Proposal:H.012232.6
Parish:East Baton Rouge
Routes:I-10
Description:LA 3064 TO BLUEBONNET BLVD. PHASE II
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, INTELLEGENT TRANSPORTATION SYSTEMS, AND
RELATED WORK.
Estimated Construction Cost:$15,621,672.70
| Rank | License | Bidder | Construction Bid |
| 1 | 29595 | Boone Services LLC | $17,048,770.59 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $20,099,073.62 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boone Services LLC | - 2 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 11 | LUMP | 412,000.00 | 412,000.00 | 245,000.00 | 245,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 36,000.00 | 36,000.00 | 115,000.00 | 115,000.00 | | 0003 | 202-02-00010 | Removal of Dead End Road Installation | 1 | EACH | 1,051.00 | 1,051.00 | 750.00 | 750.00 | | 0004 | 202-02-02020 | Removal of Asphalt Pavement | 142.8 | SQYD | 18.35 | 2,620.38 | 56.00 | 7,996.80 | | 0005 | 202-02-05000 | Removal of Building (26,500 SQFT Structure Near Sta. 161+50, Rt.) | 1 | EACH | 188,500.00 | 188,500.00 | 325,000.00 | 325,000.00 | | 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 6 | EACH | 990.00 | 5,940.00 | 1,200.00 | 7,200.00 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 6,418 | SQYD | 14.37 | 92,226.66 | 11.50 | 73,807.00 | | 0008 | 202-02-06140 | Removal of Curbs (Concrete) | 1,690 | LNFT | 14.86 | 25,113.40 | 20.00 | 33,800.00 | | 0009 | 202-02-12000 | Removal of Fence | 811 | LNFT | 8.53 | 6,917.83 | 7.00 | 5,677.00 | | 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (See EXISTING PIPE REMOVAL Table) | 980 | LNFT | 24.82 | 24,323.60 | 75.00 | 73,500.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 371 | SQYD | 22.06 | 8,184.26 | 17.50 | 6,492.50 | | 0012 | 202-02-38200 | Removal of Signs | 13 | EACH | 563.00 | 7,319.00 | 552.00 | 7,176.00 | | 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 8,320.00 | 8,320.00 | 8,200.00 | 8,200.00 | | 0014 | 203-01-00100 | General Excavation | 27,987 | CUYD | 22.43 | 627,748.41 | 26.00 | 727,662.00 | | 0015 | 203-03-00100 | Embankment | 131,159 | CUYD | 20.90 | 2,741,223.10 | 36.50 | 4,787,303.50 | | 0016 | 203-04-00300 | Nonplastic Embankment (Stone) | 7 | CUYD | 180.00 | 1,260.00 | 795.00 | 5,565.00 | | 0017 | 203-08-00100 | Geotextile Fabric | 59 | SQYD | 6.31 | 372.29 | 4.78 | 282.02 | | 0018 | 203-11-00100 | Settlement Plate Installation and Monitoring | 10 | EACH | 5,020.00 | 50,200.00 | 4,000.00 | 40,000.00 | | 0019 | 204-02-00100 | Temporary Hay Bales | 630 | EACH | 21.01 | 13,236.30 | 41.00 | 25,830.00 | | 0020 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 211.00 | 422.00 | 200.00 | 400.00 | | 0021 | 204-06-00100 | Temporary Silt Fencing | 7,885 | LNFT | 5.30 | 41,790.50 | 3.00 | 23,655.00 | | 0022 | 302-02-06070 | Class II Base Course (6" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,741.2 | SQYD | 28.19 | 49,084.43 | 40.00 | 69,648.00 | | 0023 | 302-02-08020 | Class II Base Course (8" Thick) (Crushed Stone) | 21,876.3 | SQYD | 32.73 | 716,011.30 | 44.50 | 973,495.35 | | 0024 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,227.6 | SQYD | 38.51 | 47,274.88 | 47.50 | 58,311.00 | | 0025 | 304-01-00100 | Lime | 57.19 | TON | 298.00 | 17,042.62 | 325.00 | 18,586.75 | | 0026 | 304-05-00100 | Lime Treatment (Type E) | 4,034 | SQYD | 5.55 | 22,388.70 | 5.25 | 21,178.50 | | 0027 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 157.64 | 15,764.00 | 130.00 | 13,000.00 | | 0028 | 502-01-00100 | Asphalt Concrete | 5,929.5 | TON | 154.58 | 916,582.11 | 138.00 | 818,271.00 | | 0029 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 698.9 | SQYD | 132.33 | 92,485.44 | 120.00 | 83,868.00 | | 0030 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 540.6 | SQYD | 138.59 | 74,921.75 | 139.00 | 75,143.40 | | 0031 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 944.1 | SQYD | 146.76 | 138,556.12 | 151.00 | 142,559.10 | | 0032 | 601-03-00700 | Portland Cement Concrete Shoulder (8" Thick) | 383.8 | SQYD | 129.26 | 49,609.99 | 163.00 | 62,559.40 | | 0033 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 242.8 | SQYD | 214.49 | 52,078.17 | 271.00 | 65,798.80 | | 0034 | 701-01-01143 | Cross Drain Pipe (72" RCP/RPVCP) | 522 | LNFT | 929.48 | 485,188.56 | 1,000.00 | 522,000.00 | | 0035 | 701-01-02220 | Cross Drain Pipe (60" RCP or 72" CMP) | 120 | LNFT | 813.79 | 97,654.80 | 910.00 | 109,200.00 | | 0036 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 1,324 | LNFT | 75.66 | 100,173.84 | 160.00 | 211,840.00 | | 0037 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 2,696 | LNFT | 97.45 | 262,725.20 | 175.00 | 471,800.00 | | 0038 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 427 | LNFT | 122.65 | 52,371.55 | 244.00 | 104,188.00 | | 0039 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 145 | LNFT | 209.59 | 30,390.55 | 264.00 | 38,280.00 | | 0040 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 308 | LNFT | 167.64 | 51,633.12 | 335.00 | 103,180.00 | | 0041 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 511 | LNFT | 376.39 | 192,335.29 | 394.00 | 201,334.00 | | 0042 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 218 | LNFT | 578.34 | 126,078.12 | 560.00 | 122,080.00 | | 0043 | 701-03-01160 | Storm Drain Pipe (72" RCP) | 323 | LNFT | 852.70 | 275,422.10 | 955.00 | 308,465.00 | | 0044 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 28 | LNFT | 392.06 | 10,977.68 | 1,028.00 | 28,784.00 | | 0045 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 107 | LNFT | 413.55 | 44,249.85 | 549.00 | 58,743.00 | | 0046 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 46 | LNFT | 228.60 | 10,515.60 | 367.00 | 16,882.00 | | 0047 | 701-07-00100 | Yard Drain Pipe (4") | 518 | LNFT | 33.98 | 17,601.64 | 35.00 | 18,130.00 | | 0048 | 701-14-00100 | Cleaning Existing Pipes | 570 | LNFT | 19.14 | 10,909.80 | 15.00 | 8,550.00 | | 0049 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,036 | LNFT | 6.27 | 56,655.72 | 25.00 | 225,900.00 | | 0050 | 702-02-00100 | Manholes (MH-06) | 15 | EACH | 14,885.00 | 223,275.00 | 27,000.00 | 405,000.00 | | 0051 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 5,115.00 | 56,265.00 | 8,600.00 | 94,600.00 | | 0052 | 702-03-00500 | Catch Basins (CB-06) | 36 | EACH | 8,865.00 | 319,140.00 | 5,500.00 | 198,000.00 | | 0053 | 702-03-00600 | Catch Basins (CB-07) | 2 | EACH | 8,520.00 | 17,040.00 | 11,000.00 | 22,000.00 | | 0054 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 15,115.00 | 196,495.00 | 14,000.00 | 182,000.00 | | 0055 | 702-03-01000 | Catch Basins (CB-2TOP02) | 1 | EACH | 7,600.00 | 7,600.00 | 21,000.00 | 21,000.00 | | 0056 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,835.00 | 2,835.00 | 5,300.00 | 5,300.00 | | 0057 | 702-04-01000 | Capping Existing Catch Basin or Manhole | 1 | EACH | 1,645.00 | 1,645.00 | 4,600.00 | 4,600.00 | | 0058 | 703-01-00100 | Shoulder Underdrain Systems | 5,914 | LNFT | 15.50 | 91,667.00 | 20.00 | 118,280.00 | | 0059 | 706-01-00100 | Concrete Walk (4" Thick) | 3,158.5 | SQYD | 58.56 | 184,961.76 | 45.00 | 142,132.50 | | 0060 | 706-01-00300 | Concrete Walk (6" Thick) | 440.8 | SQYD | 69.93 | 30,825.14 | 101.00 | 44,520.80 | | 0061 | 706-02-00200 | Concrete Drive (6" Thick) | 542.7 | SQYD | 91.92 | 49,884.98 | 120.00 | 65,124.00 | | 0062 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 61.1 | SQYD | 138.48 | 8,461.13 | 120.00 | 7,332.00 | | 0063 | 706-03-00700 | Incidental Concrete Paving (10" Thick) | 71.1 | SQYD | 166.50 | 11,838.15 | 150.00 | 10,665.00 | | 0064 | 706-04-00110 | Curb Ramps (Type 6) | 34.7 | SQYD | 156.25 | 5,421.88 | 550.00 | 19,085.00 | | 0065 | 707-01-00100 | Concrete Curb | 992.9 | LNFT | 15.93 | 15,816.90 | 21.50 | 21,347.35 | | 0066 | 707-03-00100 | Combination Concrete Curb and Gutter | 11,415.4 | LNFT | 37.67 | 430,018.12 | 35.00 | 399,539.00 | | 0067 | 708-01-00100 | Right-of-Way Monument | 32 | EACH | 871.35 | 27,883.20 | 900.00 | 28,800.00 | | 0068 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 352 | SQYD | 151.01 | 53,155.52 | 180.00 | 63,360.00 | | 0069 | 711-04-00100 | Geotextile Fabric | 352 | SQYD | 5.92 | 2,083.84 | 2.75 | 968.00 | | 0070 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 47,040.00 | 47,040.00 | 300,000.00 | 300,000.00 | | 0071 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 158 | LNFT | 0.56 | 88.48 | 1.20 | 189.60 | | 0072 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.84 | 20.16 | 12.00 | 288.00 | | 0073 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,281 | SQYD | 22.50 | 73,822.50 | 12.00 | 39,372.00 | | 0074 | 717-01-00100 | Seeding | 206 | LB | 22.50 | 4,635.00 | 27.00 | 5,562.00 | | 0075 | 718-01-00100 | Fertilizer | 6,885 | LB | 0.75 | 5,163.75 | 2.50 | 17,212.50 | | 0076 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) (Live Oak) | 30 | EACH | 2,250.00 | 67,500.00 | 2,374.00 | 71,220.00 | | 0077 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) (Nutall Oak) | 22 | EACH | 2,250.00 | 49,500.00 | 2,374.00 | 52,228.00 | | 0078 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) (Sweetbay Magnolia) | 18 | EACH | 2,250.00 | 40,500.00 | 2,374.00 | 42,732.00 | | 0079 | 719-01-01080 | Plants (Tree) (Balled and Burlapped) (3 inch cal) (Wilow Oak) | 27 | EACH | 2,250.00 | 60,750.00 | 2,374.00 | 64,098.00 | | 0080 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,140.00 | 20,140.00 | 33,000.00 | 33,000.00 | | 0081 | 726-01-00100 | Bedding Material | 1,324.9 | CUYD | 73.12 | 96,876.69 | 104.00 | 137,789.60 | | 0082 | 727-01-00100 | Mobilization | 1 | LUMP | 2,587,000.00 | 2,587,000.00 | 1,600,000.00 | 1,600,000.00 | | 0083 | 729-01-00100 | Sign (Type A) | 464.5 | SQFT | 57.59 | 26,750.56 | 56.52 | 26,253.54 | | 0084 | 729-01-00101 | Sign (Type A)(Install) | 130 | SQFT | 39.38 | 5,119.40 | 38.64 | 5,023.20 | | 0085 | 729-04-00100 | Sign (Type D) | 140.2 | SQFT | 53.44 | 7,492.29 | 52.44 | 7,352.09 | | 0086 | 729-06-00100 | Sign (Overhead Mounted) | 70 | SQFT | 53.44 | 3,740.80 | 52.99 | 3,709.30 | | 0087 | 729-08-00100 | Mounting (2 1/2" Size Post) | 11 | EACH | 1,918.13 | 21,099.43 | 1,882.42 | 20,706.62 | | 0088 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 2,244.38 | 8,977.52 | 2,202.59 | 8,810.36 | | 0089 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 8 | EACH | 2,756.00 | 22,048.00 | 2,704.94 | 21,639.52 | | 0090 | 729-08-00700 | Mounting (W8 x 18 Size Post) | 2 | EACH | 4,332.00 | 8,664.00 | 4,250.62 | 8,501.24 | | 0091 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 1 | EACH | 21,207.00 | 21,207.00 | 20,811.46 | 20,811.46 | | 0092 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 7 | EACH | 349.00 | 2,443.00 | 342.26 | 2,395.82 | | 0093 | 731-02-00100 | Reflectorized Raised Pavement Markers | 918 | EACH | 11.25 | 10,327.50 | 15.00 | 13,770.00 | | 0094 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,478 | LNFT | 28.13 | 41,576.14 | 30.00 | 44,340.00 | | 0095 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.174 | MILE | 7,650.00 | 24,281.10 | 11,700.00 | 37,135.80 | | 0096 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.695 | MILE | 39,375.00 | 27,365.63 | 35,000.00 | 24,325.00 | | 0097 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.716 | MILE | 3,938.00 | 6,757.61 | 2,900.00 | 4,976.40 | | 0098 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.084 | MILE | 11,250.00 | 945.00 | 5,600.00 | 470.40 | | 0099 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.35 | MILE | 13,500.00 | 4,725.00 | 11,700.00 | 4,095.00 | | 0100 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 675.00 | 2,025.00 | 646.00 | 1,938.00 | | 0101 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 5 | EACH | 675.00 | 3,375.00 | 880.00 | 4,400.00 | | 0102 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 675.00 | 12,825.00 | 580.00 | 11,020.00 | | 0103 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 675.00 | 5,400.00 | 580.00 | 4,640.00 | | 0104 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 845.00 | 1,690.00 | 580.00 | 1,160.00 | | 0105 | 732-05-00100 | Removal of Existing Markings | 0.087 | MILE | 39,375.00 | 3,425.63 | 28,000.00 | 2,436.00 | | 0106 | 736-01-00100 | Trenching and Backfilling | 2,765 | LNFT | 7.99 | 22,092.35 | 7.90 | 21,843.50 | | 0107 | 736-03-00100 | Jacking or Boring for Conduit | 3,245 | LNFT | 39.89 | 129,443.05 | 20.00 | 64,900.00 | | 0108 | 736-04-00001 | Signal Pole (Pedestal Pole) | 1 | EACH | 969.00 | 969.00 | 950.00 | 950.00 | | 0109 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 20 | EACH | 1,285.00 | 25,700.00 | 1,258.00 | 25,160.00 | | 0110 | 736-05-30004 | Signal Heads (3 Section, 12 inch Led Lens, R, R, Y) | 5 | EACH | 1,285.00 | 6,425.00 | 1,258.00 | 6,290.00 | | 0111 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 10 | EACH | 1,285.00 | 12,850.00 | 1,258.00 | 12,580.00 | | 0112 | 736-05-35001 | Signal Heads (3 Sec, 12 inch Led Lens, RT. R, RT. Y, RT. G) | 3 | EACH | 1,285.00 | 3,855.00 | 1,258.00 | 3,774.00 | | 0113 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 3 | EACH | 1,690.00 | 5,070.00 | 1,655.00 | 4,965.00 | | 0114 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 2,130.00 | 6,390.00 | 2,100.00 | 6,300.00 | | 0115 | 736-06-00100 | Signal Service | 1 | EACH | 1,940.00 | 1,940.00 | 1,900.00 | 1,900.00 | | 0116 | 736-06-00300 | Signal Service with Separate Disconnect for Street Lights | 1 | EACH | 2,255.00 | 2,255.00 | 2,210.00 | 2,210.00 | | 0117 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 3,260.00 | 6,520.00 | 3,200.00 | 6,400.00 | | 0118 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 3 | EACH | 7,635.00 | 22,905.00 | 7,500.00 | 22,500.00 | | 0119 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 975.00 | 975.00 | 955.00 | 955.00 | | 0120 | 736-10-00300 | Underground Junction Box (Type F) | 22 | EACH | 1,235.00 | 27,170.00 | 1,208.00 | 26,576.00 | | 0121 | 736-10-00400 | Underground Junction Box (Type G) | 3 | EACH | 2,350.00 | 7,050.00 | 2,300.00 | 6,900.00 | | 0122 | 736-10-00600 | Underground Junction Box (Type I) | 8 | EACH | 3,340.00 | 26,720.00 | 3,277.00 | 26,216.00 | | 0123 | 736-10-00700 | Underground Junction Box (Type J) | 3 | EACH | 3,975.00 | 11,925.00 | 3,900.00 | 11,700.00 | | 0124 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 3,360 | LNFT | 7.35 | 24,696.00 | 7.22 | 24,259.20 | | 0125 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 4,200 | LNFT | 12.48 | 52,416.00 | 12.25 | 51,450.00 | | 0126 | 736-12-02006 | Conductor (2c, #6 awg) | 250 | LNFT | 7.58 | 1,895.00 | 7.44 | 1,860.00 | | 0127 | 736-12-02014 | Conductor (2c, #14 awg) | 170 | LNFT | 2.24 | 380.80 | 2.20 | 374.00 | | 0128 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 765 | LNFT | 8.56 | 6,548.40 | 8.40 | 6,426.00 | | 0129 | 736-12-06014 | Conductor (6c, #14 awg) | 2,940 | LNFT | 3.30 | 9,702.00 | 3.23 | 9,496.20 | | 0130 | 736-12-10014 | Conductor (10c, #14 awg) | 9,225 | LNFT | 4.25 | 39,206.25 | 4.20 | 38,745.00 | | 0131 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 1,350.00 | 1,350.00 | 1,325.00 | 1,325.00 | | 0132 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 980.00 | 1,960.00 | 960.00 | 1,920.00 | | 0133 | 737-05-00002 | Painted Curbs | 179 | LNFT | 13.50 | 2,416.50 | 11.00 | 1,969.00 | | 0134 | 740-01-00100 | Construction Layout | 1 | LUMP | 225,000.00 | 225,000.00 | 250,000.00 | 250,000.00 | | 0135 | 822-01-00100 | Trenching and Backfilling | 6,676 | LNFT | 6.23 | 41,591.48 | 6.12 | 40,857.12 | | 0136 | 822-02-00300 | Conduit w Conductors (PVC/HDPE) (1-1/4") (3#8 AWG XHHW-2 Conductors, 1#8 Bare Stranded Ground) (Underground) | 3,403 | LNFT | 7.80 | 26,543.40 | 7.65 | 26,032.95 | | 0137 | 822-02-00400 | Conduit w Conductors (PVC/HDPE) (1-1/2") (3#4 AWG XHHW-2 Conductors, 1#4 Bare Stranded Ground) (Underground) | 1,812 | LNFT | 12.65 | 22,921.80 | 12.50 | 22,650.00 | | 0138 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") 3#2 AWG XHHW-2 Conductors, 1#2 Bare Stranded Ground) (Underground) | 5,832 | LNFT | 18.78 | 109,524.96 | 18.40 | 107,308.80 | | 0139 | 822-02-00600 | Conduit w Conductors (PVC/HDPE) (2-1/2") (3#1/0 AWG XHHW-2 Conductors) (Underground) | 150 | LNFT | 22.98 | 3,447.00 | 22.50 | 3,375.00 | | 0140 | 822-02-02300 | Conduit w Conductors (Rigid Galv Steel) (1-1/4") (3#8 AWG XHHW-2 Conductors, 1#8 Bare Stranded Ground) (On Structure) | 20 | LNFT | 30.75 | 615.00 | 30.00 | 600.00 | | 0141 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") (3#1/0 AWG XHHW-2 Conductors, 1#2 Green Ground) (On Structure) | 30 | LNFT | 40.23 | 1,206.90 | 39.50 | 1,185.00 | | 0142 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") (3#2 AWG XHHW-2 Conductors, 1#2 Bare Stranded Ground) (On Structure) | 80 | LNFT | 44.81 | 3,584.80 | 44.00 | 3,520.00 | | 0143 | 822-02-02600 | Conduit w Conductors (Rigid Galv Steel) (2-1/2") (3#1/0 AWG XHHW-2 Conductors) (On Structure) | 20 | LNFT | 63.09 | 1,261.80 | 62.00 | 1,240.00 | | 0144 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 628 | LNFT | 63.80 | 40,066.40 | 53.00 | 33,284.00 | | 0145 | 822-05-02100 | Light Pole (Aluminum, 35 Foot Mnt. Ht., 8' Single Truss Arm, Aluminum Break. Trans. Base, Conc. Drill Shaft, Conc. Mowing Apron) | 36 | EACH | 7,197.00 | 259,092.00 | 7,100.00 | 255,600.00 | | 0146 | 822-07-02800 | Luminaire (Lowmast, 180 Watt LED, 120 Volt, IES Medium, Cutoff, Type II Roadway Distribution, Single Fusing, UL Listed Grey) | 36 | EACH | 706.00 | 25,416.00 | 693.00 | 24,948.00 | | 0147 | 822-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 31,030.00 | 31,030.00 | 30,500.00 | 30,500.00 | | 0148 | 822-15-02100 | Relocate Light Poles | 1 | EACH | 6,315.00 | 6,315.00 | 6,200.00 | 6,200.00 | | 0149 | 822-16-00100 | Underground Junction Box (12" x 12") | 36 | EACH | 621.00 | 22,356.00 | 609.00 | 21,924.00 | | 0150 | 822-16-00300 | Underground Junction Box (13" x 24") | 8 | EACH | 945.00 | 7,560.00 | 927.00 | 7,416.00 | | 0151 | 822-16-00400 | Underground Junction Box (17" x 30") | 2 | EACH | 1,455.00 | 2,910.00 | 1,450.00 | 2,900.00 | | 0152 | 822-16-00400 | Underground Junction Box (30" x 30") | 1 | EACH | 3,686.00 | 3,686.00 | 3,617.00 | 3,617.00 | | 0153 | 822-19-00100 | Modular Breakaway Cable System | 36 | EACH | 2,355.00 | 84,780.00 | 2,310.00 | 83,160.00 | | 0154 | 822-20-00100 | Disconnect (Service) (Fused) | 1 | EACH | 7,450.00 | 7,450.00 | 7,311.00 | 7,311.00 | | 0155 | 822-21-00100 | Duct Marker (Concrete) | 10 | EACH | 320.00 | 3,200.00 | 313.55 | 3,135.50 | | 0156 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 6,676 | LNFT | 0.54 | 3,605.04 | 0.53 | 3,538.28 | | 0157 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 21,755 | INLF | 1.69 | 36,765.95 | 1.50 | 32,632.50 | | 0158 | NS-736-00001 | GPS | 3 | EACH | 520.00 | 1,560.00 | 510.00 | 1,530.00 | | 0159 | NS-736-00003 | Managed Ethernet Switch | 3 | EACH | 5,025.00 | 15,075.00 | 5,000.00 | 15,000.00 | | 0160 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 3 | EACH | 26,270.00 | 78,810.00 | 25,800.00 | 77,400.00 | | 0161 | NS-736-00133 | Battery Back-up System for Traffic Signals | 3 | EACH | 11,170.00 | 33,510.00 | 11,000.00 | 33,000.00 | | 0162 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 2 | EACH | 1,200.00 | 2,400.00 | 1,170.00 | 2,340.00 | | 0163 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,440.00 | 5,440.00 | 5,340.00 | 5,340.00 | | 0164 | NS-DEV-73280 | MMA Pavement Marking (Green Bike Lanes/Bike Boxes) | 24 | SQYD | 450.00 | 10,800.00 | 277.00 | 6,648.00 | | 0165 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 1 | EACH | 17,280.00 | 17,280.00 | 17,000.00 | 17,000.00 | | 0166 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 3,440 | LNFT | 3.50 | 12,040.00 | 3.43 | 11,799.20 | | 0167 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 4 | EACH | 180.00 | 720.00 | 175.00 | 700.00 | | 0168 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 68 | EACH | 32.21 | 2,190.28 | 31.50 | 2,142.00 | | 0169 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 48 | EACH | 26.21 | 1,258.08 | 25.60 | 1,228.80 | | 0170 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 1,120 | LNFT | 2.94 | 3,292.80 | 2.88 | 3,225.60 | | 0171 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 6 | EACH | 59.57 | 357.42 | 59.00 | 354.00 | | 0172 | NS-ITS-04360 | Fiber Optic Connection Splice Tray, Furnish & Install | 7 | EACH | 122.06 | 854.42 | 120.00 | 840.00 | | 0173 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 4 | EACH | 1,110.00 | 4,440.00 | 1,100.00 | 4,400.00 | | 0174 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 2 | EACH | 1,405.00 | 2,810.00 | 1,400.00 | 2,800.00 | | 0175 | NS-ITS-12000 | Communications System Integration | 1 | LUMP | 2,775.00 | 2,775.00 | 2,720.00 | 2,720.00 | | 0176 | NS-ITS-13200 | As-Builts | 1 | LUMP | 5,560.00 | 5,560.00 | 5,482.00 | 5,482.00 | | 0177 | TS-203-00006 | Exploratory Excavation for Traffic Signal Foundation | 9 | EACH | 2,425.00 | 21,825.00 | 2,400.00 | 21,600.00 | | 0178 | TS-702-00126 | 48" Sanitary Sewer Manhole | 15 | EACH | 14,108.00 | 211,620.00 | 22,100.00 | 331,500.00 | | 0179 | TS-736-10300 | Signal Support (Mast Arm Standard w/ 30 ft arm) | 2 | EACH | 27,935.00 | 55,870.00 | 27,415.00 | 54,830.00 | | 0180 | TS-736-10450 | Signal Support (Mast Arm Standard w/ 45 ft arm) | 1 | EACH | 36,780.00 | 36,780.00 | 36,100.00 | 36,100.00 | | 0181 | TS-736-10500 | Signal Support (Mast Arm Standard w/ 50 ft arm) | 1 | EACH | 49,720.00 | 49,720.00 | 48,800.00 | 48,800.00 | | 0182 | TS-736-10550 | Signal Support (Mast Arm Standard w/ 55 ft arm) | 4 | EACH | 39,800.00 | 159,200.00 | 39,100.00 | 156,400.00 | | 0183 | TS-736-10600 | Signal Support (Mast Arm Standard w/ 60 ft arm) | 2 | EACH | 50,235.00 | 100,470.00 | 49,300.00 | 98,600.00 | | 0184 | TS-736-10700 | Signal Support (Mast Arm Standard w/ 70 ft arm) | 1 | EACH | 56,980.00 | 56,980.00 | 56,000.00 | 56,000.00 | | 0185 | TS-736-11250 | Additional Mast Arm (25 ft. arm) | 1 | EACH | 6,600.00 | 6,600.00 | 6,500.00 | 6,500.00 | | 0186 | TS-736-11350 | Additional Mast Arm (35 ft. arm) | 1 | EACH | 7,740.00 | 7,740.00 | 7,800.00 | 7,800.00 | | 0187 | TS-736-11450 | Additional Mast Arm (45 ft. arm) | 1 | EACH | 19,750.00 | 19,750.00 | 19,400.00 | 19,400.00 | | 0188 | TS-736-12008 | Luminaire Arm w/LED Luminaire (8 ft. arm) | 2 | EACH | 2,340.00 | 4,680.00 | 2,300.00 | 4,600.00 | | 0189 | TS-736-15002 | GPS Based Traffic Signal Preemption System (With Existing Fiber Communication) | 2 | EACH | 8,395.00 | 16,790.00 | 8,240.00 | 16,480.00 | | 0190 | TS-736-36200 | Video Detection System (6 Camera System) | 1 | EACH | 83,790.00 | 83,790.00 | 82,300.00 | 82,300.00 | | 0191 | TS-736-36200 | Video Detection System (7 Camera System) | 1 | EACH | 93,130.00 | 93,130.00 | 91,400.00 | 91,400.00 | | 0192 | TS-742-60010 | Fittings | 1,123 | LB | 28.45 | 31,949.35 | 33.25 | 37,339.75 | | 0193 | TS-742-60011 | Air Release/Vacuum Valve (2") | 3 | EACH | 17,000.00 | 51,000.00 | 17,102.00 | 51,306.00 | | 0194 | TS-742-60012 | Unrestrained Joint Sewer Force Main (16") | 2,487 | LNFT | 150.17 | 373,472.79 | 182.00 | 452,634.00 | | 0195 | TS-742-60013 | Restrained Joint Sewer Force Main (16") | 211 | LNFT | 223.28 | 47,112.08 | 248.00 | 52,328.00 | | 0196 | TS-742-60014 | 24" Jacked and Bored Casing Pipe Including Carrier Pipe | 65 | LNFT | 1,950.00 | 126,750.00 | 1,800.00 | 117,000.00 | | 0197 | TS-742-60024 | Force Main Tie-in (16") | 1 | EACH | 7,212.00 | 7,212.00 | 18,700.00 | 18,700.00 | | 0198 | TS-742-61006 | Sanitary Sewer Pipe (12") (PVC) | 2,196 | LNFT | 195.52 | 429,361.92 | 340.00 | 746,640.00 | | 0199 | TS-742-80109 | Sand-Aggregate for Secondary Backfill | 610 | CUYD | 85.21 | 51,978.10 | 106.00 | 64,660.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,048,770.59 | | 20,099,073.62 |
|