Proposal:H.014862.6
Parish:Catahoula
Routes:LA 1018-1, LA 1018-2, LA 1018-3, LA 923
Description:LA 923: LA 126 - LA 124 & 1018-1, 1018-2, 1018-3
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT OVERLAY, AND RELATED WORK
Estimated Construction Cost:$2,166,531.50
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,376,290.95 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $2,619,032.65 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $2,867,982.86 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 16.2 | SQYD | 20.00 | 324.00 | 250.00 | 4,050.00 | 70.00 | 1,134.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,575 | LNFT | 25.00 | 39,375.00 | 25.00 | 39,375.00 | 15.00 | 23,625.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 55 | LNFT | 15.00 | 825.00 | 65.00 | 3,575.00 | 21.00 | 1,155.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" RCP, 24" RCP, 36" CMP | 82 | LNFT | 15.00 | 1,230.00 | 85.00 | 6,970.00 | 21.00 | 1,722.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 48 | CUYD | 40.00 | 1,920.00 | 100.00 | 4,800.00 | 19.00 | 912.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,405 | CUYD | 100.00 | 140,500.00 | 100.00 | 140,500.00 | 155.00 | 217,775.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 6,920 | TON | 135.00 | 934,200.00 | 140.00 | 968,800.00 | 150.00 | 1,038,000.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,325.1 | TON | 235.00 | 311,398.50 | 250.00 | 331,275.00 | 325.00 | 430,657.50 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 7,127 | SQYD | 10.00 | 71,270.00 | 10.00 | 71,270.00 | 7.00 | 49,889.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -331 | CUYD | 1.00 | -331.00 | 1.00 | -331.00 | 1.00 | -331.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 205 | SQYD | 300.00 | 61,500.00 | 230.00 | 47,150.00 | 255.00 | 52,275.00 | | 0012 | 701-01-01006 | Cross Drain Pipe (24" RPVCP/CPEPDW) | 35 | LNFT | 300.00 | 10,500.00 | 380.00 | 13,300.00 | 260.00 | 9,100.00 | | 0013 | 701-01-01023 | Cross Drain Pipe (30" RCP/RPVCP/CPEPDW) | 80 | LNFT | 325.00 | 26,000.00 | 400.00 | 32,000.00 | 280.00 | 22,400.00 | | 0014 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 72 | LNFT | 350.00 | 25,200.00 | 425.00 | 30,600.00 | 290.00 | 20,880.00 | | 0015 | 701-08-00100 | Relaying Pipe 30" RCP | 12 | LNFT | 300.00 | 3,600.00 | 900.00 | 10,800.00 | 230.00 | 2,760.00 | | 0016 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 250.00 | 2,000.00 | 750.00 | 6,000.00 | 355.00 | 2,840.00 | | 0017 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 300.00 | 2,400.00 | 750.00 | 6,000.00 | 380.00 | 3,040.00 | | 0018 | 701-15-00100 | Concrete Collar | 5 | EACH | 1,500.00 | 7,500.00 | 5,000.00 | 25,000.00 | 2,800.00 | 14,000.00 | | 0019 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | | 0020 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 | 9,000.00 | 9,000.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 911.25 | LNFT | 145.00 | 132,131.25 | 72.00 | 65,610.00 | 145.00 | 132,131.25 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 262.5 | LNFT | 36.00 | 9,450.00 | 36.00 | 9,450.00 | 36.00 | 9,450.00 | | 0023 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 6 | EACH | 4,000.00 | 24,000.00 | 3,300.00 | 19,800.00 | 3,800.00 | 22,800.00 | | 0024 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 4,200.00 | 4,200.00 | 3,400.00 | 3,400.00 | 3,900.00 | 3,900.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 9 | EACH | 4,500.00 | 40,500.00 | 3,700.00 | 33,300.00 | 4,250.00 | 38,250.00 | | 0026 | 706-01-00100 | Concrete Walk (4" Thick) | 16.2 | SQYD | 95.00 | 1,539.00 | 300.00 | 4,860.00 | 80.00 | 1,296.00 | | 0027 | 706-04-00110 | Curb Ramps Type 3 | 16.2 | SQYD | 150.00 | 2,430.00 | 1,200.00 | 19,440.00 | 2,500.00 | 40,500.00 | | 0028 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 69 | SQYD | 125.00 | 8,625.00 | 140.00 | 9,660.00 | 200.00 | 13,800.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 69 | SQYD | 5.00 | 345.00 | 7.00 | 483.00 | 10.00 | 690.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 138,000.00 | 138,000.00 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.114 | MILE | 250.00 | 1,278.50 | 275.00 | 1,406.35 | 154.00 | 787.56 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.668 | MILE | 600.00 | 1,000.80 | 950.00 | 1,584.60 | 600.00 | 1,000.80 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 17.723 | MILE | 600.00 | 10,633.80 | 1,100.00 | 19,495.30 | 1,250.00 | 22,153.75 | | 0034 | 726-01-00100 | Bedding Material | 73.7 | CUYD | 115.00 | 8,475.50 | 200.00 | 14,740.00 | 165.00 | 12,160.50 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 195,000.00 | 195,000.00 | 260,000.00 | 260,000.00 | 280,000.00 | 280,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 17 | EACH | 120.00 | 2,040.00 | 110.00 | 1,870.00 | 110.00 | 1,870.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 135.00 | 2,160.00 | 110.00 | 1,760.00 | 130.00 | 2,080.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,055 | EACH | 8.00 | 8,440.00 | 17.00 | 17,935.00 | 7.00 | 7,385.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 16 | LNFT | 32.00 | 512.00 | 21.00 | 336.00 | 32.00 | 512.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.513 | MILE | 6,000.00 | 99,078.00 | 5,600.00 | 92,472.80 | 5,500.00 | 90,821.50 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.668 | MILE | 1,200.00 | 2,001.60 | 2,200.00 | 3,669.60 | 1,250.00 | 2,085.00 | | 0042 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.112 | MILE | 12,000.00 | 1,344.00 | 6,000.00 | 672.00 | 11,000.00 | 1,232.00 | | 0043 | 735-01-00100 | Mailboxes | 34 | EACH | 30.00 | 1,020.00 | 26.00 | 884.00 | 1.00 | 34.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 225.00 | 6,750.00 | 200.00 | 6,000.00 | 300.00 | 9,000.00 | | 0045 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 350.00 | 700.00 | 225.00 | 450.00 | 300.00 | 600.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 0.23 | ACRE | 7,500.00 | 1,725.00 | 14,000.00 | 3,220.00 | 22,000.00 | 5,060.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | | 0048 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 21 | EACH | 3,000.00 | 63,000.00 | 1,200.00 | 25,200.00 | 1,850.00 | 38,850.00 | | 0049 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 3 | EACH | 4,500.00 | 13,500.00 | 1,400.00 | 4,200.00 | 2,900.00 | 8,700.00 | | 0050 | NS-719-00002 | Tree Trimming | 1 | LUMP | 20,000.00 | 20,000.00 | 120,000.00 | 120,000.00 | 56,000.00 | 56,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,376,290.95 | | 2,619,032.65 | | 2,867,982.86 |
|