Proposal:H.014670.6
Parish:Iberville
Routes:LA 1270
Description:LA 1270: LA77 TO END OF CONTROL SECTION
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,253,245.80
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,089,843.80 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,147,750.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 10 | SQYD | 25.00 | 250.00 | 360.00 | 3,600.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 3,728.6 | SQYD | 15.00 | 55,929.00 | 17.50 | 65,250.50 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 554 | SQYD | 24.00 | 13,296.00 | 11.75 | 6,509.50 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" Metal Round, 18" CMP Round, 27" Metal Round | 125 | LNFT | 30.00 | 3,750.00 | 26.50 | 3,312.50 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" Round pipe | 42 | LNFT | 30.00 | 1,260.00 | 26.00 | 1,092.00 | | 0006 | 203-01-00100 | General Excavation | 63 | CUYD | 40.00 | 2,520.00 | 214.00 | 13,482.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 60 | CUYD | 100.00 | 6,000.00 | 256.00 | 15,360.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 17 | EACH | 150.00 | 2,550.00 | 178.00 | 3,026.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,790 | LNFT | 1.75 | 4,882.50 | 1.75 | 4,882.50 | | 0010 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 3,728.6 | SQYD | 60.00 | 223,716.00 | 53.50 | 199,480.10 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 375.00 | 1,875.00 | 685.00 | 3,425.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 18.3 | CUYD | 175.00 | 3,202.50 | 350.00 | 6,405.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 2,267 | TON | 143.00 | 324,181.00 | 142.00 | 321,914.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 229.1 | TON | 185.00 | 42,383.50 | 208.00 | 47,652.80 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 4,112 | SQYD | 7.00 | 28,784.00 | 8.50 | 34,952.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -546 | CUYD | 0.00 | 0.00 | 0.01 | -5.46 | | 0017 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 263 | SQYD | 140.00 | 36,820.00 | 244.50 | 64,303.50 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,258 | LNFT | 1.50 | 4,887.00 | 4.50 | 14,661.00 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,440 | LNFT | 2.00 | 2,880.00 | 4.50 | 6,480.00 | | 0020 | 602-03-00100 | Cleaning and Sealing Random Cracks | 470 | LNFT | 5.00 | 2,350.00 | 5.00 | 2,350.00 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 78 | LNFT | 330.00 | 25,740.00 | 352.00 | 27,456.00 | | 0022 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 42 | LNFT | 350.00 | 14,700.00 | 380.00 | 15,960.00 | | 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 42 | LNFT | 330.00 | 13,860.00 | 382.00 | 16,044.00 | | 0024 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,500.00 | 3,500.00 | 1,885.00 | 1,885.00 | | 0025 | 706-01-00300 | Concrete Walk (6" Thick) | 4.8 | SQYD | 130.00 | 624.00 | 137.00 | 657.60 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 613.4 | SQYD | 135.00 | 82,809.00 | 137.00 | 84,035.80 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 46,000.00 | 46,000.00 | 50,000.00 | 50,000.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 11 | LNFT | 0.50 | 5.50 | 0.50 | 5.50 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.499 | MILE | 300.00 | 149.70 | 425.00 | 212.08 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.499 | MILE | 1,000.00 | 499.00 | 1,000.00 | 499.00 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.028 | MILE | 1,500.00 | 1,542.00 | 1,675.00 | 1,721.90 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 10,000.00 | 2,000.00 | 10,500.00 | 2,100.00 | | 0033 | 717-01-00100 | Seeding | 4 | LB | 82.00 | 328.00 | 91.50 | 366.00 | | 0034 | 718-01-00100 | Fertilizer | 107 | LB | 3.00 | 321.00 | 3.00 | 321.00 | | 0035 | 726-01-00100 | Bedding Material | 31.1 | CUYD | 150.00 | 4,665.00 | 140.00 | 4,354.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 67 | EACH | 11.00 | 737.00 | 11.00 | 737.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 11 | LNFT | 33.00 | 363.00 | 33.50 | 368.50 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.028 | MILE | 7,400.00 | 7,607.20 | 7,593.00 | 7,805.60 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.499 | MILE | 1,600.00 | 798.40 | 1,675.00 | 835.83 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 9,600.00 | 9,600.00 | | 0042 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,258 | LNFT | 1.00 | 3,258.00 | 3.25 | 10,588.50 | | 0043 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,440 | LNFT | 1.00 | 1,440.00 | 3.25 | 4,680.00 | | 0044 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 14,094 | LNFT | 0.25 | 3,523.50 | 0.50 | 7,047.00 | | 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 995 | INLF | 1.00 | 995.00 | 0.01 | 9.95 | | 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,862 | INLF | 1.00 | 5,862.00 | 1.25 | 7,327.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,089,843.80 | | 1,147,750.70 |
|