Proposal:H.010345.6
Parish:Sabine
Routes:LA 175
Description:LA 175: N JCT LA 120 - RAY CANTON RD
Type Construction:BORROW, MILLING ASPHALT CONCRETE, LIME TREATMENT, INPLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE ROADWAY AND RELATED WORK.
Estimated Construction Cost:$2,932,183.04
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $3,455,553.59 |
| 2 | 12312 | GILCHRIST CONSTRUCTION COMPANY, LLC | $3,729,330.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 138 | SQYD | 15.00 | 2,070.00 | 30.00 | 4,140.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 890 | LNFT | 15.00 | 13,350.00 | 15.25 | 13,572.50 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 12 | LNFT | 20.00 | 240.00 | 150.00 | 1,800.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 4 | LNFT | 20.00 | 80.00 | 450.00 | 1,800.00 | | 0005 | 202-02-32180 | Removal of Pipe Headwalls | 3 | EACH | 1,200.00 | 3,600.00 | 600.00 | 1,800.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,645 | CUYD | 28.25 | 131,221.25 | 22.50 | 104,512.50 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 50 | LNFT | 14.50 | 725.00 | 38.00 | 1,900.00 | | 0008 | 303-02-00100 | Removal of Existing Patches | 4,556 | SQYD | 11.00 | 50,116.00 | 12.00 | 54,672.00 | | 0009 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 46,421.7 | SQYD | 12.25 | 568,665.83 | 12.25 | 568,665.83 | | 0010 | 304-01-00100 | Lime | 209.26 | TON | 300.00 | 62,778.00 | 375.00 | 78,472.50 | | 0011 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 21,033 | SQYD | 7.00 | 147,231.00 | 6.75 | 141,972.75 | | 0012 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 21,033 | SQYD | 12.50 | 262,912.50 | 13.50 | 283,945.50 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,574 | CUYD | 33.50 | 52,729.00 | 40.00 | 62,960.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 8,563.9 | TON | 135.00 | 1,156,126.50 | 150.00 | 1,284,585.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 773 | TON | 75.00 | 57,975.00 | 250.00 | 193,250.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 42,430 | SQYD | 3.75 | 159,112.50 | 4.00 | 169,720.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,356 | CUYD | 0.10 | -335.60 | 1.00 | -3,356.00 | | 0018 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 24 | LNFT | 318.00 | 7,632.00 | 650.00 | 15,600.00 | | 0019 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 370.00 | 2,960.00 | 750.00 | 6,000.00 | | 0020 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,250.00 | 9,000.00 | 3,250.00 | 13,000.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 376 | LNFT | 85.00 | 31,960.00 | 90.00 | 33,840.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 450 | LNFT | 35.00 | 15,750.00 | 40.00 | 18,000.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 140.00 | 28,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,800.00 | 30,400.00 | 4,000.00 | 32,000.00 | | 0025 | 707-04-00100 | Asphalt Curb | 108 | LNFT | 50.00 | 5,400.00 | 140.00 | 15,120.00 | | 0026 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 15 | SQYD | 175.00 | 2,625.00 | 225.00 | 3,375.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 15 | SQYD | 5.00 | 75.00 | 1.25 | 18.75 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 231,000.00 | 231,000.00 | 65,000.00 | 65,000.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.474 | MILE | 350.00 | 3,665.90 | 310.00 | 3,246.94 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.824 | MILE | 900.00 | 4,341.60 | 950.00 | 4,582.80 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.426 | MILE | 1,385.00 | 32,445.01 | 1,400.00 | 32,796.40 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 3.4 | TON | 1,250.00 | 4,250.00 | 900.00 | 3,060.00 | | 0033 | 717-01-00100 | Seeding | 102 | LB | 25.00 | 2,550.00 | 28.00 | 2,856.00 | | 0034 | 718-01-00100 | Fertilizer | 1,700 | LB | 1.00 | 1,700.00 | 0.55 | 935.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | | 0036 | 726-01-00100 | Bedding Material | 9.1 | CUYD | 119.00 | 1,082.90 | 155.00 | 1,410.50 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 231,000.00 | 231,000.00 | 370,000.00 | 370,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 130.00 | 1,040.00 | 135.00 | 1,080.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 603 | EACH | 9.00 | 5,427.00 | 9.50 | 5,728.50 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.136 | MILE | 6,300.00 | 63,856.80 | 6,400.00 | 64,870.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.412 | MILE | 2,950.00 | 7,115.40 | 3,000.00 | 7,236.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.036 | MILE | 12,500.00 | 450.00 | 11,000.00 | 396.00 | | 0043 | 735-01-00100 | Mailboxes | 18 | EACH | 20.00 | 360.00 | 32.00 | 576.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 18 | EACH | 215.00 | 3,870.00 | 205.00 | 3,690.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,455,553.59 | | 3,729,330.87 |
|