Proposal:H.015296.6
Parish:Jefferson, Lafourche, Terrebonne
Routes:LA 56, US 90, US 90 BUS
Description:DISTRICT 02 APPR SLAB LEVELING PHASE 4
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$563,395.48
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $722,434.50 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,033,918.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 370.4 | SQYD | 30.00 | 11,112.00 | 80.00 | 29,632.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 700.1 | LNFT | 25.00 | 17,502.50 | 13.50 | 9,451.35 | | 0003 | 203-01-00100 | General Excavation | 49 | CUYD | 125.00 | 6,125.00 | 350.00 | 17,150.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 98 | CUYD | 150.00 | 14,700.00 | 300.00 | 29,400.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 271.6 | TON | 530.00 | 143,948.00 | 1,075.00 | 291,970.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 91.5 | TON | 530.00 | 48,495.00 | 1,250.00 | 114,375.00 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 1,223 | SQYD | 35.00 | 42,805.00 | 40.00 | 48,920.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -56 | CUYD | 0.00 | 0.00 | 0.10 | -5.60 | | 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 93 | SQYD | 500.00 | 46,500.00 | 585.00 | 54,405.00 | | 0010 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 45.00 | 1,408.50 | 48.00 | 1,502.40 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 131.3 | LNFT | 45.00 | 5,908.50 | 48.00 | 6,302.40 | | 0012 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 160.00 | 1,008.00 | 170.00 | 1,071.00 | | 0013 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 93.8 | LNFT | 160.00 | 15,008.00 | 170.00 | 15,946.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 165.00 | 33,000.00 | 175.00 | 35,000.00 | | 0015 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 5,500.00 | 38,500.00 | 5,400.00 | 37,800.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 84,000.00 | 84,000.00 | 100,000.00 | 100,000.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.48 | MILE | 450.00 | 216.00 | 680.00 | 326.40 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.48 | MILE | 1,500.00 | 720.00 | 680.00 | 326.40 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.872 | MILE | 2,500.00 | 4,680.00 | 600.00 | 1,123.20 | | 0020 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 6,000.00 | 12,000.00 | 2,000.00 | 4,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 15,000.00 | 3,000.00 | 45,000.00 | 9,000.00 | | 0022 | 717-01-00100 | Seeding | 4 | LB | 250.00 | 1,000.00 | 350.00 | 1,400.00 | | 0023 | 718-01-00100 | Fertilizer | 40 | LB | 12.00 | 480.00 | 15.00 | 600.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 100,000.00 | 100,000.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 135.00 | 1,080.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 120 | EACH | 125.00 | 15,000.00 | 16.25 | 1,950.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.936 | MILE | 25,000.00 | 23,400.00 | 16,000.00 | 14,976.00 | | 0028 | 732-05-00100 | Removal of Existing Markings | 0.11 | MILE | 25,000.00 | 2,750.00 | 27,000.00 | 2,970.00 | | 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0030 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 792 | INLF | 4.00 | 3,168.00 | 4.10 | 3,247.20 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 722,434.50 | | 1,033,918.75 |
|