Bid Tabulations for the Letting of 2/14/2024 LA DOTD Headquarters

Proposal:H.013083.6
Parish:Iberia
Routes:LA 675
Description:JEFFERSON ISLAND SIDEWALK
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$684,129.00
Rank License BidderConstruction Bid
146747Triumph Construction, LLC$547,000.00
252306SIEMA CONSTRUCTION, LLC$642,261.00
334263La Contracting Enterprise LLC$663,000.00
454206Southern Constructors, LLC$777,171.00
530774Progressive Construction Co., LLC$800,585.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Triumph Construction, LLC
- 2 -
SIEMA CONSTRUCTION, LLC
- 3 -
La Contracting Enterprise LLC
- 4 -
Southern Constructors, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1.17  LUMP25,450.0025,450.004,720.004,720.0012,000.0012,000.0010,000.0010,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP8,160.008,160.007,740.007,740.006,000.006,000.008,000.008,000.00
0003202-02-06100Removal of Concrete Walks and Drives 380     SQYD45.4517,271.0016.256,175.0045.0017,100.0035.0013,300.00
0004202-02-32140Removal of Pipe (Storm Drain) 24" RCP, 12" CMP261     LNFT49.0412,799.4435.009,135.0034.008,874.0070.0018,270.00
0005202-02-38240Removal of Signs and Supports 1     EACH200.00200.0031.0031.00162.15162.151,000.001,000.00
0006203-05-00100Excavation and Embankment 1     LUMP26,380.0026,380.00105,800.00105,800.0057,000.0057,000.0045,000.0045,000.00
0007204-02-00100Temporary Hay Bales 28     EACH27.14759.9277.502,170.0036.501,022.00100.002,800.00
0008204-06-00100Temporary Silt Fencing 1,847     LNFT1.592,936.732.594,783.732.755,079.255.009,235.00
0009701-04-01000Storm Drain Pipe Arch (15" Equiv. RCPA) 43     LNFT151.636,520.09253.0010,879.00160.006,880.00200.008,600.00
0010701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 795     LNFT96.9777,091.15129.00102,555.00195.00155,025.00210.00166,950.00
0011701-15-00100Concrete Collar 3     EACH1,083.333,249.99912.002,736.002,400.007,200.001,500.004,500.00
0012702-02-00100Manholes (MH-06) 7     EACH4,377.1430,639.985,275.0036,925.005,250.0036,750.008,000.0056,000.00
0013702-03-00100Catch Basins (CB-01) 4     EACH8,065.0032,260.007,410.0029,640.008,450.0033,800.0010,500.0042,000.00
0014702-08-00100Side Drain Safety End (Type 1) 6     EACH4,298.3325,789.983,400.0020,400.004,200.0025,200.007,500.0045,000.00
0015706-01-00100Concrete Walk (4" Thick) 938.3   SQYD50.4347,318.47106.0099,459.8092.0086,323.60110.00103,213.00
0016706-02-00300Concrete Drive (8" Thick) 485.4   SQYD80.2238,938.79126.0061,160.40120.0058,248.00130.0063,102.00
0017706-03-00300Incidental Concrete Paving (6" Thick) 48     SQYD93.544,489.9287.004,176.00120.005,760.00205.009,840.00
0018706-04-00110Curb Ramps (Type 3)8.1   SQYD444.443,599.96300.002,430.00625.005,062.50600.004,860.00
0019713-01-00100Temporary Signs and Barricades 1     LUMP57,142.9357,142.9325,500.0025,500.0019,000.0019,000.0025,000.0025,000.00
0020714-01-00700Slab Sodding (Centipede) 823     SQYD7.055,802.1519.0015,637.0016.0013,168.0012.009,876.00
0021716-01-00100Mulch (Vegetative) 0.08  TON20,000.001,600.0041,367.003,309.3629,500.002,360.0020,000.001,600.00
0022726-01-00100Bedding Material 182.5   CUYD92.6016,899.50151.0027,557.50195.0035,587.50130.0023,725.00
0023727-01-00100Mobilization 1     LUMP54,700.0054,700.0043,000.0643,000.0632,000.0032,000.0077,000.0077,000.00
0024729-01-00100Sign (Type A) 16     SQFT32.50520.0026.00416.0028.00448.00250.004,000.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 4     EACH387.501,550.00311.001,244.00350.001,400.00250.001,000.00
0026739-01-00100Hydro-Seeding 0.13  ACRE3,923.00509.9925,855.003,361.1515,000.001,950.0010,000.001,300.00
0027740-01-00100Construction Layout 1     LUMP30,000.0030,000.006,820.006,820.0015,000.0015,000.0010,000.0010,000.00
0028741-35-00100Adjust Valve or Meter Box 2     EACH855.001,710.00450.00900.001,300.002,600.001,500.003,000.00
0029NS-700-00100Trench Drains 3     EACH4,236.6712,710.011,200.003,600.004,000.0012,000.003,000.009,000.00
             
  CONTRACTOR TOTAL   547,000.00 642,261.00 663,000.00 777,171.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Progressive Construction Co., LLC
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1.17  LUMP30,000.0030,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP5,000.005,000.00
0003202-02-06100Removal of Concrete Walks and Drives 380     SQYD20.007,600.00
0004202-02-32140Removal of Pipe (Storm Drain) 24" RCP, 12" CMP261     LNFT35.009,135.00
0005202-02-38240Removal of Signs and Supports 1     EACH450.00450.00
0006203-05-00100Excavation and Embankment 1     LUMP57,000.0057,000.00
0007204-02-00100Temporary Hay Bales 28     EACH35.00980.00
0008204-06-00100Temporary Silt Fencing 1,847     LNFT4.007,388.00
0009701-04-01000Storm Drain Pipe Arch (15" Equiv. RCPA) 43     LNFT185.007,955.00
0010701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 795     LNFT235.00186,825.00
0011701-15-00100Concrete Collar 3     EACH2,500.007,500.00
0012702-02-00100Manholes (MH-06) 7     EACH6,700.0046,900.00
0013702-03-00100Catch Basins (CB-01) 4     EACH9,000.0036,000.00
0014702-08-00100Side Drain Safety End (Type 1) 6     EACH5,000.0030,000.00
0015706-01-00100Concrete Walk (4" Thick) 938.3   SQYD120.00112,596.00
0016706-02-00300Concrete Drive (8" Thick) 485.4   SQYD125.0060,675.00
0017706-03-00300Incidental Concrete Paving (6" Thick) 48     SQYD115.005,520.00
0018706-04-00110Curb Ramps (Type 3)8.1   SQYD350.002,835.00
0019713-01-00100Temporary Signs and Barricades 1     LUMP28,000.0028,000.00
0020714-01-00700Slab Sodding (Centipede) 823     SQYD12.009,876.00
0021716-01-00100Mulch (Vegetative) 0.08  TON15,000.001,200.00
0022726-01-00100Bedding Material 182.5   CUYD200.0036,500.00
0023727-01-00100Mobilization 1     LUMP80,000.0080,000.00
0024729-01-00100Sign (Type A) 16     SQFT50.00800.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 4     EACH300.001,200.00
0026739-01-00100Hydro-Seeding 0.13  ACRE15,000.001,950.00
0027740-01-00100Construction Layout 1     LUMP10,000.0010,000.00
0028741-35-00100Adjust Valve or Meter Box 2     EACH850.001,700.00
0029NS-700-00100Trench Drains 3     EACH5,000.0015,000.00
       
  CONTRACTOR TOTAL   800,585.00