Proposal:H.015314.6
Parish:Rapides
Routes:I-49, LA 1
Description:LA 1: RAPIDES STATION - CSLM 10.464
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,400,078.70
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,439,930.74 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,135,659.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 296 | SQYD | 35.00 | 10,360.00 | 80.00 | 23,680.00 | | 0002 | 203-01-00100 | General Excavation | 6,908 | CUYD | 16.50 | 113,982.00 | 32.00 | 221,056.00 | | 0003 | 203-03-00100 | Embankment | 6,908 | CUYD | 24.50 | 169,246.00 | 42.00 | 290,136.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 152 | CUYD | 64.00 | 9,728.00 | 11.00 | 1,672.00 | | 0005 | 303-02-00100 | Removal of Existing Patches | 600 | SQYD | 34.00 | 20,400.00 | 14.00 | 8,400.00 | | 0006 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 23,842.2 | SQYD | 14.50 | 345,711.90 | 15.00 | 357,633.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,273 | CUYD | 13.00 | 16,549.00 | 80.00 | 101,840.00 | | 0008 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 300 | SQYD | 148.00 | 44,400.00 | 18.00 | 5,400.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 11,603.6 | TON | 154.00 | 1,786,954.40 | 150.00 | 1,740,540.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 200.8 | TON | 220.00 | 44,176.00 | 275.00 | 55,220.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 33,880 | SQYD | 4.25 | 143,990.00 | 5.00 | 169,400.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,416 | CUYD | 1.00 | -2,416.00 | 1.00 | -2,416.00 | | 0013 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,401 | SQYD | 146.00 | 204,546.00 | 170.00 | 238,170.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 385,000.00 | 385,000.00 | | 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.887 | MILE | 340.00 | 1,661.58 | 154.00 | 752.60 | | 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.341 | MILE | 905.00 | 3,928.61 | 900.00 | 3,906.90 | | 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.18 | MILE | 1,520.00 | 18,513.60 | 1,550.00 | 18,879.00 | | 0018 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,000.00 | 12,000.00 | 5,100.00 | 5,100.00 | | 0019 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 2.22 | MILE | 1,250.00 | 2,775.00 | 1,250.00 | 2,775.00 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 343,000.00 | 343,000.00 | 410,000.00 | 410,000.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 480 | EACH | 10.25 | 4,920.00 | 10.00 | 4,800.00 | | 0022 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 639.3 | LNFT | 6.15 | 3,931.70 | 6.50 | 4,155.45 | | 0023 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 456.8 | LNFT | 19.50 | 8,907.60 | 20.00 | 9,136.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 167.1 | LNFT | 22.00 | 3,676.20 | 23.00 | 3,843.30 | | 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.852 | MILE | 6,475.00 | 31,416.70 | 6,500.00 | 31,538.00 | | 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.447 | MILE | 3,150.00 | 4,558.05 | 3,200.00 | 4,630.40 | | 0027 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 825.00 | 1,650.00 | 800.00 | 1,600.00 | | 0028 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 475.00 | 2,850.00 | 450.00 | 2,700.00 | | 0029 | 735-01-00100 | Mailboxes | 31 | EACH | 36.00 | 1,116.00 | 1.00 | 31.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 31 | EACH | 210.00 | 6,510.00 | 1.00 | 31.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 1.381 | ACRE | 2,400.00 | 3,314.40 | 3,700.00 | 5,109.70 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0033 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 792 | INLF | 3.25 | 2,574.00 | 7.50 | 5,940.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,439,930.74 | | 4,135,659.35 |
|