Proposal:H.014320.6
Parish:East Baton Rouge
Description:VAN BUREN STREET OVER CORPORATION CANAL
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, DRAINAGE STRUCTURES, ASPHALT CONCRETE, AND RELATED WORK.
Estimated Construction Cost:$849,215.50
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $794,616.15 |
| 2 | 69770 | Omega Foundation Services | $884,210.00 |
| 3 | 28190 | Buck Town Contractors & Co. | $932,002.85 |
| 4 | 46716 | BRUDD CONSTRUCTION CO., LLC | $1,245,323.00 |
| 5 | 61167 | HENDRICK CONSTRUCTION, INC. | $1,682,618.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - Omega Foundation Services | - 3 - Buck Town Contractors & Co. | - 4 - BRUDD CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.04 | LUMP | 5,000.00 | 5,000.00 | 1,925.00 | 1,925.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 26,700.00 | 26,700.00 | 1,900.00 | 1,900.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 295.3 | SQYD | 45.00 | 13,288.50 | 22.60 | 6,673.78 | 25.00 | 7,382.50 | 20.00 | 5,906.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 30+00, 32' WIDE X 41' LONG, CONCRETE SLAB BRIDGE WITH TIMBER PILES) | 1,312 | LUMP | 30,000.00 | 30,000.00 | 40,400.00 | 40,400.00 | 56,500.00 | 56,500.00 | 55,000.00 | 55,000.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 44.6 | LNFT | 35.00 | 1,561.00 | 24.00 | 1,070.40 | 10.00 | 446.00 | 20.00 | 892.00 | | 0006 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 30,000.00 | 30,000.00 | 7,000.00 | 7,000.00 | 22,700.00 | 22,700.00 | 54,000.00 | 54,000.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 17 | SQYD | 35.00 | 595.00 | 40.00 | 680.00 | 30.00 | 510.00 | 500.00 | 8,500.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 310 | LNFT | 5.00 | 1,550.00 | 3.65 | 1,131.50 | 6.00 | 1,860.00 | 18.00 | 5,580.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,500.00 | 5,500.00 | 38,400.00 | 38,400.00 | 3,300.00 | 3,300.00 | 6,600.00 | 6,600.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 50.00 | 400.00 | 16.00 | 128.00 | 30.00 | 240.00 | 59.00 | 472.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 350.00 | 700.00 | 62.00 | 124.00 | 50.00 | 100.00 | 413.00 | 826.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 166 | LNFT | 10.00 | 1,660.00 | 5.00 | 830.00 | 1.00 | 166.00 | 11.80 | 1,958.80 | | 0013 | 302-02-08530 | Class II Base Course (8-1/2" Thick) (Asphalt Concrete Base on Embankment Layer) | 292.8 | SQYD | 125.00 | 36,600.00 | 141.00 | 41,284.80 | 159.00 | 46,555.20 | 113.00 | 33,086.40 | | 0014 | 304-01-00100 | Lime | 4.15 | TON | 1.00 | 4.15 | 150.00 | 622.50 | 915.00 | 3,797.25 | 295.00 | 1,224.25 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 293 | SQYD | 1.00 | 293.00 | 8.25 | 2,417.25 | 35.00 | 10,255.00 | 20.00 | 5,860.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 5.00 | 250.00 | 106.00 | 5,300.00 | 110.00 | 5,500.00 | 155.00 | 7,750.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 55.9 | TON | 365.00 | 20,403.50 | 487.00 | 27,223.30 | 765.00 | 42,763.50 | 450.00 | 25,155.00 | | 0018 | 701-05-01066 | Side Drain Pipe (24" RCP) | 14 | LNFT | 325.00 | 4,550.00 | 210.00 | 2,940.00 | 175.00 | 2,450.00 | 210.00 | 2,940.00 | | 0019 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 40 | LNFT | 275.00 | 11,000.00 | 195.00 | 7,800.00 | 140.00 | 5,600.00 | 155.00 | 6,200.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 24 | LNFT | 1.00 | 24.00 | 365.00 | 8,760.00 | 40.00 | 960.00 | 50.00 | 1,200.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 7,000.00 | 7,000.00 | 6,200.00 | 6,200.00 | 4,800.00 | 4,800.00 | 9,005.00 | 9,005.00 | | 0022 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 98 | LNFT | 55.00 | 5,390.00 | 61.00 | 5,978.00 | 63.00 | 6,174.00 | 93.00 | 9,114.00 | | 0023 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 194 | LNFT | 55.00 | 10,670.00 | 61.00 | 11,834.00 | 69.00 | 13,386.00 | 92.00 | 17,848.00 | | 0024 | 705-07-02020 | 4-Foot Single Gates for Chain Link Fence (5-Foot Height) | 1 | EACH | 2,500.00 | 2,500.00 | 2,360.00 | 2,360.00 | 230.00 | 230.00 | 1,500.00 | 1,500.00 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 65.4 | SQYD | 100.00 | 6,540.00 | 108.50 | 7,095.90 | 125.00 | 8,175.00 | 114.00 | 7,455.60 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 18.6 | SQYD | 200.00 | 3,720.00 | 181.00 | 3,366.60 | 138.00 | 2,566.80 | 300.00 | 5,580.00 | | 0027 | 707-03-00100 | Combination Concrete Curb and Gutter | 140.2 | LNFT | 75.00 | 10,515.00 | 54.00 | 7,570.80 | 63.00 | 8,832.60 | 85.00 | 11,917.00 | | 0028 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 57 | SQYD | 100.00 | 5,700.00 | 120.00 | 6,840.00 | 133.00 | 7,581.00 | 90.00 | 5,130.00 | | 0029 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 506 | SQYD | 100.00 | 50,600.00 | 125.00 | 63,250.00 | 169.00 | 85,514.00 | 180.00 | 91,080.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 49,500.00 | 49,500.00 | 11,300.00 | 11,300.00 | 20,000.00 | 20,000.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 5,000.00 | 500.00 | 4,225.00 | 422.50 | 6,400.00 | 640.00 | 20,000.00 | 2,000.00 | | 0032 | 717-01-00100 | Seeding | 1 | LB | 507.00 | 507.00 | 71.00 | 71.00 | 600.00 | 600.00 | 600.00 | 600.00 | | 0033 | 718-01-00100 | Fertilizer | 38 | LB | 25.00 | 950.00 | 4.00 | 152.00 | 3.00 | 114.00 | 10.30 | 391.40 | | 0034 | 726-01-00100 | Bedding Material | 92 | CUYD | 90.00 | 8,280.00 | 104.00 | 9,568.00 | 167.00 | 15,364.00 | 130.00 | 11,960.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 72,899.97 | 72,899.97 | 65,800.00 | 65,800.00 | 175,000.00 | 175,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 150.00 | 600.00 | 110.00 | 440.00 | 140.00 | 560.00 | 100.00 | 400.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 31 | EACH | 30.00 | 930.00 | 45.00 | 1,395.00 | 57.00 | 1,767.00 | 63.00 | 1,953.00 | | 0038 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 2,429 | LNFT | 3.00 | 7,287.00 | 4.50 | 10,930.50 | 3.00 | 7,287.00 | 3.15 | 7,651.35 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 35,807.00 | 35,807.00 | 11,200.00 | 11,200.00 | 10,000.00 | 10,000.00 | | 0040 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') ASTM C 1577 | 117 | LNFT | 2,300.00 | 269,100.00 | 2,400.00 | 280,800.00 | 2,075.00 | 242,775.00 | 4,250.00 | 497,250.00 | | 0041 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 3 - 10' x 9' @ 90 DEGREES, (STEEL=3,672 POUNDS, CONCRETE = 37.71) | 2 | EACH | 42,000.00 | 84,000.00 | 42,000.00 | 84,000.00 | 107,500.00 | 215,000.00 | 58,000.00 | 116,000.00 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 97 | INLF | 2.00 | 194.00 | 2.20 | 213.40 | 1.00 | 97.00 | 6.20 | 601.40 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 877 | INLF | 2.00 | 1,754.00 | 2.40 | 2,104.80 | 2.00 | 1,754.00 | 5.40 | 4,735.80 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 794,616.15 | | 884,210.00 | | 932,002.85 | | 1,245,323.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - HENDRICK CONSTRUCTION, INC. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.04 | LUMP | 40,672.91 | 40,672.91 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 84,130.91 | 84,130.91 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 295.3 | SQYD | 128.68 | 37,999.20 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 30+00, 32' WIDE X 41' LONG, CONCRETE SLAB BRIDGE WITH TIMBER PILES) | 1,312 | LUMP | 97,510.80 | 97,510.80 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 44.6 | LNFT | 215.28 | 9,601.49 | | 0006 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 63,187.53 | 63,187.53 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 17 | SQYD | 122.13 | 2,076.21 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 310 | LNFT | 32.54 | 10,087.40 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 73,571.54 | 73,571.54 | | 0010 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 277.58 | 2,220.64 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 1,377.50 | 2,755.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 166 | LNFT | 35.98 | 5,972.68 | | 0013 | 302-02-08530 | Class II Base Course (8-1/2" Thick) (Asphalt Concrete Base on Embankment Layer) | 292.8 | SQYD | 157.76 | 46,192.13 | | 0014 | 304-01-00100 | Lime | 4.15 | TON | 1,173.99 | 4,872.06 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 293 | SQYD | 103.18 | 30,231.74 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 225.35 | 11,267.50 | | 0017 | 502-01-00100 | Asphalt Concrete | 55.9 | TON | 421.55 | 23,564.65 | | 0018 | 701-05-01066 | Side Drain Pipe (24" RCP) | 14 | LNFT | 384.78 | 5,386.92 | | 0019 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | 40 | LNFT | 270.46 | 10,818.40 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 24 | LNFT | 214.74 | 5,153.76 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 13,410.64 | 13,410.64 | | 0022 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 98 | LNFT | 92.15 | 9,030.70 | | 0023 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 194 | LNFT | 46.55 | 9,030.70 | | 0024 | 705-07-02020 | 4-Foot Single Gates for Chain Link Fence (5-Foot Height) | 1 | EACH | 5,499.29 | 5,499.29 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 65.4 | SQYD | 204.51 | 13,374.95 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 18.6 | SQYD | 361.40 | 6,722.04 | | 0027 | 707-03-00100 | Combination Concrete Curb and Gutter | 140.2 | LNFT | 130.80 | 18,338.16 | | 0028 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 57 | SQYD | 190.00 | 10,830.00 | | 0029 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 506 | SQYD | 196.16 | 99,256.96 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,857.00 | 65,857.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 8,906.16 | 890.62 | | 0032 | 717-01-00100 | Seeding | 1 | LB | 890.62 | 890.62 | | 0033 | 718-01-00100 | Fertilizer | 38 | LB | 44.53 | 1,692.14 | | 0034 | 726-01-00100 | Bedding Material | 92 | CUYD | 101.53 | 9,340.76 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 125,554.00 | 125,554.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 305.52 | 1,222.08 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 31 | EACH | 12.22 | 378.82 | | 0038 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 2,429 | LNFT | 12.22 | 29,682.38 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 37,500.00 | 37,500.00 | | 0040 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') ASTM C 1577 | 117 | LNFT | 3,885.59 | 454,614.03 | | 0041 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 3 - 10' x 9' @ 90 DEGREES, (STEEL=3,672 POUNDS, CONCRETE = 37.71) | 2 | EACH | 93,450.49 | 186,900.98 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 97 | INLF | 16.98 | 1,647.06 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 877 | INLF | 15.60 | 13,681.20 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,682,618.60 |
|