Proposal:H.002365.6
Parish:East Feliciana
Routes:LA 63
Description:LA 63 BRIDGES NEAR BLUFF CREEK
Type Construction:CLEARING AND GRUBBING, REMOVAL OF SLAB SPAN BRIDGES, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES (18"), PRECAST CONCRETE PILES (24"), SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$20,057,459.85
| Rank | License | Bidder | Construction Bid |
| 1 | 39613 | BAKER PILE DRIVING AND SITE WORK LLC | $20,173,011.80 |
| 2 | 55505 | MERRICK, LLC | $20,913,621.73 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $22,220,283.00 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $23,396,972.13 |
| 5 | 00009 | Coastal Contractors, LLC | $23,946,578.70 |
| 6 | 55950 | Brown Industrial Construction, LLC | $24,394,314.52 |
| 7 | 56994 | Matt L. Guinn Construction, LLC | $26,897,389.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BAKER PILE DRIVING AND SITE WORK LLC | - 2 - MERRICK, LLC | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 208,907.09 | 208,907.09 | 900,000.00 | 900,000.00 | 1,750,000.00 | 1,750,000.00 | 965,000.00 | 965,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 24,367.84 | 24,367.84 | 35,000.00 | 35,000.00 | 250,000.00 | 250,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 8,650 | SQYD | 6.09 | 52,678.50 | 9.00 | 77,850.00 | 16.00 | 138,400.00 | 5.00 | 43,250.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 61192590104521; 172' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 4,541 | LUMP | 67,403.54 | 67,403.54 | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 | 55,000.00 | 55,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 61192590104761; 58' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 1,531 | LUMP | 41,467.84 | 41,467.84 | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 61192590109061; 115' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 3,036 | LUMP | 54,435.70 | 54,435.70 | 80,000.00 | 80,000.00 | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | | 0007 | 202-02-04501 | Removal of Bridge STR. NO. 61192590110291; 229' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 6,046 | LUMP | 68,971.39 | 68,971.39 | 120,000.00 | 120,000.00 | 250,000.00 | 250,000.00 | 55,000.00 | 55,000.00 | | 0008 | 202-02-04501 | Removal of Bridge STR. NO. 61992590103141; 153' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 4,039 | LUMP | 56,003.54 | 56,003.54 | 90,000.00 | 90,000.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | | 0009 | 202-02-12000 | Removal of Fence | 1,303 | LNFT | 12.26 | 15,974.78 | 6.00 | 7,818.00 | 7.00 | 9,121.00 | 8.00 | 10,424.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 3,088.5 | LNFT | 12.42 | 38,359.17 | 12.00 | 37,062.00 | 7.00 | 21,619.50 | 11.00 | 33,973.50 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) 15" Diameter CCP, 18" Diameter RCP | 105 | LNFT | 13.53 | 1,420.65 | 35.00 | 3,675.00 | 45.00 | 4,725.00 | 7.00 | 735.00 | | 0012 | 203-01-00100 | General Excavation | 12,657 | CUYD | 12.73 | 161,123.61 | 15.00 | 189,855.00 | 10.00 | 126,570.00 | 24.00 | 303,768.00 | | 0013 | 203-02-00100 | Drainage Excavation | 2,096 | CUYD | 25.04 | 52,483.84 | 30.00 | 62,880.00 | 36.00 | 75,456.00 | 21.00 | 44,016.00 | | 0014 | 203-03-00100 | Embankment | 18,693 | CUYD | 21.24 | 397,039.32 | 25.00 | 467,325.00 | 35.00 | 654,255.00 | 40.00 | 747,720.00 | | 0015 | 203-11-00100 | Settlement Plate Installation and Monitoring | 3 | EACH | 6,958.80 | 20,876.40 | 2,500.00 | 7,500.00 | 2,500.00 | 7,500.00 | 9,000.00 | 27,000.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 89 | EACH | 254.77 | 22,674.53 | 190.00 | 16,910.00 | 180.00 | 16,020.00 | 210.00 | 18,690.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 14,283 | LNFT | 2.70 | 38,564.10 | 2.50 | 35,707.50 | 5.00 | 71,415.00 | 4.00 | 57,132.00 | | 0018 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 11,587.6 | SQYD | 40.00 | 463,504.00 | 51.00 | 590,967.60 | 50.00 | 579,380.00 | 47.00 | 544,617.20 | | 0019 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 11,586 | SQYD | 51.30 | 594,361.80 | 19.00 | 220,134.00 | 30.00 | 347,580.00 | 25.00 | 289,650.00 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 30 | CUYD | 326.60 | 9,798.00 | 200.00 | 6,000.00 | 200.00 | 6,000.00 | 300.00 | 9,000.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 29.8 | CUYD | 114.00 | 3,397.20 | 175.00 | 5,215.00 | 140.00 | 4,172.00 | 300.00 | 8,940.00 | | 0022 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 747 | SQYD | 40.62 | 30,343.14 | 25.00 | 18,675.00 | 190.00 | 141,930.00 | 106.00 | 79,182.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 3,166.4 | TON | 201.00 | 636,446.40 | 218.00 | 690,275.20 | 190.00 | 601,616.00 | 160.00 | 506,624.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 704 | TON | 304.72 | 214,522.88 | 245.00 | 172,480.00 | 220.00 | 154,880.00 | 243.00 | 171,072.00 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 6,947 | SQYD | 9.74 | 67,663.78 | 8.00 | 55,576.00 | 8.00 | 55,576.00 | 7.00 | 48,629.00 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -290 | CUYD | 0.01 | -2.90 | 0.10 | -29.00 | 1.00 | -290.00 | 0.01 | -2.90 | | 0027 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 430 | SQYD | 240.77 | 103,531.10 | 250.00 | 107,500.00 | 250.00 | 107,500.00 | 192.00 | 82,560.00 | | 0028 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 114 | LNFT | 172.96 | 19,717.44 | 100.00 | 11,400.00 | 190.00 | 21,660.00 | 200.00 | 22,800.00 | | 0029 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 8,203.98 | 32,815.92 | 4,000.00 | 16,000.00 | 7,500.00 | 30,000.00 | 5,250.00 | 21,000.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,231.25 | LNFT | 40.00 | 49,250.00 | 40.00 | 49,250.00 | 37.00 | 45,556.25 | 34.00 | 41,862.50 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 500 | LNFT | 142.50 | 71,250.00 | 145.00 | 72,500.00 | 121.00 | 60,500.00 | 120.00 | 60,000.00 | | 0032 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 20 | EACH | 4,389.00 | 87,780.00 | 3,800.00 | 76,000.00 | 3,200.00 | 64,000.00 | 3,100.00 | 62,000.00 | | 0033 | 705-01-00100 | Barbed Wire Fence | 1,189 | LNFT | 15.66 | 18,619.74 | 14.00 | 16,646.00 | 14.00 | 16,646.00 | 12.00 | 14,268.00 | | 0034 | 708-01-00100 | Right-of-Way Monument | 64 | EACH | 438.90 | 28,089.60 | 650.00 | 41,600.00 | 650.00 | 41,600.00 | 600.00 | 38,400.00 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 64 | EACH | 250.80 | 16,051.20 | 235.00 | 15,040.00 | 250.00 | 16,000.00 | 200.00 | 12,800.00 | | 0036 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 3,044 | SQYD | 174.85 | 532,243.40 | 145.00 | 441,380.00 | 136.00 | 413,984.00 | 175.00 | 532,700.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 79,800.00 | 79,800.00 | 450,000.00 | 450,000.00 | 500,000.00 | 500,000.00 | 595,000.00 | 595,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.786 | MILE | 3,660.00 | 10,196.76 | 3,000.00 | 8,358.00 | 5,100.00 | 14,208.60 | 5,000.00 | 13,930.00 | | 0039 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 369 | EACH | 7.98 | 2,944.62 | 8.50 | 3,136.50 | 22.00 | 8,118.00 | 20.00 | 7,380.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 6,343 | SQYD | 1.95 | 12,368.85 | 2.50 | 15,857.50 | 1.60 | 10,148.80 | 2.00 | 12,686.00 | | 0041 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 773 | SQYD | 2.68 | 2,071.64 | 3.60 | 2,782.80 | 2.50 | 1,932.50 | 3.00 | 2,319.00 | | 0042 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 743 | SQYD | 3.07 | 2,281.01 | 5.00 | 3,715.00 | 2.75 | 2,043.25 | 4.00 | 2,972.00 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 285,285.70 | 285,285.70 | 40,000.00 | 40,000.00 | 55,000.00 | 55,000.00 | 50,000.00 | 50,000.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 0.743 | MILE | 8,740.00 | 6,493.82 | 325.00 | 241.48 | 5,000.00 | 3,715.00 | 270.00 | 200.61 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.486 | MILE | 8,440.00 | 12,541.84 | 325.00 | 482.95 | 2,700.00 | 4,012.20 | 270.00 | 401.22 | | 0046 | 725-01-00100 | Temporary Detour Roads | 14,290.2 | SQYD | 236.00 | 3,372,487.20 | 225.00 | 3,215,295.00 | 240.00 | 3,429,648.00 | 205.00 | 2,929,491.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 2,069,100.00 | 2,069,100.00 | 2,065,000.00 | 2,065,000.00 | 2,200,000.00 | 2,200,000.00 | 2,300,000.00 | 2,300,000.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 108.30 | 2,166.00 | 100.00 | 2,000.00 | 95.00 | 1,900.00 | 90.00 | 1,800.00 | | 0049 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,060 | EACH | 13.68 | 41,860.80 | 14.00 | 42,840.00 | 21.00 | 64,260.00 | 20.00 | 61,200.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 173 | EACH | 9.12 | 1,577.76 | 9.00 | 1,557.00 | 26.00 | 4,498.00 | 25.00 | 4,325.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.876 | MILE | 6,270.00 | 18,032.52 | 6,500.00 | 18,694.00 | 11,000.00 | 31,636.00 | 10,000.00 | 28,760.00 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.636 | MILE | 1,370.00 | 871.32 | 1,400.00 | 890.40 | 5,100.00 | 3,243.60 | 5,000.00 | 3,180.00 | | 0053 | 735-01-00100 | Mailboxes | 1 | EACH | 114.00 | 114.00 | 100.00 | 100.00 | 22.00 | 22.00 | 25.00 | 25.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 228.00 | 228.00 | 300.00 | 300.00 | 360.00 | 360.00 | 200.00 | 200.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 20 | ACRE | 3,420.00 | 68,400.00 | 2,800.00 | 56,000.00 | 3,000.00 | 60,000.00 | 2,600.00 | 52,000.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 266,587.42 | 266,587.42 | 400,000.00 | 400,000.00 | 900,000.00 | 900,000.00 | 555,000.00 | 555,000.00 | | 0057 | 804-01-00400 | Precast Concrete Piles (18") | 10,080 | LNFT | 198.74 | 2,003,299.20 | 230.00 | 2,318,400.00 | 170.00 | 1,713,600.00 | 300.00 | 3,024,000.00 | | 0058 | 804-01-00600 | Precast Concrete Piles (24") | 5,240 | LNFT | 277.63 | 1,454,781.20 | 290.00 | 1,519,600.00 | 200.00 | 1,048,000.00 | 350.00 | 1,834,000.00 | | 0059 | 805-01-00100 | Class A1 Concrete (Slab Span) | 1,330.41 | CUYD | 1,543.00 | 2,052,822.63 | 1,700.00 | 2,261,697.00 | 1,700.00 | 2,261,697.00 | 2,000.00 | 2,660,820.00 | | 0060 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 408.08 | CUYD | 3,730.00 | 1,522,138.40 | 2,200.00 | 897,776.00 | 2,500.00 | 1,020,200.00 | 3,500.00 | 1,428,280.00 | | 0061 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 10,676 | SQFT | 7.93 | 84,660.68 | 2.30 | 24,554.80 | 3.00 | 32,028.00 | 2.00 | 21,352.00 | | 0062 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 10,676 | SQFT | 7.63 | 81,457.88 | 2.50 | 26,690.00 | 3.00 | 32,028.00 | 3.00 | 32,028.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 313,865 | LB | 1.47 | 461,381.55 | 1.80 | 564,957.00 | 1.30 | 408,024.50 | 2.00 | 627,730.00 | | 0064 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 1,560 | LNFT | 376.20 | 586,872.00 | 200.00 | 312,000.00 | 225.00 | 351,000.00 | 235.00 | 366,600.00 | | 0065 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 13,432 | SQFT | 79.67 | 1,070,127.44 | 108.00 | 1,450,656.00 | 122.00 | 1,638,704.00 | 110.00 | 1,477,520.00 | | 0066 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 1,047 | SFIN | 169.86 | 177,843.42 | 220.00 | 230,340.00 | 100.00 | 104,700.00 | 140.00 | 146,580.00 | | 0067 | 815-03-00300 | Joint Seal (Poured) | 1,512 | LNFT | 14.38 | 21,742.56 | 30.00 | 45,360.00 | 40.00 | 60,480.00 | 25.00 | 37,800.00 | | 0068 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,008 | LNFT | 14.66 | 14,777.28 | 15.00 | 15,120.00 | 10.00 | 10,080.00 | 10.00 | 10,080.00 | | 0069 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,680 | LNFT | 3.87 | 6,501.60 | 3.00 | 5,040.00 | 3.00 | 5,040.00 | 1.50 | 2,520.00 | | 0070 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 15,988 | INLF | 4.82 | 77,062.16 | 1.00 | 15,988.00 | 1.35 | 21,583.80 | 1.50 | 23,982.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 20,173,011.80 | | 20,913,621.73 | | 22,220,283.00 | | 23,396,972.13 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Coastal Contractors, LLC | - 6 - Brown Industrial Construction, LLC | - 7 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 900,000.00 | 900,000.00 | 2,500,000.00 | 2,500,000.00 | 600,000.00 | 600,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 125,000.00 | 125,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 8,650 | SQYD | 28.00 | 242,200.00 | 5.00 | 43,250.00 | 16.00 | 138,400.00 | | 0004 | 202-02-04501 | Removal of Bridge STR. NO. 61192590104521; 172' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 4,541 | LUMP | 120,000.00 | 120,000.00 | 250,000.00 | 250,000.00 | 155,000.00 | 155,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STR. NO. 61192590104761; 58' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 1,531 | LUMP | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 61192590109061; 115' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 3,036 | LUMP | 80,000.00 | 80,000.00 | 150,000.00 | 150,000.00 | 110,000.00 | 110,000.00 | | 0007 | 202-02-04501 | Removal of Bridge STR. NO. 61192590110291; 229' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 6,046 | LUMP | 160,000.00 | 160,000.00 | 300,000.00 | 300,000.00 | 190,000.00 | 190,000.00 | | 0008 | 202-02-04501 | Removal of Bridge STR. NO. 61992590103141; 153' X 26.4' CONCRETE PRECAST SLAB SPAN BRIDGE | 4,039 | LUMP | 110,000.00 | 110,000.00 | 175,000.00 | 175,000.00 | 145,000.00 | 145,000.00 | | 0009 | 202-02-12000 | Removal of Fence | 1,303 | LNFT | 11.00 | 14,333.00 | 4.50 | 5,863.50 | 5.00 | 6,515.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 3,088.5 | LNFT | 12.00 | 37,062.00 | 7.00 | 21,619.50 | 10.00 | 30,885.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) 15" Diameter CCP, 18" Diameter RCP | 105 | LNFT | 40.00 | 4,200.00 | 25.00 | 2,625.00 | 25.00 | 2,625.00 | | 0012 | 203-01-00100 | General Excavation | 12,657 | CUYD | 25.00 | 316,425.00 | 18.00 | 227,826.00 | 28.00 | 354,396.00 | | 0013 | 203-02-00100 | Drainage Excavation | 2,096 | CUYD | 42.00 | 88,032.00 | 20.00 | 41,920.00 | 35.00 | 73,360.00 | | 0014 | 203-03-00100 | Embankment | 18,693 | CUYD | 35.00 | 654,255.00 | 31.00 | 579,483.00 | 43.00 | 803,799.00 | | 0015 | 203-11-00100 | Settlement Plate Installation and Monitoring | 3 | EACH | 4,500.00 | 13,500.00 | 5,000.00 | 15,000.00 | 4,000.00 | 12,000.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 89 | EACH | 200.00 | 17,800.00 | 210.00 | 18,690.00 | 265.00 | 23,585.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 14,283 | LNFT | 2.25 | 32,136.75 | 2.50 | 35,707.50 | 3.20 | 45,705.60 | | 0018 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 11,587.6 | SQYD | 75.00 | 869,070.00 | 48.00 | 556,204.80 | 75.00 | 869,070.00 | | 0019 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 11,586 | SQYD | 43.00 | 498,198.00 | 17.00 | 196,962.00 | 28.50 | 330,201.00 | | 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 30 | CUYD | 175.00 | 5,250.00 | 250.00 | 7,500.00 | 220.00 | 6,600.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 29.8 | CUYD | 175.00 | 5,215.00 | 200.00 | 5,960.00 | 220.00 | 6,556.00 | | 0022 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 747 | SQYD | 115.00 | 85,905.00 | 80.00 | 59,760.00 | 60.00 | 44,820.00 | | 0023 | 502-01-00100 | Asphalt Concrete | 3,166.4 | TON | 280.00 | 886,592.00 | 160.00 | 506,624.00 | 245.00 | 775,768.00 | | 0024 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 704 | TON | 280.00 | 197,120.00 | 250.00 | 176,000.00 | 300.00 | 211,200.00 | | 0025 | 509-01-00100 | Milling Asphalt Pavement | 6,947 | SQYD | 9.00 | 62,523.00 | 8.00 | 55,576.00 | 23.00 | 159,781.00 | | 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -290 | CUYD | 0.01 | -2.90 | 0.01 | -2.90 | 1.00 | -290.00 | | 0027 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 430 | SQYD | 212.00 | 91,160.00 | 200.00 | 86,000.00 | 235.00 | 101,050.00 | | 0028 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 114 | LNFT | 180.00 | 20,520.00 | 110.00 | 12,540.00 | 115.00 | 13,110.00 | | 0029 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 10,000.00 | 40,000.00 | 3,500.00 | 14,000.00 | 6,500.00 | 26,000.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,231.25 | LNFT | 30.00 | 36,937.50 | 34.00 | 41,862.50 | 38.00 | 46,787.50 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 500 | LNFT | 125.00 | 62,500.00 | 120.00 | 60,000.00 | 150.00 | 75,000.00 | | 0032 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 20 | EACH | 4,000.00 | 80,000.00 | 3,100.00 | 62,000.00 | 4,800.00 | 96,000.00 | | 0033 | 705-01-00100 | Barbed Wire Fence | 1,189 | LNFT | 17.00 | 20,213.00 | 12.00 | 14,268.00 | 18.00 | 21,402.00 | | 0034 | 708-01-00100 | Right-of-Way Monument | 64 | EACH | 700.00 | 44,800.00 | 300.00 | 19,200.00 | 550.00 | 35,200.00 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 64 | EACH | 225.00 | 14,400.00 | 300.00 | 19,200.00 | 350.00 | 22,400.00 | | 0036 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 3,044 | SQYD | 160.00 | 487,040.00 | 130.00 | 395,720.00 | 165.00 | 502,260.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 330,000.00 | 330,000.00 | 300,000.00 | 300,000.00 | 250,000.00 | 250,000.00 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.786 | MILE | 2,900.00 | 8,079.40 | 2,550.00 | 7,104.30 | 15,000.00 | 41,790.00 | | 0039 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 369 | EACH | 8.20 | 3,025.80 | 7.00 | 2,583.00 | 15.00 | 5,535.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 6,343 | SQYD | 1.85 | 11,734.55 | 2.00 | 12,686.00 | 2.50 | 15,857.50 | | 0041 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 773 | SQYD | 2.90 | 2,241.70 | 3.00 | 2,319.00 | 2.50 | 1,932.50 | | 0042 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 743 | SQYD | 3.30 | 2,451.90 | 4.00 | 2,972.00 | 2.50 | 1,857.50 | | 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 115,000.00 | 115,000.00 | 100,000.00 | 100,000.00 | 65,000.00 | 65,000.00 | | 0044 | 724-01-00100 | Rumble Strips (Centerline) | 0.743 | MILE | 350.00 | 260.05 | 2,600.00 | 1,931.80 | 15,000.00 | 11,145.00 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.486 | MILE | 350.00 | 520.10 | 2,600.00 | 3,863.60 | 12,000.00 | 17,832.00 | | 0046 | 725-01-00100 | Temporary Detour Roads | 14,290.2 | SQYD | 275.00 | 3,929,805.00 | 262.00 | 3,744,032.40 | 360.00 | 5,144,472.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 1,500,000.00 | 1,500,000.00 | 2,400,000.00 | 2,400,000.00 | 2,500,000.00 | 2,500,000.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 275.00 | 5,500.00 | 90.00 | 1,800.00 | 325.00 | 6,500.00 | | 0049 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,060 | EACH | 14.00 | 42,840.00 | 12.00 | 36,720.00 | 6.50 | 19,890.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 173 | EACH | 9.40 | 1,626.20 | 8.00 | 1,384.00 | 15.00 | 2,595.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.876 | MILE | 6,500.00 | 18,694.00 | 5,600.00 | 16,105.60 | 16,000.00 | 46,016.00 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.636 | MILE | 1,400.00 | 890.40 | 1,220.00 | 775.92 | 10,000.00 | 6,360.00 | | 0053 | 735-01-00100 | Mailboxes | 1 | EACH | 250.00 | 250.00 | 25.00 | 25.00 | 150.00 | 150.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 400.00 | 400.00 | 200.00 | 200.00 | 150.00 | 150.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 20 | ACRE | 3,500.00 | 70,000.00 | 2,600.00 | 52,000.00 | 3,200.00 | 64,000.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 400,000.00 | 400,000.00 | 165,000.00 | 165,000.00 | | 0057 | 804-01-00400 | Precast Concrete Piles (18") | 10,080 | LNFT | 180.00 | 1,814,400.00 | 230.00 | 2,318,400.00 | 256.00 | 2,580,480.00 | | 0058 | 804-01-00600 | Precast Concrete Piles (24") | 5,240 | LNFT | 210.00 | 1,100,400.00 | 270.00 | 1,414,800.00 | 430.00 | 2,253,200.00 | | 0059 | 805-01-00100 | Class A1 Concrete (Slab Span) | 1,330.41 | CUYD | 2,700.00 | 3,592,107.00 | 1,950.00 | 2,594,299.50 | 2,250.00 | 2,993,422.50 | | 0060 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 408.08 | CUYD | 3,500.00 | 1,428,280.00 | 3,000.00 | 1,224,240.00 | 3,250.00 | 1,326,260.00 | | 0061 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 10,676 | SQFT | 2.50 | 26,690.00 | 2.00 | 21,352.00 | 1.25 | 13,345.00 | | 0062 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 10,676 | SQFT | 3.50 | 37,366.00 | 2.50 | 26,690.00 | 1.25 | 13,345.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 313,865 | LB | 2.25 | 706,196.25 | 1.90 | 596,343.50 | 1.70 | 533,570.50 | | 0064 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 1,560 | LNFT | 260.00 | 405,600.00 | 270.00 | 421,200.00 | 320.00 | 499,200.00 | | 0065 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 13,432 | SQFT | 138.00 | 1,853,616.00 | 125.00 | 1,679,000.00 | 140.00 | 1,880,480.00 | | 0066 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 1,047 | SFIN | 100.00 | 104,700.00 | 150.00 | 157,050.00 | 210.00 | 219,870.00 | | 0067 | 815-03-00300 | Joint Seal (Poured) | 1,512 | LNFT | 50.00 | 75,600.00 | 20.00 | 30,240.00 | 25.00 | 37,800.00 | | 0068 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,008 | LNFT | 8.00 | 8,064.00 | 12.00 | 12,096.00 | 15.00 | 15,120.00 | | 0069 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,680 | LNFT | 3.50 | 5,880.00 | 7.00 | 11,760.00 | 3.00 | 5,040.00 | | 0070 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 15,988 | INLF | 2.00 | 31,976.00 | 1.50 | 23,982.00 | 1.00 | 15,988.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 23,946,578.70 | | 24,394,314.52 | | 26,897,389.60 |
|