Proposal:H.014791.6
Parish:Evangeline
Routes:LA 106
Description:LA 106: LA 10 - LA 13
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$9,457,667.85
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $8,545,901.82 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $9,860,644.23 |
| 3 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $10,392,027.43 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 560 | SQYD | 50.00 | 28,000.00 | 21.00 | 11,760.00 | 32.00 | 17,920.00 | | 0002 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 25,000.00 | 25,000.00 | 18,250.00 | 18,250.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 54 | SQYD | 125.00 | 6,750.00 | 55.00 | 2,970.00 | 40.00 | 2,160.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 300 | LNFT | 15.00 | 4,500.00 | 16.00 | 4,800.00 | 15.25 | 4,575.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,400 | CUYD | 70.00 | 98,000.00 | 48.00 | 67,200.00 | 40.00 | 56,000.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 54 | EACH | 145.00 | 7,830.00 | 150.00 | 8,100.00 | 150.00 | 8,100.00 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 148,409 | SQYD | 11.00 | 1,632,499.00 | 10.55 | 1,565,714.95 | 12.00 | 1,780,908.00 | | 0008 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 73,664 | SQYD | 10.00 | 736,640.00 | 14.00 | 1,031,296.00 | 16.25 | 1,197,040.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,976 | CUYD | 40.00 | 119,040.00 | 84.00 | 249,984.00 | 57.00 | 169,632.00 | | 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 75.00 | 15,000.00 | 40.00 | 8,000.00 | 55.00 | 11,000.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 38,735.1 | TON | 113.00 | 4,377,066.30 | 128.00 | 4,958,092.80 | 122.00 | 4,725,682.20 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,224.2 | TON | 130.00 | 159,146.00 | 235.00 | 287,687.00 | 235.00 | 287,687.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 119,509 | SQYD | 2.40 | 286,821.60 | 2.55 | 304,747.95 | 2.30 | 274,870.70 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -8,663 | CUYD | 0.01 | -86.63 | 1.00 | -8,663.00 | 1.00 | -8,663.00 | | 0015 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 58 | SQYD | 210.00 | 12,180.00 | 305.00 | 17,690.00 | 310.00 | 17,980.00 | | 0016 | 602-12-00100 | Undersealing Pavement | 2 | TON | 5,500.00 | 11,000.00 | 40,000.00 | 80,000.00 | 16,000.00 | 32,000.00 | | 0017 | 602-14-00100 | Holes | 8 | EACH | 600.00 | 4,800.00 | 1,000.00 | 8,000.00 | 900.00 | 7,200.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 300 | LNFT | 35.00 | 10,500.00 | 35.00 | 10,500.00 | 35.25 | 10,575.00 | | 0019 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 95.00 | 4,750.00 | 95.00 | 4,750.00 | 100.00 | 5,000.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 130.00 | 13,000.00 | 130.00 | 13,000.00 | 135.00 | 13,500.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,200.00 | 16,800.00 | 4,250.00 | 17,000.00 | 4,250.00 | 17,000.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 54 | SQYD | 100.00 | 5,400.00 | 85.00 | 4,590.00 | 165.00 | 8,910.00 | | 0023 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 200.00 | 10,800.00 | 55.00 | 2,970.00 | 275.00 | 14,850.00 | | 0024 | 712-02-00100 | Sacked Concrete Revetment | 500 | SQYD | 200.00 | 100,000.00 | 250.00 | 125,000.00 | 450.00 | 225,000.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 110,000.00 | 110,000.00 | 95,000.00 | 95,000.00 | | 0026 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 81 | LNFT | 0.75 | 60.75 | 1.00 | 81.00 | 1.05 | 85.05 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 207 | LNFT | 1.00 | 207.00 | 1.00 | 207.00 | 2.05 | 424.35 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 426 | LNFT | 2.00 | 852.00 | 2.00 | 852.00 | 3.60 | 1,533.60 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.507 | MILE | 600.00 | 16,504.20 | 154.00 | 4,236.08 | 290.00 | 7,977.03 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 23.262 | MILE | 850.00 | 19,772.70 | 875.00 | 20,354.25 | 1,000.00 | 23,262.00 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 76.914 | MILE | 1,425.00 | 109,602.45 | 1,500.00 | 115,371.00 | 1,150.00 | 88,451.10 | | 0032 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 4,500.00 | 4,500.00 | 12,500.00 | 12,500.00 | | 0033 | 724-01-00100 | Rumble Strips (Centerline) | 9.132 | MILE | 1,000.00 | 9,132.00 | 1,000.00 | 9,132.00 | 575.00 | 5,250.90 | | 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 18.264 | MILE | 1,000.00 | 18,264.00 | 1,000.00 | 18,264.00 | 575.00 | 10,501.80 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 305,000.00 | 305,000.00 | 522,000.00 | 522,000.00 | 1,025,000.00 | 1,025,000.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 104 | EACH | 130.00 | 13,520.00 | 130.00 | 13,520.00 | 135.00 | 14,040.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,593 | EACH | 8.15 | 12,982.95 | 8.50 | 13,540.50 | 5.25 | 8,363.25 | | 0038 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 27 | LNFT | 8.75 | 236.25 | 10.00 | 270.00 | 1.65 | 44.55 | | 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 69 | LNFT | 6.00 | 414.00 | 6.00 | 414.00 | 4.75 | 327.75 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 142 | LNFT | 21.15 | 3,003.30 | 22.00 | 3,124.00 | 20.50 | 2,911.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.638 | MILE | 6,150.00 | 157,673.70 | 6,200.00 | 158,955.60 | 5,100.00 | 130,753.80 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.754 | MILE | 3,125.00 | 24,231.25 | 3,150.00 | 24,425.10 | 2,275.00 | 17,640.35 | | 0043 | 732-05-00100 | Removal of Existing Markings | 0.042 | MILE | 12,000.00 | 504.00 | 12,000.00 | 504.00 | 9,750.00 | 409.50 | | 0044 | 735-01-00100 | Mailboxes | 50 | EACH | 25.00 | 1,250.00 | 1.00 | 50.00 | 1.05 | 52.50 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 50 | EACH | 195.00 | 9,750.00 | 205.00 | 10,250.00 | 200.00 | 10,000.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | | 0047 | 815-03-00300 | Joint Seal (Poured) | 264 | LNFT | 45.00 | 11,880.00 | 11.00 | 2,904.00 | 23.00 | 6,072.00 | | 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 250 | INLF | 2.50 | 625.00 | 65.00 | 16,250.00 | 10.00 | 2,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,545,901.82 | | 9,860,644.23 | | 10,392,027.43 |
|