Proposal:H.015063.6
Parish:Grant
Routes:LA 3169, LA 502, LA 524
Description:LA 3169, LA 524, LA 502: OVERLAYS
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY,AND RELATED WORK.
Estimated Construction Cost:$3,198,499.68
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,705,301.35 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,872,777.43 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $4,375,767.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 200 | LNFT | 16.00 | 3,200.00 | 10.00 | 2,000.00 | 30.00 | 6,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" CMP) | 33 | LNFT | 18.00 | 594.00 | 70.00 | 2,310.00 | 20.00 | 660.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 4 | LNFT | 18.00 | 72.00 | 70.00 | 280.00 | 20.00 | 80.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 725 | CUYD | 81.00 | 58,725.00 | 100.00 | 72,500.00 | 25.00 | 18,125.00 | | 0005 | 303-02-00100 | Removal of Existing Patches | 300 | SQYD | 9.00 | 2,700.00 | 40.00 | 12,000.00 | 15.00 | 4,500.00 | | 0006 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 13,227.7 | SQYD | 14.00 | 185,187.80 | 20.00 | 264,554.00 | 18.00 | 238,098.60 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,607 | CUYD | 106.00 | 276,342.00 | 85.00 | 221,595.00 | 100.00 | 260,700.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 14,976.7 | TON | 128.00 | 1,917,017.60 | 138.00 | 2,066,784.60 | 162.00 | 2,426,225.40 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,329.3 | TON | 215.00 | 285,799.50 | 138.00 | 183,443.40 | 162.00 | 215,346.60 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 73,281 | SQYD | 2.65 | 194,194.65 | 3.00 | 219,843.00 | 4.00 | 293,124.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,373 | CUYD | 1.00 | -1,373.00 | 1.00 | -1,373.00 | 1.00 | -1,373.00 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 154 | SQYD | 195.00 | 30,030.00 | 250.00 | 38,500.00 | 250.00 | 38,500.00 | | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 56 | SQYD | 370.00 | 20,720.00 | 340.00 | 19,040.00 | 450.00 | 25,200.00 | | 0014 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | 155.6 | SQYD | 185.00 | 28,786.00 | 165.00 | 25,674.00 | 250.00 | 38,900.00 | | 0015 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 8 | LNFT | 255.00 | 2,040.00 | 210.00 | 1,680.00 | 350.00 | 2,800.00 | | 0016 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 40 | LNFT | 275.00 | 11,000.00 | 270.00 | 10,800.00 | 400.00 | 16,000.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,900.00 | 2,900.00 | 3,100.00 | 3,100.00 | 2,000.00 | 2,000.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 33 | LNFT | 15.00 | 495.00 | 11.00 | 363.00 | 5.00 | 165.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 35.00 | 3,062.50 | 28.00 | 2,450.00 | 40.00 | 3,500.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 122.00 | 12,200.00 | 100.00 | 10,000.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,200.00 | 16,800.00 | 3,800.00 | 15,200.00 | 5,000.00 | 20,000.00 | | 0022 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 60.00 | 3,240.00 | 70.00 | 3,780.00 | 75.00 | 4,050.00 | | 0023 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 5 | SQYD | 255.00 | 1,275.00 | 300.00 | 1,500.00 | 300.00 | 1,500.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 5 | SQYD | 10.00 | 50.00 | 100.00 | 500.00 | 10.00 | 50.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 58,000.00 | 58,000.00 | 121,000.00 | 121,000.00 | 115,000.00 | 115,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.087 | MILE | 154.00 | 3,247.40 | 275.00 | 5,798.93 | 300.00 | 6,326.10 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.743 | MILE | 850.00 | 7,431.55 | 1.00 | 8.74 | 800.00 | 6,994.40 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.261 | MILE | 1,350.00 | 48,952.35 | 1.00 | 36.26 | 1,200.00 | 43,513.20 | | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | | 0030 | 726-01-00100 | Bedding Material | 11 | CUYD | 160.00 | 1,760.00 | 200.00 | 2,200.00 | 150.00 | 1,650.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 345,500.00 | 345,500.00 | 380,000.00 | 380,000.00 | 370,000.00 | 370,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 3 | EACH | 115.00 | 345.00 | 75.00 | 225.00 | 125.00 | 375.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 135.00 | 540.00 | 110.00 | 440.00 | 125.00 | 500.00 | | 0034 | 729-19-00100 | Dead End Road Installations (Type A) | 4 | EACH | 4,750.00 | 19,000.00 | 3,000.00 | 12,000.00 | 2,500.00 | 10,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,459 | EACH | 9.00 | 13,131.00 | 8.00 | 11,672.00 | 8.00 | 11,672.00 | | 0036 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 50 | LNFT | 3.50 | 175.00 | 6.00 | 300.00 | 22.00 | 1,100.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 66 | LNFT | 20.00 | 1,320.00 | 22.00 | 1,452.00 | 26.00 | 1,716.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.088 | MILE | 6,250.00 | 75,550.00 | 5,000.00 | 60,440.00 | 6,000.00 | 72,528.00 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.915 | MILE | 3,200.00 | 9,328.00 | 2,100.00 | 6,121.50 | 1,400.00 | 4,081.00 | | 0040 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,400.00 | 2,800.00 | 1,300.00 | 2,600.00 | 900.00 | 1,800.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.011 | MILE | 14,000.00 | 154.00 | 100,000.00 | 1,100.00 | 50,000.00 | 550.00 | | 0042 | 735-01-00100 | Mailboxes | 49 | EACH | 1.00 | 49.00 | 30.00 | 1,470.00 | 40.00 | 1,960.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 45 | EACH | 300.00 | 13,500.00 | 105.00 | 4,725.00 | 300.00 | 13,500.00 | | 0044 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 300.00 | 600.00 | 210.00 | 420.00 | 400.00 | 800.00 | | 0045 | 739-01-00100 | Hydro-Seeding | 10.02 | ACRE | 3,000.00 | 30,060.00 | 2,200.00 | 22,044.00 | 2,500.00 | 25,050.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,705,301.35 | | 3,872,777.43 | | 4,375,767.30 |
|