Proposal:H.013813.6
Parish:Jefferson
Description:VINTAGE DR MU PATH: POWER - WILSON
Type Construction:GRADING, DRAINAGE STRUCTURES, LANDSCAPING, LIGHTING, CONCRETE PATH, AND RELATED WORK.
Estimated Construction Cost:$1,728,204.40
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | La Contracting Enterprise LLC | $1,742,909.50 |
| 2 | 36961 | Cycle Construction Co. L.L.C. | $2,178,094.85 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $2,249,610.35 |
| 4 | 24901 | Hard Rock Construction LLC | $2,281,461.95 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,315,313.40 |
| 6 | 12702 | J. CALDARERA & COMPANY, INC. | $2,547,520.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - La Contracting Enterprise LLC | - 2 - Cycle Construction Co. L.L.C. | - 3 - Boh Bros. Construction Co., LLC. | - 4 - Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,700.00 | 10,700.00 | 5,385.00 | 5,385.00 | 10,000.00 | 10,000.00 | 7,200.00 | 7,200.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 34.8 | SQYD | 44.00 | 1,531.20 | 46.50 | 1,618.20 | 52.00 | 1,809.60 | 29.00 | 1,009.20 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 64 | LNFT | 33.00 | 2,112.00 | 30.00 | 1,920.00 | 16.00 | 1,024.00 | 20.00 | 1,280.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 222 | SQYD | 45.00 | 9,990.00 | 20.50 | 4,551.00 | 26.00 | 5,772.00 | 24.00 | 5,328.00 | | 0005 | 203-01-00100 | General Excavation | 2,233 | CUYD | 23.00 | 51,359.00 | 31.00 | 69,223.00 | 25.00 | 55,825.00 | 38.00 | 84,854.00 | | 0006 | 203-03-00100 | Embankment | 357 | CUYD | 94.00 | 33,558.00 | 71.50 | 25,525.50 | 60.00 | 21,420.00 | 135.00 | 48,195.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 6,554 | SQYD | 2.40 | 15,729.60 | 4.00 | 26,216.00 | 2.50 | 16,385.00 | 2.00 | 13,108.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,287 | LNFT | 2.30 | 7,560.10 | 4.75 | 15,613.25 | 3.50 | 11,504.50 | 3.00 | 9,861.00 | | 0009 | 701-07-00500 | Yard Drain Pipe (12") | 2,268 | LNFT | 30.00 | 68,040.00 | 75.00 | 170,100.00 | 75.00 | 170,100.00 | 148.00 | 335,664.00 | | 0010 | 706-01-00100 | Concrete Walk (4" Thick) | 354 | SQYD | 78.00 | 27,612.00 | 59.00 | 20,886.00 | 145.00 | 51,330.00 | 126.00 | 44,604.00 | | 0011 | 707-01-00100 | Concrete Curb | 74.5 | LNFT | 54.00 | 4,023.00 | 82.00 | 6,109.00 | 55.00 | 4,097.50 | 58.00 | 4,321.00 | | 0012 | 707-03-00100 | Combination Concrete Curb and Gutter | 58 | LNFT | 102.00 | 5,916.00 | 146.00 | 8,468.00 | 82.00 | 4,756.00 | 110.00 | 6,380.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 31,800.15 | 31,800.15 | 36,000.00 | 36,000.00 | 32,000.00 | 32,000.00 | | 0014 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 5,235 | SQYD | 9.70 | 50,779.50 | 12.75 | 66,746.25 | 12.50 | 65,437.50 | 12.00 | 62,820.00 | | 0015 | 719-01-02000 | Plants (Tree) (Container) (1 inch cal) MagnoliaVirginiana 'Sweet BayMagnolia'45 Gallon Container1" CaliperMultitrunk 3 Trunk Min, Full,4'-5'MinSprd 10-12'MinHt | 5 | EACH | 1,100.00 | 5,500.00 | 492.00 | 2,460.00 | 485.00 | 2,425.00 | 460.00 | 2,300.00 | | 0016 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Lagerstroeia Indica x Fauriei 'Natchez Crape Myrtle.45GalContainer.3" Cal.Single Straight 'standard trunk' full, 4'-5'sp | 29 | EACH | 1,000.00 | 29,000.00 | 492.00 | 14,268.00 | 485.00 | 14,065.00 | 467.00 | 13,543.00 | | 0017 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Quercus Virginiana 'SouthernLiveOak' 65Gal Container 3" Cal Single straight 'standard' trunk 4-5' min spread,14-16'MinHt | 12 | EACH | 1,330.00 | 15,960.00 | 492.00 | 5,904.00 | 485.00 | 5,820.00 | 467.00 | 5,604.00 | | 0018 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Taxodium Ascendens 'PondCypress' 65GalCon 3" Cal, Single Straight 'Standard' Trunk Full 4'-5'Min Spr, 14-16'MinHt | 9 | EACH | 1,450.00 | 13,050.00 | 492.00 | 4,428.00 | 485.00 | 4,365.00 | 467.00 | 4,203.00 | | 0019 | 723-01-00100 | Granular Material (Net Section) 12" Depth | 1,701 | CUYD | 49.00 | 83,349.00 | 38.00 | 64,638.00 | 53.00 | 90,153.00 | 68.00 | 115,668.00 | | 0020 | 726-01-00100 | Bedding Material | 432.4 | CUYD | 178.00 | 76,967.20 | 110.00 | 47,564.00 | 152.00 | 65,724.80 | 200.00 | 86,480.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 259,500.00 | 259,500.00 | 117,000.00 | 117,000.00 | 320,000.00 | 320,000.00 | | 0022 | 729-19-00100 | Dead End Road Installations (Type A) | 8 | EACH | 2,450.00 | 19,600.00 | 2,500.00 | 20,000.00 | 2,700.00 | 21,600.00 | 3,800.00 | 30,400.00 | | 0023 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.609 | MILE | 11,600.00 | 7,064.40 | 20,300.00 | 12,362.70 | 11,500.00 | 7,003.50 | 20,000.00 | 12,180.00 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 36,300.00 | 36,300.00 | 65,000.00 | 65,000.00 | 21,000.00 | 21,000.00 | | 0025 | 741-35-00100 | Adjust Valve or Meter Box | 2 | EACH | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 770.00 | 1,540.00 | 900.00 | 1,800.00 | | 0026 | 804-18-00100 | Vibration Monitoring | 10 | DAY | 500.00 | 5,000.00 | 810.00 | 8,100.00 | 1,140.00 | 11,400.00 | 900.00 | 9,000.00 | | 0027 | 822-01-00100 | Trenching and Backfilling | 5,513 | LNFT | 13.00 | 71,669.00 | 9.00 | 49,617.00 | 9.00 | 49,617.00 | 1.50 | 8,269.50 | | 0028 | 822-02-00400 | Conduit w Conductors (PVC/HDPE) (1-1/2") Electric | 5,471 | LNFT | 19.00 | 103,949.00 | 18.00 | 98,478.00 | 18.00 | 98,478.00 | 12.00 | 65,652.00 | | 0029 | 822-02-00600 | Conduit w Conductors (PVC/HDPE) (2-1/2") Electric | 42 | LNFT | 24.00 | 1,008.00 | 94.00 | 3,948.00 | 95.00 | 3,990.00 | 72.00 | 3,024.00 | | 0030 | 822-05-02100 | Light Pole 12ft Aluminum 5" Diameter Fluted Black Finish | 36 | EACH | 2,800.00 | 100,800.00 | 2,800.00 | 100,800.00 | 2,830.00 | 101,880.00 | 2,100.00 | 75,600.00 | | 0031 | 822-07-02800 | Luminaire (Acorn Fixture with LED Lamp) | 36 | EACH | 1,900.00 | 68,400.00 | 2,050.00 | 73,800.00 | 2,080.00 | 74,880.00 | 2,000.00 | 72,000.00 | | 0032 | 822-08-00300 | Electrical Service Point (As Shown on the One-Line) | 2 | EACH | 16,000.00 | 32,000.00 | 12,400.00 | 24,800.00 | 12,600.00 | 25,200.00 | 18,000.00 | 36,000.00 | | 0033 | 822-09-00100 | Electrical System (100A, Meter Pan, NEMA 3R Enclosure) | 1 | LUMP | 1,200.00 | 1,200.00 | 1,900.00 | 1,900.00 | 1,900.00 | 1,900.00 | 400.00 | 400.00 | | 0034 | 822-09-00100 | Electrical System (Ground Rod 3/4" x 10' Copper Clad Steel) | 1 | LUMP | 16,000.00 | 16,000.00 | 13,550.00 | 13,550.00 | 13,750.00 | 13,750.00 | 490.00 | 490.00 | | 0035 | 822-09-00100 | Electrical System (Lighting Control System, 120/240VAC, 30A, with
33 Photo Cell, NEMA 4X Enclosure) | 1 | LUMP | 18,500.00 | 18,500.00 | 27,300.00 | 27,300.00 | 27,685.00 | 27,685.00 | 4,800.00 | 4,800.00 | | 0036 | 822-16-00200 | Underground Junction Box (11" x 18") | 36 | EACH | 1,900.00 | 68,400.00 | 1,800.00 | 64,800.00 | 1,825.00 | 65,700.00 | 972.00 | 34,992.00 | | 0037 | 822-20-00300 | Disconnect (Other) (60A, 2 Pole, 240VAC Fused Disconnect, NEMA 3R
822-20-00300 Enclosure, with 30A Fuses) | 2 | EACH | 93.00 | 186.00 | 760.00 | 1,520.00 | 769.00 | 1,538.00 | 613.00 | 1,226.00 | | 0038 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 5,513 | LNFT | 0.70 | 3,859.10 | 0.70 | 3,859.10 | 0.75 | 4,134.75 | 0.25 | 1,378.25 | | 0039 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 7 | EACH | 1,900.00 | 13,300.00 | 1,158.00 | 8,106.00 | 1,140.00 | 7,980.00 | 1,100.00 | 7,700.00 | | 0040 | NS-201-00005 | Arborist Services | 1 | LUMP | 2,700.00 | 2,700.00 | 11,577.00 | 11,577.00 | 11,400.00 | 11,400.00 | 11,000.00 | 11,000.00 | | 0041 | NS-203-00006 | Exploratory Excavation | 36 | CUYD | 800.00 | 28,800.00 | 195.00 | 7,020.00 | 575.00 | 20,700.00 | 387.00 | 13,932.00 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 464 | INLF | 1.20 | 556.80 | 1.75 | 812.00 | 1.15 | 533.60 | 3.00 | 1,392.00 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 32 | INLF | 2.30 | 73.60 | 11.60 | 371.20 | 2.30 | 73.60 | 22.00 | 704.00 | | 0044 | NS-706-00460 | Shared-Use Path (Portland Cement Concrete) (8" Thick) | 4,379 | SQYD | 83.00 | 363,457.00 | 115.50 | 505,774.50 | 135.00 | 591,165.00 | 100.00 | 437,900.00 | | 0045 | NS-719-00002 | Tree Trimming | 1 | LUMP | 12,000.00 | 12,000.00 | 9,800.00 | 9,800.00 | 9,690.00 | 9,690.00 | 9,300.00 | 9,300.00 | | 0047 | TS-P26-70228 | Jefferson Parish Standard Catch Basin (CB-01) (Brick) | 27 | EACH | 3,550.00 | 95,850.00 | 5,888.00 | 158,976.00 | 7,282.00 | 196,614.00 | 5,500.00 | 148,500.00 | | 0048 | TS-822-02055 | Light Pole Foundation (5.5' Length) | 36 | EACH | 2,400.00 | 86,400.00 | 2,200.00 | 79,200.00 | 2,254.00 | 81,144.00 | 1,900.00 | 68,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,742,909.50 | | 2,178,094.85 | | 2,249,610.35 | | 2,281,461.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barber Bros. Contracting Co., L.L.C | - 6 - J. CALDARERA & COMPANY, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 45,000.00 | 45,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 34.8 | SQYD | 25.00 | 870.00 | 45.00 | 1,566.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 64 | LNFT | 25.00 | 1,600.00 | 25.00 | 1,600.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 222 | SQYD | 25.00 | 5,550.00 | 30.00 | 6,660.00 | | 0005 | 203-01-00100 | General Excavation | 2,233 | CUYD | 45.00 | 100,485.00 | 15.00 | 33,495.00 | | 0006 | 203-03-00100 | Embankment | 357 | CUYD | 30.00 | 10,710.00 | 40.00 | 14,280.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 6,554 | SQYD | 3.00 | 19,662.00 | 3.15 | 20,645.10 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,287 | LNFT | 3.25 | 10,682.75 | 2.75 | 9,039.25 | | 0009 | 701-07-00500 | Yard Drain Pipe (12") | 2,268 | LNFT | 135.00 | 306,180.00 | 95.00 | 215,460.00 | | 0010 | 706-01-00100 | Concrete Walk (4" Thick) | 354 | SQYD | 105.00 | 37,170.00 | 100.00 | 35,400.00 | | 0011 | 707-01-00100 | Concrete Curb | 74.5 | LNFT | 65.00 | 4,842.50 | 45.00 | 3,352.50 | | 0012 | 707-03-00100 | Combination Concrete Curb and Gutter | 58 | LNFT | 95.00 | 5,510.00 | 65.00 | 3,770.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 90,000.00 | 90,000.00 | | 0014 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 5,235 | SQYD | 12.00 | 62,820.00 | 9.25 | 48,423.75 | | 0015 | 719-01-02000 | Plants (Tree) (Container) (1 inch cal) MagnoliaVirginiana 'Sweet BayMagnolia'45 Gallon Container1" CaliperMultitrunk 3 Trunk Min, Full,4'-5'MinSprd 10-12'MinHt | 5 | EACH | 450.00 | 2,250.00 | 1,100.00 | 5,500.00 | | 0016 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Lagerstroeia Indica x Fauriei 'Natchez Crape Myrtle.45GalContainer.3" Cal.Single Straight 'standard trunk' full, 4'-5'sp | 29 | EACH | 450.00 | 13,050.00 | 1,000.00 | 29,000.00 | | 0017 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Quercus Virginiana 'SouthernLiveOak' 65Gal Container 3" Cal Single straight 'standard' trunk 4-5' min spread,14-16'MinHt | 12 | EACH | 450.00 | 5,400.00 | 1,300.00 | 15,600.00 | | 0018 | 719-01-02080 | Plants (Tree) (Container) (3 inch cal) Taxodium Ascendens 'PondCypress' 65GalCon 3" Cal, Single Straight 'Standard' Trunk Full 4'-5'Min Spr, 14-16'MinHt | 9 | EACH | 450.00 | 4,050.00 | 1,400.00 | 12,600.00 | | 0019 | 723-01-00100 | Granular Material (Net Section) 12" Depth | 1,701 | CUYD | 75.00 | 127,575.00 | 100.00 | 170,100.00 | | 0020 | 726-01-00100 | Bedding Material | 432.4 | CUYD | 125.00 | 54,050.00 | 132.00 | 57,076.80 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 215,000.00 | 215,000.00 | 250,000.00 | 250,000.00 | | 0022 | 729-19-00100 | Dead End Road Installations (Type A) | 8 | EACH | 2,300.00 | 18,400.00 | 3,000.00 | 24,000.00 | | 0023 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.609 | MILE | 11,000.00 | 6,699.00 | 21,500.00 | 13,093.50 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0025 | 741-35-00100 | Adjust Valve or Meter Box | 2 | EACH | 350.00 | 700.00 | 1,900.00 | 3,800.00 | | 0026 | 804-18-00100 | Vibration Monitoring | 10 | DAY | 800.00 | 8,000.00 | 1,000.00 | 10,000.00 | | 0027 | 822-01-00100 | Trenching and Backfilling | 5,513 | LNFT | 1.30 | 7,166.90 | 7.00 | 38,591.00 | | 0028 | 822-02-00400 | Conduit w Conductors (PVC/HDPE) (1-1/2") Electric | 5,471 | LNFT | 11.00 | 60,181.00 | 13.80 | 75,499.80 | | 0029 | 822-02-00600 | Conduit w Conductors (PVC/HDPE) (2-1/2") Electric | 42 | LNFT | 72.00 | 3,024.00 | 75.00 | 3,150.00 | | 0030 | 822-05-02100 | Light Pole 12ft Aluminum 5" Diameter Fluted Black Finish | 36 | EACH | 2,180.00 | 78,480.00 | 2,420.00 | 87,120.00 | | 0031 | 822-07-02800 | Luminaire (Acorn Fixture with LED Lamp) | 36 | EACH | 1,800.00 | 64,800.00 | 1,900.00 | 68,400.00 | | 0032 | 822-08-00300 | Electrical Service Point (As Shown on the One-Line) | 2 | EACH | 7,900.00 | 15,800.00 | 13,000.00 | 26,000.00 | | 0033 | 822-09-00100 | Electrical System (100A, Meter Pan, NEMA 3R Enclosure) | 1 | LUMP | 400.00 | 400.00 | 1,500.00 | 1,500.00 | | 0034 | 822-09-00100 | Electrical System (Ground Rod 3/4" x 10' Copper Clad Steel) | 1 | LUMP | 500.00 | 500.00 | 4,500.00 | 4,500.00 | | 0035 | 822-09-00100 | Electrical System (Lighting Control System, 120/240VAC, 30A, with
33 Photo Cell, NEMA 4X Enclosure) | 1 | LUMP | 4,900.00 | 4,900.00 | 16,000.00 | 16,000.00 | | 0036 | 822-16-00200 | Underground Junction Box (11" x 18") | 36 | EACH | 950.00 | 34,200.00 | 2,300.00 | 82,800.00 | | 0037 | 822-20-00300 | Disconnect (Other) (60A, 2 Pole, 240VAC Fused Disconnect, NEMA 3R
822-20-00300 Enclosure, with 30A Fuses) | 2 | EACH | 620.00 | 1,240.00 | 1,000.00 | 2,000.00 | | 0038 | 822-22-00100 | Underground Marker Tape (3")(Detectable) | 5,513 | LNFT | 0.25 | 1,378.25 | 0.90 | 4,961.70 | | 0039 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 7 | EACH | 1,100.00 | 7,700.00 | 1,755.00 | 12,285.00 | | 0040 | NS-201-00005 | Arborist Services | 1 | LUMP | 11,000.00 | 11,000.00 | 2,700.00 | 2,700.00 | | 0041 | NS-203-00006 | Exploratory Excavation | 36 | CUYD | 65.00 | 2,340.00 | 200.00 | 7,200.00 | | 0042 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 464 | INLF | 2.00 | 928.00 | 2.00 | 928.00 | | 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 32 | INLF | 2.00 | 64.00 | 4.00 | 128.00 | | 0044 | NS-706-00460 | Shared-Use Path (Portland Cement Concrete) (8" Thick) | 4,379 | SQYD | 145.00 | 634,955.00 | 155.00 | 678,745.00 | | 0045 | NS-719-00002 | Tree Trimming | 1 | LUMP | 9,000.00 | 9,000.00 | 11,750.00 | 11,750.00 | | 0047 | TS-P26-70228 | Jefferson Parish Standard Catch Basin (CB-01) (Brick) | 27 | EACH | 6,000.00 | 162,000.00 | 7,200.00 | 194,400.00 | | 0048 | TS-822-02055 | Light Pole Foundation (5.5' Length) | 36 | EACH | 1,500.00 | 54,000.00 | 1,650.00 | 59,400.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,315,313.40 | | 2,547,520.40 |
|