Proposal:H.015005.6
Parish:Caddo
Routes:LA 173
Description:LA 173: LEFT TURN LANES AT RUSSELL ROAD
Type Construction:GRADING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$829,709.59
| Rank | License | Bidder | Construction Bid |
| 1 | 35849 | T.L. CONSTRUCTION LLC | $960,122.90 |
| 2 | 17464 | Benton & Brown, LLC. | $1,135,024.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - T.L. CONSTRUCTION LLC | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 16,750.00 | 16,750.00 | | 0002 | 203-01-00100 | General Excavation | 281 | CUYD | 30.00 | 8,430.00 | 27.50 | 7,727.50 | | 0003 | 203-03-00100 | Embankment | 987 | CUYD | 50.00 | 49,350.00 | 43.00 | 42,441.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 7,260 | LNFT | 3.00 | 21,780.00 | 3.30 | 23,958.00 | | 0005 | 502-01-00100 | Asphalt Concrete LEVELING COURSE | 2,214.7 | TON | 200.00 | 442,940.00 | 230.00 | 509,381.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 11,587 | SQYD | 10.00 | 115,870.00 | 5.00 | 57,935.00 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -483 | CUYD | 1.00 | -483.00 | 0.01 | -4.83 | | 0008 | 707-03-00100 | Combination Concrete Curb and Gutter | 407.3 | LNFT | 120.00 | 48,876.00 | 85.00 | 34,620.50 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 125,500.00 | 125,500.00 | | 0010 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,210 | LNFT | 0.30 | 363.00 | 0.30 | 363.00 | | 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 758 | LNFT | 0.60 | 454.80 | 0.55 | 416.90 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.25 | MILE | 1,500.00 | 1,875.00 | 700.00 | 875.00 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.128 | MILE | 600.00 | 1,276.80 | 550.00 | 1,170.40 | | 0014 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 60.00 | 240.00 | 55.00 | 220.00 | | 0015 | 716-01-00100 | Mulch (Vegetative) | 6 | TON | 927.00 | 5,562.00 | 950.00 | 5,700.00 | | 0016 | 717-01-00100 | Seeding | 183 | LB | 17.00 | 3,111.00 | 22.00 | 4,026.00 | | 0017 | 718-01-00100 | Fertilizer | 3,040 | LB | 1.00 | 3,040.00 | 1.05 | 3,192.00 | | 0018 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.885 | MILE | 9,100.00 | 8,053.50 | 8,300.00 | 7,345.50 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 125,500.00 | 125,500.00 | | 0020 | 729-01-00100 | Sign (Type A) | 15 | SQFT | 60.00 | 900.00 | 165.00 | 2,475.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 584 | EACH | 9.60 | 5,606.40 | 9.00 | 5,256.00 | | 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 663 | LNFT | 24.00 | 15,912.00 | 22.00 | 14,586.00 | | 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 95 | LNFT | 36.00 | 3,420.00 | 33.00 | 3,135.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.128 | MILE | 12,000.00 | 25,536.00 | 11,000.00 | 23,408.00 | | 0025 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.115 | MILE | 37,500.00 | 4,312.50 | 33,000.00 | 3,795.00 | | 0026 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.115 | MILE | 37,500.00 | 4,312.50 | 33,000.00 | 3,795.00 | | 0027 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 600.00 | 2,400.00 | 550.00 | 2,200.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 50,000.00 | 50,000.00 | | 0029 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 4,680 | LNFT | 4.50 | 21,060.00 | 4.35 | 20,358.00 | | 0030 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 4,823 | LNFT | 4.80 | 23,150.40 | 4.35 | 20,980.05 | | 0031 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,258 | INLF | 3.00 | 9,774.00 | 5.50 | 17,919.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 960,122.90 | | 1,135,024.02 |
|