Proposal:H.013494.6
Parish:St. Charles
Routes:LA 52
Description:LA 52 (PH 1): BLUEBERRY HILL-ANGUS DR.
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$7,995,051.64
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $10,954,325.39 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $11,249,519.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-02-00020 | Removal of Concrete Drives | 1,671.4 | SQYD | 25.00 | 41,785.00 | 20.00 | 33,428.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 536.8 | SQYD | 32.00 | 17,177.60 | 20.00 | 10,736.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 34 | EACH | 800.00 | 27,200.00 | 750.00 | 25,500.00 | | 0005 | 202-02-12000 | Removal of Fence | 628 | LNFT | 11.00 | 6,908.00 | 5.00 | 3,140.00 | | 0006 | 202-02-26000 | Removal of Manholes Sewer manhole removal | 14 | EACH | 1,200.00 | 16,800.00 | 750.00 | 10,500.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12 Inch | 25 | LNFT | 25.00 | 625.00 | 10.00 | 250.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 15 Inch | 15 | LNFT | 42.00 | 630.00 | 10.00 | 150.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 18 Inch | 962 | LNFT | 26.00 | 25,012.00 | 10.00 | 9,620.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) 24 Inch | 172 | LNFT | 27.00 | 4,644.00 | 10.00 | 1,720.00 | | 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 18 Inch | 715 | LNFT | 27.00 | 19,305.00 | 10.00 | 7,150.00 | | 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 24 Inch | 1,900 | LNFT | 26.00 | 49,400.00 | 10.00 | 19,000.00 | | 0013 | 202-02-32180 | Removal of Pipe Headwalls | 12 | EACH | 1,400.00 | 16,800.00 | 750.00 | 9,000.00 | | 0014 | 203-01-00100 | General Excavation | 1,569 | CUYD | 41.00 | 64,329.00 | 40.00 | 62,760.00 | | 0015 | 203-03-00100 | Embankment | 1,966 | CUYD | 84.00 | 165,144.00 | 45.00 | 88,470.00 | | 0016 | 204-02-00100 | Temporary Hay Bales | 546 | EACH | 42.00 | 22,932.00 | 30.00 | 16,380.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 7,200 | LNFT | 4.00 | 28,800.00 | 3.00 | 21,600.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 1,509 | TON | 205.00 | 309,345.00 | 245.00 | 369,705.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 269.8 | TON | 346.00 | 93,350.80 | 400.00 | 107,920.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 14,597 | SQYD | 7.00 | 102,179.00 | 8.00 | 116,776.00 | | 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 773 | SQYD | 200.00 | 154,600.00 | 190.00 | 146,870.00 | | 0023 | 510-02-00100 | Pavement Widening (12" MINIMUM THICKNESS) | 2,804 | SQYD | 165.00 | 462,660.00 | 165.00 | 462,660.00 | | 0024 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 72 | LNFT | 313.00 | 22,536.00 | 185.00 | 13,320.00 | | 0025 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 29 | LNFT | 435.00 | 12,615.00 | 235.00 | 6,815.00 | | 0026 | 701-03-02102 | Storm Drain Pipe (Outfall) (42" RPVCP or 48" CMP) | 26 | LNFT | 188.00 | 4,888.00 | 380.00 | 9,880.00 | | 0027 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 57 | LNFT | 300.00 | 17,100.00 | 145.00 | 8,265.00 | | 0028 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 143 | LNFT | 198.00 | 28,314.00 | 155.00 | 22,165.00 | | 0029 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 2,871 | LNFT | 198.00 | 568,458.00 | 190.00 | 545,490.00 | | 0030 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 711 | LNFT | 225.00 | 159,975.00 | 230.00 | 163,530.00 | | 0031 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 2,597 | LNFT | 269.00 | 698,593.00 | 270.00 | 701,190.00 | | 0032 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 1,349 | LNFT | 314.00 | 423,586.00 | 245.00 | 330,505.00 | | 0033 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 12,150 | LNFT | 5.00 | 60,750.00 | 7.00 | 85,050.00 | | 0034 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 17,000.00 | 17,000.00 | 7,500.00 | 7,500.00 | | 0035 | 702-02-00300 | Manholes (R-CB-11 MOD) | 5 | EACH | 21,000.00 | 105,000.00 | 7,500.00 | 37,500.00 | | 0036 | 702-02-00600 | Manholes (R-CB-36) | 21 | EACH | 15,000.00 | 315,000.00 | 7,500.00 | 157,500.00 | | 0037 | 702-03-00100 | Catch Basins (CB-01) | 33 | EACH | 5,800.00 | 191,400.00 | 6,500.00 | 214,500.00 | | 0038 | 702-03-00200 | Catch Basins (CB-02) | 58 | EACH | 7,500.00 | 435,000.00 | 7,500.00 | 435,000.00 | | 0039 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 2,500.00 | 12,500.00 | 2,500.00 | 12,500.00 | | 0040 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 578 | LNFT | 95.00 | 54,910.00 | 110.00 | 63,580.00 | | 0041 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 50 | LNFT | 112.00 | 5,600.00 | 130.00 | 6,500.00 | | 0042 | 705-07-02000 | 4-Foot Single Gates for Chain Link Fence (4-Foot Height) | 5 | EACH | 1,100.00 | 5,500.00 | 1,300.00 | 6,500.00 | | 0043 | 705-08-05000 | 12-Foot Double Gates for Chain Link Fence (4-Foot Height) | 3 | DBGT | 1,800.00 | 5,400.00 | 2,200.00 | 6,600.00 | | 0044 | 705-09-00100 | Rebuilt Fence | 999 | LNFT | 39.00 | 38,961.00 | 115.00 | 114,885.00 | | 0045 | 706-01-00200 | Concrete Walk (5" Thick) | 3,674.2 | SQYD | 102.00 | 374,768.40 | 75.00 | 275,565.00 | | 0046 | 706-01-00300 | Concrete Walk (6" Thick) | 131.6 | SQYD | 162.00 | 21,319.20 | 85.00 | 11,186.00 | | 0047 | 706-02-00200 | Concrete Drive (6" Thick) | 1,196 | SQYD | 105.00 | 125,580.00 | 90.00 | 107,640.00 | | 0048 | 706-02-00400 | Concrete Drive (10" Thick) | 367 | SQYD | 155.00 | 56,885.00 | 110.00 | 40,370.00 | | 0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 145,000.00 | 145,000.00 | 250,000.00 | 250,000.00 | | 0050 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,419 | LNFT | 1.50 | 6,628.50 | 3.00 | 13,257.00 | | 0051 | 717-01-00100 | Seeding | 30 | LB | 45.00 | 1,350.00 | 54.00 | 1,620.00 | | 0052 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.90 | 1,900.00 | 3.00 | 3,000.00 | | 0053 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 29,000.00 | 29,000.00 | 25,000.00 | 25,000.00 | | 0054 | 726-01-00100 | Bedding Material | 2,516.8 | CUYD | 105.00 | 264,264.00 | 200.00 | 503,360.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 700,000.00 | 700,000.00 | 500,000.00 | 500,000.00 | | 0056 | 729-01-00100 | Sign (Type A) | 44 | SQFT | 35.00 | 1,540.00 | 33.00 | 1,452.00 | | 0057 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 10 | EACH | 278.00 | 2,780.00 | 360.00 | 3,600.00 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 148 | EACH | 25.00 | 3,700.00 | 30.00 | 4,440.00 | | 0059 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,770 | LNFT | 2.50 | 29,425.00 | 3.00 | 35,310.00 | | 0060 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.79 | MILE | 6,700.00 | 5,293.00 | 8,000.00 | 6,320.00 | | 0061 | 735-01-00100 | Mailboxes | 17 | EACH | 23.00 | 391.00 | 65.00 | 1,105.00 | | 0062 | 735-02-00100 | Mailbox Supports (Single) | 17 | EACH | 278.00 | 4,726.00 | 330.00 | 5,610.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 150,000.00 | 150,000.00 | | 0064 | 741-20-01080 | Water Main (6" PVC) | 128 | LNFT | 515.00 | 65,920.00 | 145.00 | 18,560.00 | | 0065 | 741-20-01120 | Water Main (10" PVC) | 4,609 | LNFT | 200.00 | 921,800.00 | 185.00 | 852,665.00 | | 0066 | 741-21-00300 | Gate Valve (6") | 8 | EACH | 4,200.00 | 33,600.00 | 4,000.00 | 32,000.00 | | 0067 | 741-21-00500 | Gate Valve (10") | 13 | EACH | 9,000.00 | 117,000.00 | 9,300.00 | 120,900.00 | | 0068 | 741-28-01020 | Service Connection (3/4" PVC) | 30 | LNFT | 482.00 | 14,460.00 | 1,300.00 | 39,000.00 | | 0069 | 741-28-01040 | Service Connection (1" PVC) | 10 | LNFT | 400.00 | 4,000.00 | 1,500.00 | 15,000.00 | | 0070 | 741-28-01100 | Service Connection (2" PVC) | 5 | LNFT | 550.00 | 2,750.00 | 2,300.00 | 11,500.00 | | 0071 | 741-31-00100 | Relocate Water Meter | 3 | EACH | 1,400.00 | 4,200.00 | 1,900.00 | 5,700.00 | | 0072 | 741-33-00100 | Adjust Service Connection (20’ or less) | 45 | EACH | 1,800.00 | 81,000.00 | 460.00 | 20,700.00 | | 0073 | 741-34-00100 | Adjust Service Connection (greater than 20’) | 360 | LNFT | 80.00 | 28,800.00 | 66.00 | 23,760.00 | | 0074 | 741-35-00100 | Adjust Valve or Meter Box NPS 2 OR SMALLER | 35 | EACH | 500.00 | 17,500.00 | 660.00 | 23,100.00 | | 0075 | 741-35-00100 | Adjust Valve or Meter Box NPS 3 OR LARGER | 10 | EACH | 645.00 | 6,450.00 | 990.00 | 9,900.00 | | 0076 | 741-37-00100 | Removal of Water Valve and Box | 10 | EACH | 438.00 | 4,380.00 | 660.00 | 6,600.00 | | 0077 | 742-01-00000 | Sanitary Sewer Pipe 10" PVC SDR 35 | 201 | LNFT | 415.00 | 83,415.00 | 330.00 | 66,330.00 | | 0078 | 742-01-00000 | Sanitary Sewer Pipe 18" PVC SDR 35 | 3,462 | LNFT | 658.00 | 2,277,996.00 | 595.00 | 2,059,890.00 | | 0079 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 45 | EACH | 4,500.00 | 202,500.00 | 2,600.00 | 117,000.00 | | 0080 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 360 | LNFT | 255.00 | 91,800.00 | 170.00 | 61,200.00 | | 0081 | 810-04-00100 | Hand Railing 1 1/2 inch Schedule 40 Galvanized Pipe | 144 | LNFT | 152.00 | 21,888.00 | 99.00 | 14,256.00 | | 0082 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 53,556 | INLF | 1.00 | 53,556.00 | 2.00 | 107,112.00 | | 0083 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 356 | INLF | 1.00 | 356.00 | 2.00 | 712.00 | | 0084 | NS-700-00100 | Trench Drains | 80 | EACH | 1,100.00 | 88,000.00 | 4,600.00 | 368,000.00 | | 0085 | TS-702-37901 | New Water Valve Manhole (4" through 12" Valves) | 13 | EACH | 7,900.00 | 102,700.00 | 8,500.00 | 110,500.00 | | 0086 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 3,000 | CUYD | 10.00 | 30,000.00 | 200.00 | 600,000.00 | | 0087 | 201-01-00100 | Clearing and Grubbing | 2.39 | LUMP | 45,000.00 | 45,000.00 | 75,000.00 | 75,000.00 | | 0088 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -810.9 | CUYD | 0.01 | -8.11 | 1.00 | -810.90 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,954,325.39 | | 11,249,519.10 |
|