90,000.00 | 18,000.00 | 54,000.00 | 25,216.67 | 75,650.01 | | 0014 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 67 | SQYD | 175.00 | 11,725.00 | 250.00 | 16,750.00 | 250.00 | 16,750.00 | 221.34 | 14,829.78 | | 0015 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 3.00 | 201.00 | 2.50 | 167.50 | 19.00 | 1,273.00 | 32.24 | 2,160.08 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 7,500.00 | 7,500.00 | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | | 0017 | 726-01-00100 | Bedding Material | 589.9 | CUYD | 1.00 | 589.90 | 175.00 | 103,232.50 | 220.00 | 129,778.00 | 78.62 | 46,377.94 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 40,000.00 | 40,000.00 | 51,000.00 | 51,000.00 | 159,792.32 | 159,792.32 | | 0019 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 125.00 | 500.00 | 300.00 | 1,200.00 | 89.00 | 356.00 | 97.50 | 390.00 | | 0020 | 739-01-00100 | Hydro-Seeding | 0.344 | ACRE | 2,000.00 | 688.00 | 12,500.00 | 4,300.00 | 11,800.00 | 4,059.20 | 3,866.28 | 1,330.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 6,120.00 | 6,120.00 | | 0022 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (STEEL=1105 LBS) (CONCRETE=17.49 CUYD) | 1 | EACH | 39,000.00 | 39,000.00 | 30,000.00 | 30,000.00 | 43,000.00 | 43,000.00 | 42,460.00 | 42,460.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 776,588.90 | | 909,229.00 | | 1,113,879.20 | | 1,227,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Bentz Construction Group, LLC | - 6 - Grady Crawford Const. Co., Inc. of Baton Rouge | - 7 - Omega Foundation Services | - 8 - Impetus Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 52,116.00 | 52,116.00 | 100,000.00 | 100,000.00 | | 0002 | 202-02-00050 | Removal of TIMBER BULKHEAD | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 10,700.00 | 10,700.00 | 57,000.00 | 57,000.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall 33'-4" X 8'-10" | 1 | EACH | 40,000.00 | 40,000.00 | 51,500.00 | 51,500.00 | 24,050.00 | 24,050.00 | 33,000.00 | 33,000.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP, 12" PP | 60 | LNFT | 30.00 | 1,800.00 | 154.00 | 9,240.00 | 162.55 | 9,753.00 | 26.00 | 1,560.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 12" RPVCCP | 20 | LNFT | 30.00 | 600.00 | 50.00 | 1,000.00 | 161.85 | 3,237.00 | 31.00 | 620.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,722 | CUYD | 47.00 | 221,934.00 | 60.50 | 285,681.00 | 48.00 | 226,656.00 | 39.00 | 184,158.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 15 | CUYD | 225.00 | 3,375.00 | 165.00 | 2,475.00 | 101.00 | 1,515.00 | 201.00 | 3,015.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28 | SQYD | 250.00 | 7,000.00 | 183.00 | 5,124.00 | 178.00 | 4,984.00 | 220.00 | 6,160.00 | | 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 64 | LNFT | 275.00 | 17,600.00 | 215.00 | 13,760.00 | 335.50 | 21,472.00 | 331.00 | 21,184.00 | | 0010 | 701-01-01121 | Cross Drain Pipe (60" RCP/CPPPDW/CPPPTW) CPPPDW ONLY | 1,000 | LNFT | 525.00 | 525,000.00 | 535.00 | 535,000.00 | 564.00 | 564,000.00 | 680.00 | 680,000.00 | | 0011 | 701-05-01066 | Side Drain Pipe (24" RCP) | 24 | LNFT | 200.00 | 4,800.00 | 201.50 | 4,836.00 | 460.00 | 11,040.00 | 437.00 | 10,488.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 1.00 | 64.00 | 117.00 | 7,488.00 | 320.50 | 20,512.00 | 136.00 | 8,704.00 | | 0013 | 702-02-00900 | Manholes (MH-14X Open) | 3 | EACH | 20,000.00 | 60,000.00 | 20,750.00 | 62,250.00 | 25,715.00 | 77,145.00 | 28,000.00 | 84,000.00 | | 0014 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 67 | SQYD | 300.00 | 20,100.00 | 400.00 | 26,800.00 | 260.00 | 17,420.00 | 391.00 | 26,197.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 10.00 | 670.00 | 12.50 | 837.50 | 27.00 | 1,809.00 | 3.00 | 201.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 27,335.00 | 27,335.00 | 23,150.00 | 23,150.00 | | 0017 | 726-01-00100 | Bedding Material | 589.9 | CUYD | 245.00 | 144,525.50 | 52.00 | 30,674.80 | 95.00 | 56,040.50 | 190.00 | 112,081.00 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 66,000.00 | 66,000.00 | 107,500.00 | 107,500.00 | 47,868.50 | 47,868.50 | 143,500.00 | 143,500.00 | | 0019 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 243.50 | 974.00 | 245.00 | 980.00 | | 0020 | 739-01-00100 | Hydro-Seeding | 0.344 | ACRE | 12,000.00 | 4,128.00 | 13,000.00 | 4,472.00 | 12,000.00 | 4,128.00 | 15,400.00 | 5,297.60 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 34,855.00 | 34,855.00 | 26,000.00 | 26,000.00 | | 0022 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (STEEL=1105 LBS) (CONCRETE=17.49 CUYD) | 1 | EACH | 45,000.00 | 45,000.00 | 48,500.00 | 48,500.00 | 80,000.00 | 80,000.00 | 73,000.00 | 73,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,263,596.50 | | 1,278,138.30 | | 1,297,610.00 | | 1,600,295.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,410.50 | 20,410.50 | | 0002 | 202-02-00050 | Removal of TIMBER BULKHEAD | 1 | LUMP | 26,900.00 | 26,900.00 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall 33'-4" X 8'-10" | 1 | EACH | 6,000.00 | 6,000.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" CMP, 12" PP | 60 | LNFT | 58.00 | 3,480.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 12" RPVCCP | 20 | LNFT | 18.50 | 370.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,722 | CUYD | 106.00 | 500,532.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 15 | CUYD | 233.00 | 3,495.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28 | SQYD | 250.00 | 7,000.00 | | 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 64 | LNFT | 200.00 | 12,800.00 | | 0010 | 701-01-01121 | Cross Drain Pipe (60" RCP/CPPPDW/CPPPTW) CPPPDW ONLY | 1,000 | LNFT | 712.00 | 712,000.00 | | 0011 | 701-05-01066 | Side Drain Pipe (24" RCP) | 24 | LNFT | 136.00 | 3,264.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 107.00 | 6,848.00 | | 0013 | 702-02-00900 | Manholes (MH-14X Open) | 3 | EACH | 59,522.00 | 178,566.00 | | 0014 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 67 | SQYD | 213.00 | 14,271.00 | | 0015 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 14.50 | 971.50 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,520.00 | 9,520.00 | | 0017 | 726-01-00100 | Bedding Material | 589.9 | CUYD | 324.00 | 191,127.60 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 131,000.00 | 131,000.00 | | 0019 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 90.50 | 362.00 | | 0020 | 739-01-00100 | Hydro-Seeding | 0.344 | ACRE | 18,100.00 | 6,226.40 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,150.00 | 10,150.00 | | 0022 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (STEEL=1105 LBS) (CONCRETE=17.49 CUYD) | 1 | EACH | 63,300.00 | 63,300.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,908,594.00 |
|