Proposal:H.008170.6
Parish:Livingston
Routes:LA 1024
Description:LA 1024 CREEK BRS. NEAR FRIENDSHIP
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TREATED TIMBER TRESTLE BRIDGE, GRADING, DRAINAGE STRUCTURES, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$1,893,500.50
| Rank | License | Bidder | Construction Bid |
| 1 | 61167 | HENDRICK CONSTRUCTION, INC. | $1,891,733.15 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $2,071,294.93 |
| 3 | 69770 | Omega Foundation Services | $2,105,150.00 |
| 4 | 57931 | KCR CONTRACTORS, LLC | $2,159,093.89 |
| 5 | 05693 | Industrial Enterprises, Inc. | $2,334,247.49 |
| 6 | 46716 | BRUDD CONSTRUCTION CO., LLC | $2,368,280.03 |
| 7 | 28190 | Buck Town Contractors & Co. | $2,418,901.90 |
| 8 | 55950 | Brown Industrial Construction, LLC | $2,536,837.73 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HENDRICK CONSTRUCTION, INC. | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - Omega Foundation Services | - 4 - KCR CONTRACTORS, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.446 | LUMP | 40,402.25 | 40,402.25 | 35,000.00 | 35,000.00 | 51,500.00 | 51,500.00 | 91,677.48 | 91,677.48 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 93 | SQYD | 84.62 | 7,869.66 | 21.50 | 1,999.50 | 62.00 | 5,766.00 | 12.19 | 1,133.67 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,679.5 | SQYD | 22.11 | 37,133.75 | 37.75 | 63,401.13 | 20.00 | 33,590.00 | 9.84 | 16,526.28 | | 0004 | 202-02-04501 | Removal of Bridge STRUCTURE NO. 623208321005771, 39' X 23.9', Treated Timber Trestle Bridge | 871.2 | LUMP | 12,756.75 | 12,756.75 | 25,000.00 | 25,000.00 | 35,600.00 | 35,600.00 | 18,023.13 | 18,023.13 | | 0005 | 202-02-04501 | Removal of Bridge STRUCTURE NO. 623208321008101, 39' X 24', Treated Timber Trestle Bridge | 877 | LUMP | 12,756.75 | 12,756.75 | 25,000.00 | 25,000.00 | 35,600.00 | 35,600.00 | 18,023.13 | 18,023.13 | | 0006 | 202-02-12000 | Removal of Fence | 537 | LNFT | 17.20 | 9,236.40 | 10.00 | 5,370.00 | 6.60 | 3,544.20 | 6.18 | 3,318.66 | | 0007 | 202-02-14500 | Removal of Guard Rail | 589.6 | LNFT | 26.73 | 15,760.01 | 23.00 | 13,560.80 | 9.00 | 5,306.40 | 22.00 | 12,971.20 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMPA | 40 | LNFT | 56.46 | 2,258.40 | 12.00 | 480.00 | 60.00 | 2,400.00 | 12.37 | 494.80 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 20 | EACH | 46.78 | 935.60 | 40.00 | 800.00 | 355.60 | 7,112.00 | 38.50 | 770.00 | | 0010 | 203-01-00100 | General Excavation | 901 | CUYD | 45.00 | 40,545.00 | 25.00 | 22,525.00 | 45.00 | 40,545.00 | 19.43 | 17,506.43 | | 0011 | 203-03-00100 | Embankment | 1,940 | CUYD | 56.19 | 109,008.60 | 38.50 | 74,690.00 | 41.00 | 79,540.00 | 31.35 | 60,819.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 568.54 | 4,548.32 | 250.00 | 2,000.00 | 50.00 | 400.00 | 192.50 | 1,540.00 | | 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 695.25 | 5,562.00 | 750.00 | 6,000.00 | 393.00 | 3,144.00 | 600.00 | 4,800.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 1,350 | LNFT | 6.34 | 8,559.00 | 4.00 | 5,400.00 | 2.90 | 3,915.00 | 2.20 | 2,970.00 | | 0015 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,433 | SQYD | 43.15 | 104,983.95 | 51.00 | 124,083.00 | 57.00 | 138,681.00 | 63.03 | 153,351.99 | | 0016 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 2,861.98 | 11,447.92 | 7,000.00 | 28,000.00 | 710.00 | 2,840.00 | 1,759.00 | 7,036.00 | | 0017 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 2,524 | SQYD | 51.46 | 129,885.04 | 54.00 | 136,296.00 | 27.65 | 69,788.60 | 26.73 | 67,466.52 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 13 | CUYD | 380.81 | 4,950.53 | 190.00 | 2,470.00 | 241.70 | 3,142.10 | 473.19 | 6,151.47 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 65.00 | 16,250.00 | 190.00 | 47,500.00 | 135.00 | 33,750.00 | 60.00 | 15,000.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 501.3 | TON | 232.62 | 116,612.41 | 180.00 | 90,234.00 | 225.35 | 112,967.96 | 171.60 | 86,023.08 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 18.8 | TON | 704.21 | 13,239.15 | 600.00 | 11,280.00 | 808.00 | 15,190.40 | 550.00 | 10,340.00 | | 0022 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 240 | LNFT | 140.90 | 33,816.00 | 75.00 | 18,000.00 | 82.65 | 19,836.00 | 97.94 | 23,505.60 | | 0023 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 80 | LNFT | 169.92 | 13,593.60 | 92.00 | 7,360.00 | 69.70 | 5,576.00 | 125.90 | 10,072.00 | | 0024 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 40 | LNFT | 294.34 | 11,773.60 | 165.00 | 6,600.00 | 136.00 | 5,440.00 | 199.59 | 7,983.60 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 256 | LNFT | 16.17 | 4,139.52 | 18.00 | 4,608.00 | 147.75 | 37,824.00 | 14.40 | 3,686.40 | | 0026 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 5,136.89 | 20,547.56 | 4,200.00 | 16,800.00 | 4,122.00 | 16,488.00 | 3,177.86 | 12,711.44 | | 0027 | 705-01-00100 | Barbed Wire Fence | 32 | LNFT | 100.25 | 3,208.00 | 45.00 | 1,440.00 | 12.50 | 400.00 | 82.50 | 2,640.00 | | 0028 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 104 | LNFT | 66.83 | 6,950.32 | 30.00 | 3,120.00 | 12.25 | 1,274.00 | 55.00 | 5,720.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 24 | EACH | 389.87 | 9,356.88 | 900.00 | 21,600.00 | 300.00 | 7,200.00 | 330.00 | 7,920.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 24 | EACH | 111.39 | 2,673.36 | 350.00 | 8,400.00 | 196.00 | 4,704.00 | 330.00 | 7,920.00 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 274 | SQYD | 188.72 | 51,709.28 | 235.00 | 64,390.00 | 77.00 | 21,098.00 | 147.45 | 40,401.30 | | 0032 | 711-04-00100 | Geotextile Fabric | 274 | SQYD | 1.21 | 331.54 | 4.50 | 1,233.00 | 3.10 | 849.40 | 2.46 | 674.04 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 34,111.31 | 34,111.31 | 60,000.00 | 60,000.00 | 98,000.00 | 98,000.00 | 19,739.78 | 19,739.78 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 3 | TON | 1,517.73 | 4,553.19 | 1,100.00 | 3,300.00 | 395.00 | 1,185.00 | 825.00 | 2,475.00 | | 0035 | 717-01-00100 | Seeding | 43 | LB | 55.42 | 2,383.06 | 45.00 | 1,935.00 | 11.50 | 494.50 | 19.80 | 851.40 | | 0036 | 718-01-00100 | Fertilizer | 1,446 | LB | 3.83 | 5,538.18 | 1.50 | 2,169.00 | 1.60 | 2,313.60 | 0.94 | 1,359.24 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,429 | SQYD | 6.06 | 8,659.74 | 2.00 | 2,858.00 | 12.50 | 17,862.50 | 1.93 | 2,757.97 | | 0038 | 726-01-00100 | Bedding Material | 517.1 | CUYD | 74.92 | 38,741.13 | 175.00 | 90,492.50 | 120.00 | 62,052.00 | 109.04 | 56,384.58 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 75,014.72 | 75,014.72 | 95,000.00 | 95,000.00 | 92,270.00 | 92,270.00 | 189,154.88 | 189,154.88 | | 0040 | 729-01-00100 | Sign (Type A) | 36.8 | SQFT | 46.78 | 1,721.50 | 40.00 | 1,472.00 | 47.00 | 1,729.60 | 38.50 | 1,416.80 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 113.62 | 908.96 | 100.00 | 800.00 | 114.35 | 914.80 | 93.50 | 748.00 | | 0042 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 5 | EACH | 334.17 | 1,670.85 | 300.00 | 1,500.00 | 336.35 | 1,681.75 | 275.00 | 1,375.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 31 | EACH | 126.34 | 3,916.54 | 30.00 | 930.00 | 40.35 | 1,250.85 | 55.00 | 1,705.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.446 | MILE | 26,044.31 | 11,615.76 | 30,000.00 | 13,380.00 | 20,180.00 | 9,000.28 | 16,500.00 | 7,359.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 29,736.33 | 2,051.81 | 30,000.00 | 2,070.00 | 20,180.00 | 1,392.42 | 16,500.00 | 1,138.50 | | 0046 | 735-01-00100 | Mailboxes | 3 | EACH | 66.83 | 200.49 | 24.00 | 72.00 | 27.00 | 81.00 | 22.00 | 66.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 66.83 | 200.49 | 300.00 | 900.00 | 337.00 | 1,011.00 | 275.00 | 825.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,050.23 | 20,050.23 | 20,000.00 | 20,000.00 | 23,825.24 | 23,825.24 | 21,600.00 | 21,600.00 | | 0049 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 704 | LNFT | 870.18 | 612,606.72 | 980.00 | 689,920.00 | 1,165.00 | 820,160.00 | 1,289.53 | 907,829.12 | | 0050 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Quantity of steel = 4,799.6 pounds, quantity of concrete = 48.504 cubic yards. | 4 | EACH | 48,016.29 | 192,065.16 | 50,000.00 | 200,000.00 | 37,260.00 | 149,040.00 | 52,336.60 | 209,346.40 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,268 | INLF | 3.76 | 4,767.68 | 2.00 | 2,536.00 | 1.55 | 1,965.40 | 1.25 | 1,585.00 | | 0052 | NS-705-00001 | Wire Mesh Fence (4-Foot Height) | 244 | LNFT | 33.42 | 8,154.48 | 30.00 | 7,320.00 | 57.00 | 13,908.00 | 50.00 | 12,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,891,733.15 | | 2,071,294.93 | | 2,105,150.00 | | 2,159,093.89 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Industrial Enterprises, Inc. | - 6 - BRUDD CONSTRUCTION CO., LLC | - 7 - Buck Town Contractors & Co. | - 8 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.446 | LUMP | 33,120.00 | 33,120.00 | 56,000.00 | 56,000.00 | 7,200.00 | 7,200.00 | 200,000.00 | 200,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 93 | SQYD | 118.71 | 11,040.03 | 25.00 | 2,325.00 | 15.00 | 1,395.00 | 57.00 | 5,301.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,679.5 | SQYD | 18.87 | 31,692.17 | 8.00 | 13,436.00 | 25.00 | 41,987.50 | 10.00 | 16,795.00 | | 0004 | 202-02-04501 | Removal of Bridge STRUCTURE NO. 623208321005771, 39' X 23.9', Treated Timber Trestle Bridge | 871.2 | LUMP | 53,120.00 | 53,120.00 | 16,500.00 | 16,500.00 | 58,300.00 | 58,300.00 | 97,000.00 | 97,000.00 | | 0005 | 202-02-04501 | Removal of Bridge STRUCTURE NO. 623208321008101, 39' X 24', Treated Timber Trestle Bridge | 877 | LUMP | 53,640.00 | 53,640.00 | 22,000.00 | 22,000.00 | 91,200.00 | 91,200.00 | 97,000.00 | 97,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 537 | LNFT | 10.27 | 5,514.99 | 7.00 | 3,759.00 | 5.00 | 2,685.00 | 5.55 | 2,980.35 | | 0007 | 202-02-14500 | Removal of Guard Rail | 589.6 | LNFT | 27.20 | 16,037.12 | 18.00 | 10,612.80 | 6.00 | 3,537.60 | 20.00 | 11,792.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMPA | 40 | LNFT | 138.00 | 5,520.00 | 40.00 | 1,600.00 | 32.00 | 1,280.00 | 30.00 | 1,200.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 20 | EACH | 69.00 | 1,380.00 | 75.00 | 1,500.00 | 25.00 | 500.00 | 35.00 | 700.00 | | 0010 | 203-01-00100 | General Excavation | 901 | CUYD | 42.57 | 38,355.57 | 13.00 | 11,713.00 | 22.00 | 19,822.00 | 20.00 | 18,020.00 | | 0011 | 203-03-00100 | Embankment | 1,940 | CUYD | 25.34 | 49,159.60 | 28.00 | 54,320.00 | 25.00 | 48,500.00 | 45.00 | 87,300.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 221.28 | 1,770.24 | 200.00 | 1,600.00 | 50.00 | 400.00 | 195.00 | 1,560.00 | | 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 1,840.00 | 14,720.00 | 534.00 | 4,272.00 | 100.00 | 800.00 | 1,200.00 | 9,600.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 1,350 | LNFT | 2.81 | 3,793.50 | 2.36 | 3,186.00 | 1.00 | 1,350.00 | 2.75 | 3,712.50 | | 0015 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,433 | SQYD | 55.81 | 135,785.73 | 55.00 | 133,815.00 | 40.00 | 97,320.00 | 39.00 | 94,887.00 | | 0016 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 1,840.09 | 7,360.36 | 500.00 | 2,000.00 | 2,850.00 | 11,400.00 | 1,300.00 | 5,200.00 | | 0017 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 2,524 | SQYD | 11.95 | 30,161.80 | 43.00 | 108,532.00 | 40.00 | 100,960.00 | 39.00 | 98,436.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 13 | CUYD | 199.30 | 2,590.90 | 316.00 | 4,108.00 | 140.00 | 1,820.00 | 195.00 | 2,535.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 168.95 | 42,237.50 | 149.00 | 37,250.00 | 105.00 | 26,250.00 | 160.00 | 40,000.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 501.3 | TON | 205.08 | 102,806.60 | 184.00 | 92,239.20 | 249.00 | 124,823.70 | 156.00 | 78,202.80 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 18.8 | TON | 351.49 | 6,608.01 | 560.00 | 10,528.00 | 198.00 | 3,722.40 | 500.00 | 9,400.00 | | 0022 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 240 | LNFT | 146.73 | 35,215.20 | 150.00 | 36,000.00 | 120.00 | 28,800.00 | 124.00 | 29,760.00 | | 0023 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 80 | LNFT | 172.14 | 13,771.20 | 171.00 | 13,680.00 | 160.00 | 12,800.00 | 150.00 | 12,000.00 | | 0024 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 40 | LNFT | 298.71 | 11,948.40 | 293.00 | 11,720.00 | 200.00 | 8,000.00 | 185.00 | 7,400.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 256 | LNFT | 175.94 | 45,040.64 | 16.00 | 4,096.00 | 35.00 | 8,960.00 | 10.50 | 2,688.00 | | 0026 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 8,819.30 | 35,277.20 | 3,700.00 | 14,800.00 | 3,250.00 | 13,000.00 | 5,000.00 | 20,000.00 | | 0027 | 705-01-00100 | Barbed Wire Fence | 32 | LNFT | 45.86 | 1,467.52 | 88.50 | 2,832.00 | 40.00 | 1,280.00 | 40.00 | 1,280.00 | | 0028 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 104 | LNFT | 29.69 | 3,087.76 | 59.00 | 6,136.00 | 40.00 | 4,160.00 | 26.00 | 2,704.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 24 | EACH | 414.00 | 9,936.00 | 725.00 | 17,400.00 | 500.00 | 12,000.00 | 650.00 | 15,600.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 24 | EACH | 101.20 | 2,428.80 | 240.00 | 5,760.00 | 325.00 | 7,800.00 | 200.00 | 4,800.00 | | 0031 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 274 | SQYD | 180.55 | 49,470.70 | 95.00 | 26,030.00 | 162.00 | 44,388.00 | 135.00 | 36,990.00 | | 0032 | 711-04-00100 | Geotextile Fabric | 274 | SQYD | 22.24 | 6,093.76 | 4.50 | 1,233.00 | 1.00 | 274.00 | 7.50 | 2,055.00 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 44,500.00 | 44,500.00 | 36,000.00 | 36,000.00 | 27,000.00 | 27,000.00 | 45,000.00 | 45,000.00 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 3 | TON | 1,147.50 | 3,442.50 | 885.00 | 2,655.00 | 4,000.00 | 12,000.00 | 1,000.00 | 3,000.00 | | 0035 | 717-01-00100 | Seeding | 43 | LB | 37.58 | 1,615.94 | 56.00 | 2,408.00 | 25.00 | 1,075.00 | 33.00 | 1,419.00 | | 0036 | 718-01-00100 | Fertilizer | 1,446 | LB | 1.36 | 1,966.56 | 1.00 | 1,446.00 | 3.00 | 4,338.00 | 1.20 | 1,735.20 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,429 | SQYD | 2.29 | 3,272.41 | 2.07 | 2,958.03 | 1.50 | 2,143.50 | 1.50 | 2,143.50 | | 0038 | 726-01-00100 | Bedding Material | 517.1 | CUYD | 236.76 | 122,428.60 | 135.00 | 69,808.50 | 167.00 | 86,355.70 | 145.00 | 74,979.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 310,000.00 | 310,000.00 | 240,000.00 | 240,000.00 | 250,000.00 | 250,000.00 | | 0040 | 729-01-00100 | Sign (Type A) | 36.8 | SQFT | 28.75 | 1,058.00 | 45.00 | 1,656.00 | 40.00 | 1,472.00 | 35.00 | 1,288.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 86.25 | 690.00 | 100.00 | 800.00 | 165.00 | 1,320.00 | 85.00 | 680.00 | | 0042 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 5 | EACH | 172.50 | 862.50 | 294.00 | 1,470.00 | 285.00 | 1,425.00 | 250.00 | 1,250.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 31 | EACH | 57.50 | 1,782.50 | 59.00 | 1,829.00 | 60.00 | 1,860.00 | 30.00 | 930.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.446 | MILE | 17,250.00 | 7,693.50 | 17,700.00 | 7,894.20 | 17,300.00 | 7,715.80 | 15,200.00 | 6,779.20 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.069 | MILE | 17,250.00 | 1,190.25 | 17,700.00 | 1,221.30 | 17,300.00 | 1,193.70 | 15,200.00 | 1,048.80 | | 0046 | 735-01-00100 | Mailboxes | 3 | EACH | 1.15 | 3.45 | 24.00 | 72.00 | 150.00 | 450.00 | 20.00 | 60.00 | | 0047 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 172.50 | 517.50 | 295.00 | 885.00 | 350.00 | 1,050.00 | 250.00 | 750.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,900.00 | 6,900.00 | 16,322.00 | 16,322.00 | 22,300.00 | 22,300.00 | 20,000.00 | 20,000.00 | | 0049 | 805-15-00900 | Reinforced Concrete Box Culverts (Precast) (8' x 5') | 704 | LNFT | 1,366.86 | 962,269.44 | 1,334.00 | 939,136.00 | 1,110.00 | 781,440.00 | 1,250.00 | 880,000.00 | | 0050 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Quantity of steel = 4,799.6 pounds, quantity of concrete = 48.504 cubic yards. | 4 | EACH | 47,103.71 | 188,414.84 | 55,000.00 | 220,000.00 | 106,700.00 | 426,800.00 | 55,000.00 | 220,000.00 | | 0051 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,268 | INLF | 1.15 | 1,458.20 | 5.00 | 6,340.00 | 1.00 | 1,268.00 | 1.66 | 2,104.88 | | 0052 | NS-705-00001 | Wire Mesh Fence (4-Foot Height) | 244 | LNFT | 57.50 | 14,030.00 | 59.00 | 14,396.00 | 45.00 | 10,980.00 | 27.75 | 6,771.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,334,247.49 | | 2,368,280.03 | | 2,418,901.90 | | 2,536,837.73 |
|