Proposal:H.015266.6
Parish:Rapides
Routes:LA 28
Description:LA 28: R-CUT AT ST CLAIR RD
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE ROADWAY, AND RELATED WORK.
Estimated Construction Cost:$1,363,267.20
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $1,338,096.58 |
| 2 | 55505 | MERRICK, LLC | $1,644,867.70 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $1,724,106.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - MERRICK, LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 3,075.9 | SQYD | 15.00 | 46,138.50 | 10.00 | 30,759.00 | 22.00 | 67,669.80 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 2,500.00 | 5,000.00 | 700.00 | 1,400.00 | 2,300.00 | 4,600.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) Removal of RCP for relocation of new Catch Basins. | 8 | LNFT | 500.00 | 4,000.00 | 150.00 | 1,200.00 | 500.00 | 4,000.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 109,000.00 | 109,000.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 18 | EACH | 50.00 | 900.00 | 80.00 | 1,440.00 | 50.00 | 900.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 21 | EACH | 173.00 | 3,633.00 | 250.00 | 5,250.00 | 230.00 | 4,830.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,420 | LNFT | 4.50 | 6,390.00 | 3.00 | 4,260.00 | 3.00 | 4,260.00 | | 0009 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 5,692.3 | SQYD | 24.00 | 136,615.20 | 35.00 | 199,230.50 | 50.00 | 284,615.00 | | 0010 | 304-01-00100 | Lime | 40.34 | TON | 250.00 | 10,085.00 | 340.00 | 13,715.60 | 380.00 | 15,329.20 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 2,846.2 | SQYD | 5.00 | 14,231.00 | 2.50 | 7,115.50 | 13.00 | 37,000.60 | | 0012 | 502-01-00100 | Asphalt Concrete | 2,279.7 | TON | 215.00 | 490,135.50 | 210.00 | 478,737.00 | 200.00 | 455,940.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 1,842 | SQYD | 20.00 | 36,840.00 | 15.00 | 27,630.00 | 30.00 | 55,260.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -165 | CUYD | 1.00 | -165.00 | 0.10 | -16.50 | 1.00 | -165.00 | | 0015 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 4 | LNFT | 600.00 | 2,400.00 | 450.00 | 1,800.00 | 1,300.00 | 5,200.00 | | 0016 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 4 | LNFT | 750.00 | 3,000.00 | 650.00 | 2,600.00 | 1,500.00 | 6,000.00 | | 0017 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 40 | LNFT | 200.00 | 8,000.00 | 250.00 | 10,000.00 | 340.00 | 13,600.00 | | 0018 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | 8,000.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | | 0020 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 5,500.00 | 5,500.00 | 8,000.00 | 8,000.00 | 13,000.00 | 13,000.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0022 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | | 0023 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" THICK) (TRUCK APRON) | 1,023.4 | SQYD | 100.00 | 102,340.00 | 260.00 | 266,084.00 | 150.00 | 153,510.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 125,000.00 | 125,000.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.546 | MILE | 1,230.00 | 1,901.58 | 1,400.00 | 2,164.40 | 500.00 | 773.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.546 | MILE | 1,800.00 | 2,782.80 | 2,000.00 | 3,092.00 | 1,600.00 | 2,473.60 | | 0027 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,385 | SQYD | 2.50 | 13,462.50 | 2.50 | 13,462.50 | 1.75 | 9,423.75 | | 0028 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,946 | SQYD | 2.50 | 4,865.00 | 2.80 | 5,448.80 | 1.75 | 3,405.50 | | 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0030 | 726-01-00100 | Bedding Material | 15.6 | CUYD | 150.00 | 2,340.00 | 150.00 | 2,340.00 | 135.00 | 2,106.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 | 170,000.00 | 170,000.00 | | 0032 | 729-01-00100 | Sign (Type A) | 87 | SQFT | 28.00 | 2,436.00 | 30.00 | 2,610.00 | 25.00 | 2,175.00 | | 0033 | 729-02-00100 | Sign (Type B) | 150 | SQFT | 28.00 | 4,200.00 | 30.00 | 4,500.00 | 25.00 | 3,750.00 | | 0034 | 729-04-00100 | Sign (Type D) | 27 | SQFT | 28.00 | 756.00 | 30.00 | 810.00 | 25.00 | 675.00 | | 0035 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 25 | EACH | 180.00 | 4,500.00 | 200.00 | 5,000.00 | 160.00 | 4,000.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 266 | EACH | 11.00 | 2,926.00 | 12.00 | 3,192.00 | 10.00 | 2,660.00 | | 0037 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 1,157 | LNFT | 2.40 | 2,776.80 | 2.70 | 3,123.90 | 2.10 | 2,429.70 | | 0038 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 661 | LNFT | 7.00 | 4,627.00 | 7.50 | 4,957.50 | 6.10 | 4,032.10 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 424 | LNFT | 23.00 | 9,752.00 | 24.00 | 10,176.00 | 20.00 | 8,480.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.773 | MILE | 8,700.00 | 6,725.10 | 10,000.00 | 7,730.00 | 7,500.00 | 5,797.50 | | 0041 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.322 | MILE | 22,000.00 | 7,084.00 | 20,000.00 | 6,440.00 | 19,000.00 | 6,118.00 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 600.00 | 2,400.00 | 650.00 | 2,600.00 | 600.00 | 2,400.00 | | 0043 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 4 | EACH | 850.00 | 3,400.00 | 900.00 | 3,600.00 | 725.00 | 2,900.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 4,500.00 | 9,000.00 | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | | 0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 75,031 | INLF | 0.60 | 45,018.60 | 0.50 | 37,515.50 | 0.25 | 18,757.75 | | 0047 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 4 | EACH | 1,400.00 | 5,600.00 | 1,600.00 | 6,400.00 | 1,300.00 | 5,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,338,096.58 | | 1,644,867.70 | | 1,724,106.50 |
|