Proposal:H.014806.6
Parish:Concordia, Tensas
Routes:LA 568
Description:LA 568: LA 569 - US 65
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$3,109,604.11
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $3,385,104.30 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,826,229.58 |
| 3 | 18191 | Apac-Mississippi, Inc. | $4,190,142.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Apac-Mississippi, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of 3" Iron Pipes | 3 | EACH | 250.00 | 750.00 | 1,200.00 | 3,600.00 | 550.00 | 1,650.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 25 | SQYD | 20.00 | 500.00 | 55.00 | 1,375.00 | 87.00 | 2,175.00 | | 0003 | 202-02-12020 | Removal of Fence (Chain Link) | 100 | LNFT | 6.00 | 600.00 | 5.00 | 500.00 | 15.00 | 1,500.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP, 24" CMP, 30" CMP | 130 | LNFT | 20.00 | 2,600.00 | 20.00 | 2,600.00 | 37.00 | 4,810.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 605 | CUYD | 40.00 | 24,200.00 | 40.00 | 24,200.00 | 82.00 | 49,610.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 750 | LNFT | 3.00 | 2,250.00 | 4.50 | 3,375.00 | 20.00 | 15,000.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,418 | CUYD | 35.00 | 84,630.00 | 128.00 | 309,504.00 | 140.00 | 338,520.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 8,078.9 | TON | 155.00 | 1,252,229.50 | 160.00 | 1,292,624.00 | 159.50 | 1,288,584.55 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,947.6 | TON | 155.00 | 456,878.00 | 225.00 | 663,210.00 | 280.00 | 825,328.00 | | 0010 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 22,339 | GAL | 4.60 | 102,759.40 | 5.00 | 111,695.00 | 4.40 | 98,291.60 | | 0011 | 507-02-00300 | Aggregate (S3) | 72,060 | SQYD | 2.10 | 151,326.00 | 2.20 | 158,532.00 | 2.05 | 147,723.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 72,745 | SQYD | 3.00 | 218,235.00 | 2.60 | 189,137.00 | 1.85 | 134,578.25 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,529 | CUYD | 1.00 | -1,529.00 | 0.10 | -152.90 | 1.00 | -1,529.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,250 | SQYD | 185.00 | 416,250.00 | 150.00 | 337,500.00 | 178.00 | 400,500.00 | | 0015 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 407 | LNFT | 8.00 | 3,256.00 | 4.00 | 1,628.00 | 3.75 | 1,526.25 | | 0016 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 139 | LNFT | 8.00 | 1,112.00 | 4.00 | 556.00 | 3.95 | 549.05 | | 0017 | 602-10-00100 | Longitudinal Shoulder Joints | 612 | LNFT | 8.00 | 4,896.00 | 4.00 | 2,448.00 | 3.25 | 1,989.00 | | 0018 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 128 | LNFT | 200.00 | 25,600.00 | 145.00 | 18,560.00 | 140.00 | 17,920.00 | | 0019 | 701-05-02085 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 120 | LNFT | 250.00 | 30,000.00 | 155.00 | 18,600.00 | 160.00 | 19,200.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 40.00 | 3,500.00 | 44.00 | 3,850.00 | 40.00 | 3,500.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 140.00 | 14,000.00 | 140.00 | 14,000.00 | 150.00 | 15,000.00 | | 0022 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 4,500.00 | 13,500.00 | 4,000.00 | 12,000.00 | 3,500.00 | 10,500.00 | | 0023 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 5,500.00 | 5,500.00 | 4,300.00 | 4,300.00 | 3,000.00 | 3,000.00 | | 0024 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 84 | LNFT | 35.00 | 2,940.00 | 60.00 | 5,040.00 | 55.50 | 4,662.00 | | 0025 | 705-08-03000 | 8-Foot Double Gates for Chain Link Fence (4-Foot Height) | 1 | DBGT | 1,200.00 | 1,200.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | | 0026 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 726.3 | SQYD | 135.00 | 98,050.50 | 85.00 | 61,735.50 | 75.00 | 54,472.50 | | 0027 | 707-01-00100 | Concrete Curb | 54 | LNFT | 50.00 | 2,700.00 | 35.00 | 1,890.00 | 85.00 | 4,590.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,000.00 | 42,000.00 | 35,000.00 | 35,000.00 | 210,500.00 | 210,500.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.362 | MILE | 300.00 | 3,708.60 | 165.00 | 2,039.73 | 300.00 | 3,708.60 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 15.873 | MILE | 700.00 | 11,111.10 | 850.00 | 13,492.05 | 800.00 | 12,698.40 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 48.021 | MILE | 400.00 | 19,208.40 | 1,000.00 | 48,021.00 | 1,000.00 | 48,021.00 | | 0032 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,622 | EACH | 4.00 | 6,488.00 | 3.50 | 5,677.00 | 2.50 | 4,055.00 | | 0033 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 4,000.00 | 1,600.00 | 5,000.00 | 2,000.00 | 5,000.00 | 2,000.00 | | 0034 | 717-01-00100 | Seeding | 11 | LB | 50.00 | 550.00 | 50.00 | 550.00 | 45.00 | 495.00 | | 0035 | 718-01-00100 | Fertilizer | 180 | LB | 2.00 | 360.00 | 3.00 | 540.00 | 2.65 | 477.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 243,000.00 | 243,000.00 | 253,000.00 | 253,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 130.00 | 520.00 | 140.00 | 560.00 | 96.00 | 384.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 934 | EACH | 7.00 | 6,538.00 | 9.00 | 8,406.00 | 8.00 | 7,472.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.007 | MILE | 5,400.00 | 86,437.80 | 6,000.00 | 96,042.00 | 5,500.00 | 88,038.50 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.291 | MILE | 1,000.00 | 5,291.00 | 1,200.00 | 6,349.20 | 1,100.00 | 5,820.10 | | 0041 | 735-01-00100 | Mailboxes | 135 | EACH | 25.00 | 3,375.00 | 25.00 | 3,375.00 | 25.00 | 3,375.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 117 | EACH | 225.00 | 26,325.00 | 235.00 | 27,495.00 | 215.00 | 25,155.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 9 | EACH | 325.00 | 2,925.00 | 400.00 | 3,600.00 | 350.00 | 3,150.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 13,640.00 | 13,640.00 | | 0045 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 407 | LNFT | 7.00 | 2,849.00 | 3.50 | 1,424.50 | 3.25 | 1,322.75 | | 0046 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 139 | LNFT | 7.00 | 973.00 | 3.50 | 486.50 | 3.25 | 451.75 | | 0047 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 546 | LNFT | 3.50 | 1,911.00 | 2.50 | 1,365.00 | 2.25 | 1,228.50 | | 0048 | NS-719-00002 | Tree Trimming Approx. 1.653 Acres | 1 | LUMP | 20,000.00 | 20,000.00 | 11,000.00 | 11,000.00 | 18,000.00 | 18,000.00 | | 0049 | NS-719-00002 | Tree Trimming Approx. 6.253 Acres | 1 | LUMP | 33,000.00 | 33,000.00 | 55,000.00 | 55,000.00 | 40,000.00 | 40,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,385,104.30 | | 3,826,229.58 | | 4,190,142.80 |
|