Proposal:H.015237.6
Parish:West Carroll
Routes:LA 589
Description:LA 589: DRAINAGE IMPROVEMENTS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$162,735.00
| Rank | License | Bidder | Construction Bid |
| 1 | 64911 | Bentz Construction Group, LLC | $122,938.00 |
| 2 | 32563 | The Mabry Company Llc | $144,551.00 |
| 3 | 14788 | Louisiana Bridge, Inc. | $149,662.00 |
| 4 | 15099 | Amethyst Construction, Inc. | $151,963.00 |
| 5 | 54928 | Womack And Sons Constr. Group LLC | $159,000.00 |
| 6 | 35849 | T.L. CONSTRUCTION LLC | $223,017.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Bentz Construction Group, LLC | - 2 - The Mabry Company Llc | - 3 - Louisiana Bridge, Inc. | - 4 - Amethyst Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.041 | LUMP | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | 12,500.00 | 12,500.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 41 | LNFT | 80.00 | 3,280.00 | 25.00 | 1,025.00 | 120.00 | 4,920.00 | 165.00 | 6,765.00 | | 0003 | 203-10-00100 | Cleaning Existing Ditches | 200 | LNFT | 14.00 | 2,800.00 | 10.00 | 2,000.00 | 27.00 | 5,400.00 | 30.00 | 6,000.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 388 | LNFT | 5.00 | 1,940.00 | 5.00 | 1,940.00 | 6.00 | 2,328.00 | 7.00 | 2,716.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2 | CUYD | 200.00 | 400.00 | 500.00 | 1,000.00 | 400.00 | 800.00 | 850.00 | 1,700.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 10 | TON | 1,600.00 | 16,000.00 | 500.00 | 5,000.00 | 1,200.00 | 12,000.00 | 950.00 | 9,500.00 | | 0007 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 76 | SQYD | 165.00 | 12,540.00 | 250.00 | 19,000.00 | 210.00 | 15,960.00 | 175.00 | 13,300.00 | | 0008 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 84 | LNFT | 400.00 | 33,600.00 | 350.00 | 29,400.00 | 370.00 | 31,080.00 | 375.00 | 31,500.00 | | 0009 | 701-15-00100 | Concrete Collar | 4 | EACH | 3,000.00 | 12,000.00 | 800.00 | 3,200.00 | 2,000.00 | 8,000.00 | 1,850.00 | 7,400.00 | | 0010 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 42 | LNFT | 1.00 | 42.00 | 3.00 | 126.00 | 25.00 | 1,050.00 | 1.00 | 42.00 | | 0011 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 44 | SQYD | 220.00 | 9,680.00 | 200.00 | 8,800.00 | 100.00 | 4,400.00 | 130.00 | 5,720.00 | | 0012 | 711-04-00100 | Geotextile Fabric | 44 | SQYD | 2.50 | 110.00 | 5.00 | 220.00 | 7.00 | 308.00 | 5.00 | 220.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,500.00 | 9,500.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | | 0014 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 68 | LNFT | 35.00 | 2,380.00 | 10.00 | 680.00 | 180.00 | 12,240.00 | 10.00 | 680.00 | | 0015 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 8,000.00 | 3,200.00 | 3,000.00 | 1,200.00 | 2,500.00 | 1,000.00 | 4,500.00 | 1,800.00 | | 0016 | 717-01-00100 | Seeding | 11 | LB | 30.00 | 330.00 | 500.00 | 5,500.00 | 60.00 | 660.00 | 10.00 | 110.00 | | 0017 | 718-01-00100 | Fertilizer | 184 | LB | 1.50 | 276.00 | 50.00 | 9,200.00 | 8.00 | 1,472.00 | 1.00 | 184.00 | | 0018 | 726-01-00100 | Bedding Material | 44.4 | CUYD | 150.00 | 6,660.00 | 150.00 | 6,660.00 | 260.00 | 11,544.00 | 165.00 | 7,326.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 5,000.00 | 5,000.00 | 32,000.00 | 32,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 350.00 | 700.00 | 300.00 | 600.00 | 250.00 | 500.00 | 250.00 | 500.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 9,000.00 | 9,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 122,938.00 | | 144,551.00 | | 149,662.00 | | 151,963.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Womack And Sons Constr. Group LLC | - 6 - T.L. CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.041 | LUMP | 11,250.00 | 11,250.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 41 | LNFT | 37.00 | 1,517.00 | 145.00 | 5,945.00 | | 0003 | 203-10-00100 | Cleaning Existing Ditches | 200 | LNFT | 24.00 | 4,800.00 | 38.00 | 7,600.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 388 | LNFT | 10.00 | 3,880.00 | 12.00 | 4,656.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2 | CUYD | 1,350.00 | 2,700.00 | 1,200.00 | 2,400.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 10 | TON | 1,800.00 | 18,000.00 | 1,200.00 | 12,000.00 | | 0007 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 76 | SQYD | 325.00 | 24,700.00 | 260.00 | 19,760.00 | | 0008 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 84 | LNFT | 377.00 | 31,668.00 | 500.00 | 42,000.00 | | 0009 | 701-15-00100 | Concrete Collar | 4 | EACH | 1.00 | 4.00 | 3,200.00 | 12,800.00 | | 0010 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 42 | LNFT | 1.00 | 42.00 | 6.00 | 252.00 | | 0011 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 44 | SQYD | 145.00 | 6,380.00 | 390.00 | 17,160.00 | | 0012 | 711-04-00100 | Geotextile Fabric | 44 | SQYD | 20.00 | 880.00 | 20.00 | 880.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 20,000.00 | 20,000.00 | | 0014 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 68 | LNFT | 25.00 | 1,700.00 | 5.00 | 340.00 | | 0015 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 11,300.00 | 4,520.00 | 9,600.00 | 3,840.00 | | 0016 | 717-01-00100 | Seeding | 11 | LB | 140.00 | 1,540.00 | 120.00 | 1,320.00 | | 0017 | 718-01-00100 | Fertilizer | 184 | LB | 7.00 | 1,288.00 | 6.00 | 1,104.00 | | 0018 | 726-01-00100 | Bedding Material | 44.4 | CUYD | 225.00 | 9,990.00 | 150.00 | 6,660.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | | 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 170.00 | 340.00 | 150.00 | 300.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,801.00 | 4,801.00 | 4,000.00 | 4,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 159,000.00 | | 223,017.00 |
|