Search


Bid Tabulations for the Letting of 12/13/2023 LA DOTD Headquarters

Proposal:H.010345.6
Parish:Sabine
Routes:LA 175
Description:LA 175: N JCT LA 120 - RAY CANTON RD
Type Construction:BORROW, MILLING ASPHALT CONCRETE, LIME TREATMENT, INPLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE ROADWAY AND RELATED WORK.
Estimated Construction Cost:$2,932,183.04
Rank License BidderConstruction Bid
108584Madden Contracting Co., LLC$3,455,553.59
212312GILCHRIST CONSTRUCTION COMPANY, LLC$3,729,330.87


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Madden Contracting Co., LLC
- 2 -
GILCHRIST CONSTRUCTION COMPANY, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-06100Removal of Concrete Walks and Drives 138     SQYD15.002,070.0030.004,140.00
0002202-02-14500Removal of Guard Rail 890     LNFT15.0013,350.0015.2513,572.50
0003202-02-32100Removal of Pipe (Cross Drain) (24" RCP)12     LNFT20.00240.00150.001,800.00
0004202-02-32100Removal of Pipe (Cross Drain) (30" RCP)4     LNFT20.0080.00450.001,800.00
0005202-02-32180Removal of Pipe Headwalls 3     EACH1,200.003,600.00600.001,800.00
0006203-07-00100Borrow (Vehicular Measurement) 4,645     CUYD28.25131,221.2522.50104,512.50
0007203-10-00100Cleaning Existing Ditches 50     LNFT14.50725.0038.001,900.00
0008303-02-00100Removal of Existing Patches 4,556     SQYD11.0050,116.0012.0054,672.00
0009303-03-00400In-Place Cement Treated Base Course (12" Thick) 46,421.7   SQYD12.25568,665.8312.25568,665.83
0010304-01-00100Lime 209.26  TON300.0062,778.00375.0078,472.50
0011304-03-00400Lime Treatment (Type C) (12" Thick) 21,033     SQYD7.00147,231.006.75141,972.75
0012309-01-12000In-Place Cement Treated Subgrade (12" Thick) 21,033     SQYD12.50262,912.5013.50283,945.50
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,574     CUYD33.5052,729.0040.0062,960.00
0014502-01-00100Asphalt Concrete 8,563.9   TON135.001,156,126.50150.001,284,585.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 773     TON75.0057,975.00250.00193,250.00
0016509-01-00100Milling Asphalt Pavement 42,430     SQYD3.75159,112.504.00169,720.00
0017509-02-00100Contractor Retained Reclaimed Asphalt Pavement -3,356     CUYD0.10-335.601.00-3,356.00
0018701-10-01060Reinforced Concrete Pipe (Extension) (24") 24     LNFT318.007,632.00650.0015,600.00
0019701-10-01080Reinforced Concrete Pipe (Extension) (30") 8     LNFT370.002,960.00750.006,000.00
0020701-15-00100Concrete Collar 4     EACH2,250.009,000.003,250.0013,000.00
0021704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 376     LNFT85.0031,960.0090.0033,840.00
0022704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 450     LNFT35.0015,750.0040.0018,000.00
0023704-07-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT135.0027,000.00140.0028,000.00
0024704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 8     EACH3,800.0030,400.004,000.0032,000.00
0025707-04-00100Asphalt Curb 108     LNFT50.005,400.00140.0015,120.00
0026711-01-04000Riprap (55 lb, 18" Thick) 15     SQYD175.002,625.00225.003,375.00
0027711-04-00100Geotextile Fabric 15     SQYD5.0075.001.2518.75
0028713-01-00100Temporary Signs and Barricades 1     LUMP231,000.00231,000.0065,000.0065,000.00
0029713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 10.474 MILE350.003,665.90310.003,246.94
0030713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.824 MILE900.004,341.60950.004,582.80
0031713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 23.426 MILE1,385.0032,445.011,400.0032,796.40
0032716-01-00100Mulch (Vegetative) 3.4   TON1,250.004,250.00900.003,060.00
0033717-01-00100Seeding 102     LB25.002,550.0028.002,856.00
0034718-01-00100Fertilizer 1,700     LB1.001,700.000.55935.00
0035722-02-00100Project Site Laboratory (Equipped) 1     EACH10,000.0010,000.0012,500.0012,500.00
0036726-01-00100Bedding Material 9.1   CUYD119.001,082.90155.001,410.50
0037727-01-00100Mobilization 1     LUMP231,000.00231,000.00370,000.00370,000.00
0038729-16-00300Object Marker Assembly (Type 3) 8     EACH130.001,040.00135.001,080.00
0039731-02-00100Reflectorized Raised Pavement Markers 603     EACH9.005,427.009.505,728.50
0040732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 10.136 MILE6,300.0063,856.806,400.0064,870.40
0041732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.412 MILE2,950.007,115.403,000.007,236.00
0042732-05-00100Removal of Existing Markings 0.036 MILE12,500.00450.0011,000.00396.00
0043735-01-00100Mailboxes 18     EACH20.00360.0032.00576.00
0044735-02-00100Mailbox Supports (Single) 18     EACH215.003,870.00205.003,690.00
0045740-01-00100Construction Layout 1     LUMP50,000.0050,000.0020,000.0020,000.00
         
  CONTRACTOR TOTAL   3,455,553.59 3,729,330.87