Proposal:H.014875.6
Parish:Tensas
Description:LA 3252: LA 573 - LA 892
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,049,353.12
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,294,131.25 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $3,345,582.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of SPECIALTY MAILBOX | 1 | EACH | 5,000.00 | 5,000.00 | 750.00 | 750.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 501 | LNFT | 17.00 | 8,517.00 | 30.00 | 15,030.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 4 | LNFT | 22.00 | 88.00 | 20.00 | 80.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 77 | LNFT | 22.00 | 1,694.00 | 20.00 | 1,540.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 606 | CUYD | 35.00 | 21,210.00 | 50.00 | 30,300.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 50 | LNFT | 24.00 | 1,200.00 | 10.00 | 500.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 37 | EACH | 65.00 | 2,405.00 | 15.00 | 555.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 5.00 | 2,500.00 | 6.00 | 3,000.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,131 | CUYD | 190.00 | 404,890.00 | 100.00 | 213,100.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 9,070.8 | TON | 147.00 | 1,333,407.60 | 155.00 | 1,405,974.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 655 | TON | 240.00 | 157,200.00 | 155.00 | 101,525.00 | | 0012 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 24,153 | GAL | 4.75 | 114,726.75 | 4.30 | 103,857.90 | | 0013 | 507-02-00300 | Aggregate (S3) | 77,911 | SQYD | 1.65 | 128,553.15 | 1.60 | 124,657.60 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 758 | SQYD | 20.00 | 15,160.00 | 15.00 | 11,370.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -27 | CUYD | 1.00 | -27.00 | 1.00 | -27.00 | | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,218 | SQYD | 165.00 | 200,970.00 | 170.00 | 207,060.00 | | 0017 | 510-02-00100 | Pavement Widening 12" Minimum thickness | 1,153.5 | SQYD | 155.00 | 178,792.50 | 150.00 | 173,025.00 | | 0018 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 32 | LNFT | 275.00 | 8,800.00 | 360.00 | 11,520.00 | | 0019 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 100 | LNFT | 285.00 | 28,500.00 | 380.00 | 38,000.00 | | 0020 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 16 | LNFT | 290.00 | 4,640.00 | 400.00 | 6,400.00 | | 0021 | 701-01-01081 | Cross Drain Pipe (48" RCP) | 24 | LNFT | 310.00 | 7,440.00 | 500.00 | 12,000.00 | | 0022 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 104 | LNFT | 115.00 | 11,960.00 | 200.00 | 20,800.00 | | 0023 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 130 | LNFT | 130.00 | 16,900.00 | 225.00 | 29,250.00 | | 0024 | 701-08-00100 | Relaying Pipe 24" RCP | 8 | LNFT | 300.00 | 2,400.00 | 300.00 | 2,400.00 | | 0025 | 701-15-00100 | Concrete Collar | 3 | EACH | 3,000.00 | 9,000.00 | 1,800.00 | 5,400.00 | | 0026 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 11,000.00 | 22,000.00 | 8,500.00 | 17,000.00 | | 0027 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 451.3 | LNFT | 190.00 | 85,747.00 | 180.00 | 81,234.00 | | 0028 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 4 | EACH | 5,500.00 | 22,000.00 | 5,200.00 | 20,800.00 | | 0029 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 30 | SQYD | 225.00 | 6,750.00 | 180.00 | 5,400.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 157 | SQYD | 170.00 | 26,690.00 | 140.00 | 21,980.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 157 | SQYD | 4.00 | 628.00 | 5.00 | 785.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 33,000.00 | 33,000.00 | 125,000.00 | 125,000.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.68 | MILE | 175.00 | 1,169.00 | 300.00 | 2,004.00 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.96 | MILE | 900.00 | 1,764.00 | 800.00 | 1,568.00 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.216 | MILE | 1,250.00 | 30,270.00 | 1,000.00 | 24,216.00 | | 0036 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,765 | EACH | 3.25 | 5,736.25 | 3.00 | 5,295.00 | | 0037 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 1,700.00 | 2,550.00 | 2,200.00 | 3,300.00 | | 0038 | 717-01-00100 | Seeding | 8 | LB | 75.00 | 600.00 | 25.00 | 200.00 | | 0039 | 718-01-00100 | Fertilizer | 70 | LB | 5.50 | 385.00 | 3.00 | 210.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 580 | SQYD | 5.00 | 2,900.00 | 3.00 | 1,740.00 | | 0041 | 726-01-00100 | Bedding Material | 184.2 | CUYD | 145.00 | 26,709.00 | 135.00 | 24,867.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 132,000.00 | 132,000.00 | 275,000.00 | 275,000.00 | | 0043 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 125.00 | 1,500.00 | 120.00 | 1,440.00 | | 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 135.00 | 540.00 | 130.00 | 520.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,506 | EACH | 9.00 | 13,554.00 | 8.00 | 12,048.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 24.216 | MILE | 5,500.00 | 133,188.00 | 5,500.00 | 133,188.00 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.96 | MILE | 1,400.00 | 2,744.00 | 1,500.00 | 2,940.00 | | 0048 | 735-01-00100 | Mailboxes | 17 | EACH | 65.00 | 1,105.00 | 40.00 | 680.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 17 | EACH | 275.00 | 4,675.00 | 300.00 | 5,100.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 21,000.00 | 21,000.00 | | 0051 | NS-719-00002 | Tree Trimming APPROX. 8.469 ACRES | 1 | LUMP | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,294,131.25 | | 3,345,582.50 |
|