Proposal:H.009298.6
Parish:Allen
Routes:LA 1151, LA 26
Description:TOWN OF OBERLIN SIDEWALKS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CONCRETE DRIVES, SHARED-USE PATH, AND RELATED WORK.
Estimated Construction Cost:$1,230,524.00
| Rank | License | Bidder | Construction Bid |
| 1 | 54663 | CAPE Construction, LLC | $730,687.82 |
| 2 | 55276 | Turner & Turner Contracting, LLC | $1,003,681.29 |
| 3 | 55505 | MERRICK, LLC | $1,086,883.90 |
| 4 | 30774 | Progressive Construction Co., LLC | $1,206,295.50 |
| 5 | 39104 | RMK Construction Company LLC | $1,400,425.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - CAPE Construction, LLC | - 2 - Turner & Turner Contracting, LLC | - 3 - MERRICK, LLC | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 19,000.00 | 19,000.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 158.4 | SQYD | 7.94 | 1,257.70 | 63.06 | 9,988.70 | 20.00 | 3,168.00 | 25.00 | 3,960.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,536 | SQYD | 33.65 | 51,686.40 | 9.94 | 15,267.84 | 15.00 | 23,040.00 | 25.00 | 38,400.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 55 | LNFT | 24.00 | 1,320.00 | 34.05 | 1,872.75 | 20.00 | 1,100.00 | 25.00 | 1,375.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 250.00 | 2,000.00 | 64.90 | 519.20 | 200.00 | 1,600.00 | 20.00 | 160.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 12,750.00 | 12,750.00 | 21,189.87 | 21,189.87 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 42 | EACH | 22.92 | 962.64 | 15.58 | 654.36 | 35.00 | 1,470.00 | 55.00 | 2,310.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 7,000 | LNFT | 1.60 | 11,200.00 | 0.81 | 5,670.00 | 2.00 | 14,000.00 | 2.50 | 17,500.00 | | 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 7 | CUYD | 1.40 | 9.80 | 212.19 | 1,485.33 | 200.00 | 1,400.00 | 150.00 | 1,050.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5 | CUYD | 40.00 | 200.00 | 260.73 | 1,303.65 | 200.00 | 1,000.00 | 150.00 | 750.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 18 | CUYD | 38.00 | 684.00 | 185.23 | 3,334.14 | 200.00 | 3,600.00 | 150.00 | 2,700.00 | | 0013 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 208 | LNFT | 65.00 | 13,520.00 | 116.78 | 24,290.24 | 150.00 | 31,200.00 | 185.00 | 38,480.00 | | 0014 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 609 | LNFT | 65.46 | 39,865.14 | 110.14 | 67,075.26 | 150.00 | 91,350.00 | 185.00 | 112,665.00 | | 0015 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 30 | LNFT | 110.87 | 3,326.10 | 146.95 | 4,408.50 | 200.00 | 6,000.00 | 220.00 | 6,600.00 | | 0016 | 701-07-00400 | Yard Drain Pipe (10") | 20 | LNFT | 62.50 | 1,250.00 | 12.82 | 256.40 | 125.00 | 2,500.00 | 60.00 | 1,200.00 | | 0017 | 701-07-00500 | Yard Drain Pipe (12") | 12 | LNFT | 65.00 | 780.00 | 20.08 | 240.96 | 135.00 | 1,620.00 | 65.00 | 780.00 | | 0018 | 701-07-00700 | Yard Drain Pipe (18") | 8 | LNFT | 74.00 | 592.00 | 67.78 | 542.24 | 145.00 | 1,160.00 | 140.00 | 1,120.00 | | 0019 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,410.00 | 1,410.00 | 885.00 | 885.00 | 2,500.00 | 2,500.00 | 3,000.00 | 3,000.00 | | 0020 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 6,345.00 | 31,725.00 | 5,431.22 | 27,156.10 | 8,500.00 | 42,500.00 | 7,800.00 | 39,000.00 | | 0021 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 3 | EACH | 1,620.00 | 4,860.00 | 1,125.00 | 3,375.00 | 5,000.00 | 15,000.00 | 7,000.00 | 21,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 911.8 | SQYD | 54.99 | 50,139.88 | 89.44 | 81,551.39 | 108.00 | 98,474.40 | 115.00 | 104,857.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 1,916 | SQYD | 81.50 | 156,154.00 | 88.08 | 168,761.28 | 113.00 | 216,508.00 | 100.00 | 191,600.00 | | 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 5 | SQYD | 82.41 | 412.05 | 84.31 | 421.55 | 500.00 | 2,500.00 | 300.00 | 1,500.00 | | 0025 | 706-04-00110 | Curb Ramps (Type 3) | 9.3 | SQYD | 235.00 | 2,185.50 | 282.75 | 2,629.58 | 700.00 | 6,510.00 | 425.00 | 3,952.50 | | 0026 | 707-01-00100 | Concrete Curb | 16.3 | LNFT | 55.75 | 908.73 | 61.02 | 994.63 | 100.00 | 1,630.00 | 60.00 | 978.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 13,437.00 | 13,437.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | | 0028 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,550 | SQYD | 9.73 | 15,081.50 | 15.03 | 23,296.50 | 20.00 | 31,000.00 | 22.00 | 34,100.00 | | 0029 | 726-01-00100 | Bedding Material | 89.6 | CUYD | 89.34 | 8,004.86 | 172.63 | 15,467.65 | 150.00 | 13,440.00 | 150.00 | 13,440.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 68,000.00 | 68,000.00 | 249,399.74 | 249,399.74 | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | | 0031 | 729-01-00101 | Sign (Type A)(Install) | 35.5 | SQFT | 17.00 | 603.50 | 32.45 | 1,151.98 | 45.00 | 1,597.50 | 70.00 | 2,485.00 | | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 205.00 | 1,845.00 | 220.66 | 1,985.94 | 130.00 | 1,170.00 | 280.00 | 2,520.00 | | 0033 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 275.00 | 275.00 | 259.60 | 259.60 | 165.00 | 165.00 | 435.00 | 435.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 180 | LNFT | 30.00 | 5,400.00 | 53.10 | 9,558.00 | 45.00 | 8,100.00 | 55.00 | 9,900.00 | | 0035 | 732-05-00100 | Removal of Existing Markings | 0.016 | MILE | 60,000.00 | 960.00 | 88,500.00 | 1,416.00 | 12,000.00 | 192.00 | 112,000.00 | 1,792.00 | | 0036 | 737-06-00002 | Painted Islands (Yellow) | 5 | SQYD | 29.50 | 147.50 | 295.00 | 1,475.00 | 165.00 | 825.00 | 300.00 | 1,500.00 | | 0037 | 739-01-00100 | Hydro-Seeding | 1.5 | ACRE | 2,232.01 | 3,348.02 | 4,192.94 | 6,289.41 | 3,500.00 | 5,250.00 | 4,500.00 | 6,750.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0039 | 741-35-00100 | Adjust Valve or Meter Box | 2 | EACH | 1,137.00 | 2,274.00 | 472.00 | 944.00 | 900.00 | 1,800.00 | 950.00 | 1,900.00 | | 0040 | 805-01-00500 | Class A1 Concrete (Footing) | 1.9 | CUYD | 1,000.00 | 1,900.00 | 380.64 | 723.22 | 4,200.00 | 7,980.00 | 5,000.00 | 9,500.00 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 120 | LB | 2.25 | 270.00 | 0.78 | 93.60 | 3.00 | 360.00 | 15.00 | 1,800.00 | | 0042 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 1 | EACH | 1,500.00 | 1,500.00 | 6,619.80 | 6,619.80 | 7,800.00 | 7,800.00 | 3,500.00 | 3,500.00 | | 0043 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 144 | INLF | 3.00 | 432.00 | 5.40 | 777.60 | 11.00 | 1,584.00 | 4.00 | 576.00 | | 0044 | NS-700-00100 | Trench Drains | 5 | EACH | 2,500.00 | 12,500.00 | 1,819.47 | 9,097.35 | 5,000.00 | 25,000.00 | 4,400.00 | 22,000.00 | | 0045 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 1,946 | SQYD | 63.50 | 123,571.00 | 87.96 | 171,170.16 | 90.00 | 175,140.00 | 85.00 | 165,410.00 | | 0046 | NS-719-00002 | Tree Trimming | 1 | LUMP | 1,000.00 | 1,000.00 | 13,275.00 | 13,275.00 | 3,500.00 | 3,500.00 | 9,200.00 | 9,200.00 | | 0047 | NS-719-00003 | Root Pruning | 1 | LUMP | 1,000.00 | 1,000.00 | 5,900.00 | 5,900.00 | 3,500.00 | 3,500.00 | 3,100.00 | 3,100.00 | | 0048 | TS-707-23060 | Wheel Stops | 12 | EACH | 175.00 | 2,100.00 | 51.92 | 623.04 | 550.00 | 6,600.00 | 350.00 | 4,200.00 | | 0049 | TS-800-00300 | Handrail | 49 | LNFT | 148.50 | 7,276.50 | 241.77 | 11,846.73 | 450.00 | 22,050.00 | 250.00 | 12,250.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 730,687.82 | | 1,003,681.29 | | 1,086,883.90 | | 1,206,295.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - RMK Construction Company LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 19,500.00 | 19,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 18,000.00 | 18,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 158.4 | SQYD | 15.00 | 2,376.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,536 | SQYD | 17.50 | 26,880.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 55 | LNFT | 18.00 | 990.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 25.00 | 200.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 41,000.00 | 41,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 42 | EACH | 15.00 | 630.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 7,000 | LNFT | 3.50 | 24,500.00 | | 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 7 | CUYD | 165.00 | 1,155.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5 | CUYD | 165.00 | 825.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 18 | CUYD | 165.00 | 2,970.00 | | 0013 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 208 | LNFT | 198.00 | 41,184.00 | | 0014 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 609 | LNFT | 198.00 | 120,582.00 | | 0015 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 30 | LNFT | 215.00 | 6,450.00 | | 0016 | 701-07-00400 | Yard Drain Pipe (10") | 20 | LNFT | 110.00 | 2,200.00 | | 0017 | 701-07-00500 | Yard Drain Pipe (12") | 12 | LNFT | 124.00 | 1,488.00 | | 0018 | 701-07-00700 | Yard Drain Pipe (18") | 8 | LNFT | 189.00 | 1,512.00 | | 0019 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,500.00 | 1,500.00 | | 0020 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 6,250.00 | 31,250.00 | | 0021 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 3 | EACH | 5,300.00 | 15,900.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 911.8 | SQYD | 141.00 | 128,563.80 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 1,916 | SQYD | 165.00 | 316,140.00 | | 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 5 | SQYD | 165.00 | 825.00 | | 0025 | 706-04-00110 | Curb Ramps (Type 3) | 9.3 | SQYD | 1,500.00 | 13,950.00 | | 0026 | 707-01-00100 | Concrete Curb | 16.3 | LNFT | 56.00 | 912.80 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,000.00 | 28,000.00 | | 0028 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,550 | SQYD | 21.00 | 32,550.00 | | 0029 | 726-01-00100 | Bedding Material | 89.6 | CUYD | 129.00 | 11,558.40 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 53,000.00 | 53,000.00 | | 0031 | 729-01-00101 | Sign (Type A)(Install) | 35.5 | SQFT | 145.00 | 5,147.50 | | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 500.00 | 4,500.00 | | 0033 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 1 | EACH | 550.00 | 550.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 180 | LNFT | 68.00 | 12,240.00 | | 0035 | 732-05-00100 | Removal of Existing Markings | 0.016 | MILE | 50,000.00 | 800.00 | | 0036 | 737-06-00002 | Painted Islands (Yellow) | 5 | SQYD | 500.00 | 2,500.00 | | 0037 | 739-01-00100 | Hydro-Seeding | 1.5 | ACRE | 4,500.00 | 6,750.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,500.00 | 18,500.00 | | 0039 | 741-35-00100 | Adjust Valve or Meter Box | 2 | EACH | 1,250.00 | 2,500.00 | | 0040 | 805-01-00500 | Class A1 Concrete (Footing) | 1.9 | CUYD | 5,500.00 | 10,450.00 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 120 | LB | 5.00 | 600.00 | | 0042 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 1 | EACH | 9,500.00 | 9,500.00 | | 0043 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 144 | INLF | 3.00 | 432.00 | | 0044 | NS-700-00100 | Trench Drains | 5 | EACH | 2,800.00 | 14,000.00 | | 0045 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 1,946 | SQYD | 149.00 | 289,954.00 | | 0046 | NS-719-00002 | Tree Trimming | 1 | LUMP | 17,500.00 | 17,500.00 | | 0047 | NS-719-00003 | Root Pruning | 1 | LUMP | 17,500.00 | 17,500.00 | | 0048 | TS-707-23060 | Wheel Stops | 12 | EACH | 550.00 | 6,600.00 | | 0049 | TS-800-00300 | Handrail | 49 | LNFT | 690.00 | 33,810.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,400,425.50 |
|