Proposal:H.014712.6
Parish:Natchitoches
Routes:LA 504, LA 6
Description:LA 6: ROUNDABOUT AT LA 504
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, CONCRETE DRIVES, DETOUR ROAD, AND RELATED WORK.
Estimated Construction Cost:$4,177,380.10
| Rank | License | Bidder | Construction Bid |
| 1 | 40486 | REGIONAL CONSTRUCTION, LLC | $4,446,279.28 |
| 2 | 55505 | MERRICK, LLC | $4,693,619.60 |
| 3 | 27239 | Apeck Construction, LLC | $5,124,451.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - REGIONAL CONSTRUCTION, LLC | - 2 - MERRICK, LLC | - 3 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 20,000.00 | 20,000.00 | 19,075.48 | 19,075.48 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 7,959.5 | SQYD | 10.00 | 79,595.00 | 10.00 | 79,595.00 | 11.47 | 91,295.47 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,700.00 | 1,700.00 | 650.00 | 650.00 | 1,032.46 | 1,032.46 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,108 | SQYD | 9.00 | 9,972.00 | 9.00 | 9,972.00 | 14.90 | 16,509.20 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) REMOVAL OF CONCRETE CURBING AROUND EXISTING FLOWERBED | 180 | LNFT | 30.00 | 5,400.00 | 9.00 | 1,620.00 | 26.23 | 4,721.40 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (EXIST. 24" RCP) | 40 | LNFT | 20.00 | 800.00 | 20.00 | 800.00 | 33.38 | 1,335.20 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (EXIST. 30" RCP) | 148 | LNFT | 20.00 | 2,960.00 | 20.00 | 2,960.00 | 27.42 | 4,058.16 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (EXIST. 48" RCP) | 151 | LNFT | 30.00 | 4,530.00 | 20.00 | 3,020.00 | 41.73 | 6,301.23 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 435 | SQYD | 15.00 | 6,525.00 | 20.00 | 8,700.00 | 7.15 | 3,110.25 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 300,000.00 | 300,000.00 | 400,000.00 | 400,000.00 | 265,449.64 | 265,449.64 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 37 | EACH | 150.00 | 5,550.00 | 200.00 | 7,400.00 | 178.83 | 6,616.71 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 875 | LNFT | 6.00 | 5,250.00 | 7.00 | 6,125.00 | 5.96 | 5,215.00 | | 0013 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 12,235.2 | SQYD | 17.00 | 207,998.40 | 20.00 | 244,704.00 | 37.41 | 457,718.83 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 90.00 | 45,000.00 | 125.00 | 62,500.00 | 66.76 | 33,380.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 4,403.1 | TON | 186.00 | 818,976.60 | 225.00 | 990,697.50 | 252.18 | 1,110,373.76 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 5,902 | SQYD | 5.50 | 32,461.00 | 7.00 | 41,314.00 | 5.80 | 34,231.60 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -380 | CUYD | 0.01 | -3.80 | 0.01 | -3.80 | 1.32 | -501.60 | | 0018 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 24 | LNFT | 550.00 | 13,200.00 | 315.00 | 7,560.00 | 555.57 | 13,333.68 | | 0019 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 40 | LNFT | 300.00 | 12,000.00 | 315.00 | 12,600.00 | 425.62 | 17,024.80 | | 0020 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 312 | LNFT | 350.00 | 109,200.00 | 320.00 | 99,840.00 | 474.50 | 148,044.00 | | 0021 | 701-06-00120 | Side Drain Pipe Arch (48" Equiv. RCPA) | 264 | LNFT | 400.00 | 105,600.00 | 320.00 | 84,480.00 | 425.62 | 112,363.68 | | 0022 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,300.00 | 2,300.00 | 2,000.00 | 2,000.00 | 5,961.09 | 5,961.09 | | 0023 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 7,000.00 | 14,000.00 | 9,000.00 | 18,000.00 | 9,800.03 | 19,600.06 | | 0024 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 5,500.00 | 5,500.00 | 7,000.00 | 7,000.00 | 8,834.33 | 8,834.33 | | 0025 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 3,500.00 | 3,500.00 | 6,735.22 | 6,735.22 | | 0026 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,200.00 | 3,200.00 | 3,500.00 | 3,500.00 | 6,735.22 | 6,735.22 | | 0027 | 706-01-00100 | Concrete Walk (4" Thick) | 486 | SQYD | 118.00 | 57,348.00 | 110.00 | 53,460.00 | 123.06 | 59,807.16 | | 0028 | 706-02-00400 | Concrete Drive (10" Thick) | 1,475 | SQYD | 160.00 | 236,000.00 | 135.00 | 199,125.00 | 165.32 | 243,847.00 | | 0029 | 706-03-00300 | Incidental Concrete Paving (6" Thick) CATCH BASIN APRON | 16.9 | SQYD | 240.00 | 4,056.00 | 215.00 | 3,633.50 | 256.26 | 4,330.79 | | 0030 | 706-03-00300 | Incidental Concrete Paving (6" Thick) MANHOLE APRON | 4 | SQYD | 240.00 | 960.00 | 385.00 | 1,540.00 | 531.88 | 2,127.52 | | 0031 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (10" THICK) (APPROACH NOSE) | 12.7 | SQYD | 300.00 | 3,810.00 | 250.00 | 3,175.00 | 270.64 | 3,437.13 | | 0032 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (10" THICK) (SPLITTER ISLAND) | 438.1 | SQYD | 250.00 | 109,525.00 | 215.00 | 94,191.50 | 231.76 | 101,534.06 | | 0033 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (10" THICK) (TRUCK APRON) | 350.4 | SQYD | 250.00 | 87,600.00 | 215.00 | 75,336.00 | 231.77 | 81,212.21 | | 0034 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" THICK) (TRUCK APRON) | 574.4 | SQYD | 200.00 | 114,880.00 | 170.00 | 97,648.00 | 155.02 | 89,043.49 | | 0035 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (9" THICK) (LANE DIVIDER) | 190.8 | SQYD | 225.00 | 42,930.00 | 200.00 | 38,160.00 | 304.33 | 58,066.16 | | 0036 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (9" THICK) (TRUCK APRON) | 165.9 | SQYD | 225.00 | 37,327.50 | 200.00 | 33,180.00 | 196.06 | 32,526.35 | | 0037 | 706-04-00110 | Curb Ramps (2 - TYPE 6 RAMPS, AND 1 - TYPE 7 RAMPS) | 40.7 | SQYD | 300.00 | 12,210.00 | 215.00 | 8,750.50 | 398.91 | 16,235.64 | | 0038 | 706-04-00110 | Curb Ramps (2 - TYPE 6 RAMPS, AND 2 - TYPE 8 RAMPS) | 58.4 | SQYD | 300.00 | 17,520.00 | 215.00 | 12,556.00 | 370.46 | 21,634.86 | | 0039 | 706-04-00110 | Curb Ramps (4 - TYPE 6 RAMPS, AND 4 - TYPE 7 RAMPS) | 108 | SQYD | 300.00 | 32,400.00 | 215.00 | 23,220.00 | 396.75 | 42,849.00 | | 0040 | 707-01-00100 | Concrete Curb | 470.2 | LNFT | 50.00 | 23,510.00 | 30.00 | 14,106.00 | 57.46 | 27,017.69 | | 0041 | 707-03-00100 | Combination Concrete Curb and Gutter | 4,025.7 | LNFT | 85.00 | 342,184.50 | 55.00 | 221,413.50 | 67.07 | 270,003.70 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 350,000.00 | 350,000.00 | 206,287.37 | 206,287.37 | | 0043 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,934 | LNFT | 0.27 | 522.18 | 0.30 | 580.20 | 0.30 | 580.20 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 402 | LNFT | 0.45 | 180.90 | 0.50 | 201.00 | 0.48 | 192.96 | | 0045 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.27 | MILE | 1,400.00 | 378.00 | 1,500.00 | 405.00 | 1,549.89 | 418.47 | | 0046 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.803 | MILE | 1,750.00 | 11,905.25 | 1,900.00 | 12,925.70 | 1,912.67 | 13,011.89 | | 0047 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 4 | EACH | 110.00 | 440.00 | 123.00 | 492.00 | 119.22 | 476.88 | | 0048 | 713-05-00600 | Temporary Pavement Legends & Symbols (U-Turn) | 6 | EACH | 135.00 | 810.00 | 150.00 | 900.00 | 149.03 | 894.18 | | 0049 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 9,595 | SQYD | 10.00 | 95,950.00 | 11.00 | 105,545.00 | 14.90 | 142,965.50 | | 0050 | 715-01-00100 | Topsoil | 120 | CUYD | 60.00 | 7,200.00 | 35.00 | 4,200.00 | 54.84 | 6,580.80 | | 0051 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,983 | SQYD | 2.00 | 7,966.00 | 2.00 | 7,966.00 | 2.09 | 8,324.47 | | 0052 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 4,523 | SQYD | 2.00 | 9,046.00 | 2.00 | 9,046.00 | 2.09 | 9,453.07 | | 0053 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 13,174.01 | 13,174.01 | | 0054 | 725-01-00100 | Temporary Detour Roads | 1,326.2 | SQYD | 120.00 | 159,144.00 | 115.00 | 152,513.00 | 338.21 | 448,534.10 | | 0055 | 726-01-00100 | Bedding Material | 124.9 | CUYD | 140.00 | 17,486.00 | 120.00 | 14,988.00 | 177.64 | 22,187.24 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 470,000.00 | 470,000.00 | 135,607.18 | 135,607.18 | | 0057 | 729-01-00100 | Sign (Type A) | 209 | SQFT | 40.00 | 8,360.00 | 40.00 | 8,360.00 | 53.65 | 11,212.85 | | 0058 | 729-02-00100 | Sign (Type B) | 273 | SQFT | 40.00 | 10,920.00 | 44.00 | 12,012.00 | 53.65 | 14,646.45 | | 0059 | 729-04-00100 | Sign (Type D) | 113 | SQFT | 40.00 | 4,520.00 | 44.00 | 4,972.00 | 53.65 | 6,062.45 | | 0060 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 54 | EACH | 200.00 | 10,800.00 | 215.00 | 11,610.00 | 220.56 | 11,910.24 | | 0061 | 731-02-00100 | Reflectorized Raised Pavement Markers | 902 | EACH | 10.00 | 9,020.00 | 11.00 | 9,922.00 | 10.73 | 9,678.46 | | 0062 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 967 | LNFT | 5.00 | 4,835.00 | 5.00 | 4,835.00 | 5.36 | 5,183.12 | | 0063 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 329 | LNFT | 20.00 | 6,580.00 | 23.00 | 7,567.00 | 23.25 | 7,649.25 | | 0064 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.928 | MILE | 8,000.00 | 23,424.00 | 9,500.00 | 27,816.00 | 9,305.65 | 27,246.94 | | 0065 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.631 | MILE | 5,500.00 | 3,470.50 | 6,500.00 | 4,101.50 | 6,308.75 | 3,980.82 | | 0066 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.093 | MILE | 5,000.00 | 465.00 | 5,500.00 | 511.50 | 5,191.94 | 482.85 | | 0067 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.171 | MILE | 18,000.00 | 3,078.00 | 20,000.00 | 3,420.00 | 19,556.55 | 3,344.17 | | 0068 | 732-03-02060 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 90 mil) | 0.061 | MILE | 80,000.00 | 4,880.00 | 75,000.00 | 4,575.00 | 71,533.11 | 4,363.52 | | 0069 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 500.00 | 1,000.00 | 600.00 | 1,200.00 | 566.31 | 1,132.62 | | 0070 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 850.00 | 3,400.00 | 1,000.00 | 4,000.00 | 953.78 | 3,815.12 | | 0071 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 6 | EACH | 850.00 | 5,100.00 | 1,000.00 | 6,000.00 | 953.78 | 5,722.68 | | 0072 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 6 | EACH | 2,200.00 | 13,200.00 | 2,500.00 | 15,000.00 | 2,384.44 | 14,306.64 | | 0073 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 6 | EACH | 2,300.00 | 13,800.00 | 2,700.00 | 16,200.00 | 2,533.46 | 15,200.76 | | 0074 | 736-10-00200 | Underground Junction Box (Type E) | 8 | EACH | 2,000.00 | 16,000.00 | 1,800.00 | 14,400.00 | 4,751.15 | 38,009.20 | | 0075 | 736-11-00400 | Conduit (4" HDPE, Schedule 80) | 368 | LNFT | 40.00 | 14,720.00 | 50.00 | 18,400.00 | 76.91 | 28,302.88 | | 0076 | 740-01-00100 | Construction Layout | 1 | LUMP | 125,000.00 | 125,000.00 | 75,000.00 | 75,000.00 | 108,268.64 | 108,268.64 | | 0077 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 65,985 | INLF | 0.70 | 46,189.50 | 1.00 | 65,985.00 | 1.79 | 118,113.15 | | 0078 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,371 | INLF | 1.25 | 1,713.75 | 2.00 | 2,742.00 | 3.58 | 4,908.18 | | 0079 | NS-702-00100 | Paved Gutter Drain | 36 | EACH | 2,500.00 | 90,000.00 | 6,000.00 | 216,000.00 | 5,763.22 | 207,475.92 | | 0080 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 14 | EACH | 700.00 | 9,800.00 | 800.00 | 11,200.00 | 894.16 | 12,518.24 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,446,279.28 | | 4,693,619.60 | | 5,124,451.10 |
|